ML20062D820
| ML20062D820 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 10/19/1978 |
| From: | Rebelowski T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20062D819 | List: |
| References | |
| 50-247-78-30, NUDOCS 7811300340 | |
| Download: ML20062D820 (5) | |
See also: IR 05000247/1978030
Text
_
.
.
_
__
'
U.S. NUCLEAR REGULATORY COMMISSION
,
0FFICE OF INSPECTION AND EN"]RCEMENT
-
Region I
!
l
I
Report No.
50-247/78-30
Docket No.
50-247
License No. DPR-26
Priority
Category
C
-
Licensee:
Consolidated Edison Comoany of New York, Inc.
4 Irving Place
Facility Name:
Indian Point Nuclear Generating Station, Unit 2
' spection at:
Corporate Headquarters, New York City
Inspection condu *e -
September 13 ar d 14,1978
/4//7
/ 2~
Inspector :
"
T. RebelcIski, Reactor Inspector
/cate/ signed
date signed
(
_
-
date signed
..
- Approved by:
{
/d-/g -7g
'
R. Kaifnig,/hief
eactor Projects Section
care signed
Nop-RO&NS
anch
Inscection Su=ary:
Inspection on Sectember 13 and 14,1978 (Recort No. 50-247/78-30)
Areas Inspected: Routine, announced inspection of the licensee's response
.
'
to IE Circular 78-08 (dated May 31,1978) entitled " Environmental Qualif-
ication of Safety Related Electrical Equipment at Nuclear Power Plants."
This inspection involved eight inspector-hours at the corporate office by
one NRC regional based inspector.
Results: No items of noncompliance or deviations were identified.
?S1130T!c
Region I Form 12
(Rev. April 77)
_
r - - ,
7
f
.
.
.
.
__
. _ _ _ _
.
'
.
.
I
DETAILS
l
1.
Persons Contacted
Mr. W. Duggan, Senior Engineer
Mr. C. Jackson, Nuclear Licensing Engineer
Mr. M. Scott, Engineer
Mr. P. Szabodos, Electrical Engineer
2.
Inspection Purcose
A management interview was held at the start of the inspection on
September 13, 1978, to explain that the purpose of the inspeEt' ion
was to review the actions taken by the licensee in regard to Inspec-
tion and Enforcement Circular 78-08, transmitted to the licensee
'
on May 31, 1978.
3.
Insoection Scoce
Thc areas reviewed during this inspection encompassed those items
listed in IEC 78-08, involving problems that have been identified
in ensuring environmental qualification of safety-related electrical
components. The following were addressed:
a.
whether a specific licensee individual has been assigned
responsibility for reviewing identified problems and docu-
mentation referenced in IEC 78-08;
b.
whether a comparison has been made between the plant specific
circumstances at Indian Point, Unit 2 and problems identified
by IEC 78-08;
c.
what actions have been taken by the licensee in regard to the
subject reviews, the status of any corrective actions planned
or taken, and the schedule for finishing the -review of any
areas not yet complete;
d.
a sampling review of documentation which supports the environ-
mental qualification of electrical components, including
l
electrical connectors, containment electrical penetrations,
'
l
terminal blocks, cables and cable splices, transmitters and
valves.
'
l
i
1
-
- - - . - -
.
-
,
.
,
.
,
,,m-,
..%..
.a
-e
.
.-,
.
"
3
4.
References
Documentation presented to the inspector during this review is
listed below. Material listed under items (b) thru (1) were used
to the extent necessary to verify documentation existed to support
electrical component qualifications.
a.
IEC 78-08, Environmental Qualification of Safety-Related
Electrical Equipment at Nuclear Power Plants, May 31, 1978,
including fourteen separate references addressed in the
circular;
b.
Consolidated Edison Co.'s response to IE Bulletins 77-05 and
77-05A, dated December 13, 1977.
,
c.
Consolidated Edison Co. 's response to Bulletin 77-06, dated
'
December 2,1977 and January 30, 1978.
,
d.
Consolidated Edison Co. 's response to IE Bulletin 78-02, dated
February 15, 1978.
e.
Consolidated Edison Co.'s response to IE Bulletin 78-04, dated
March 23, 1978.
f.
WCAP 7354L, Topical Report: Supplier Post-Accident Testing
of Process Instrumentation,
g.
WCAP 9003, Fan Cooler / Motor Unit Test, January,1969.
h.
WCAP 7343L, Reactor Containment Fan Irradiation Testing of
Fan Ccoler/ Motor Insulation, June,1969.
i.
WCAP 730ll, Report of Test Results on Hydrogen Flame Recom-
biners , March,1969.
j.
WCAP 7410L (Volume 1), Topical Report: Environmental Testing
of Engineered Safety Feature Related Equipment.
,
k.
WCAP 7410L (Volume 2), Topical Report: Environmental Testing
,
of Engineered Safety Feature Related Equipment.
1.
Final Safety Analysis Report, Q. 7.8.
,
t
.
. .
7
- - . .
.---
.
-
.
4
,
i
i
Except as noted in Detail 5, no inadequacies were identified during
'
the sampli.ng review of the above items.
j
5.
Findings
The following unresolved items were identified during the inspection
l
of the licensee review of IEC 78-08 and require further action by
l
the licensee.
!
a.
Cable Solices
1:
The licensee has~ established that during construction, splices
in safety-related components and penetrations were to be accom-
plished to the " Splicing and Terminating Instructions," Draw-
ing 9321-LL 3011 which specifies the type of seal to be in-
l
stalled. Environmental qualification of this type of seal
+
and an in-plant verification of installed splices has not been
'
completed.
(247/78-30-01)
1
b.
Stem-Mounted Limit Switches
The licensee identified in a response to IE Bulletin 78-04,
(March 23,1978), the future replacement of a number of limit
switches. A modified operating procedure is currently in
,
effect to monitor limit switch positions. (247/78-30-04)
c.
Motor Ocerated Valves
The licensee is reviewing the WCAP 7410-L for verification
of environmental qualification of safety-related motor oper-
ated valves.
(247/78-30-02)
d.
Terminal Blocks
The licensee has not identified documentation for the environ-
,
mental qualification of terminal blocks with the associated
terminal boxes and cable connections for safety-related
equipment.
(247/78-30-03)
e
l
i
i
[
.
- ~ -
-
-m
-
-
-
- > -
.
.,
. . _ .
_ _ . . .
.
..
,
5
The above unresolved items require the following:
Correlatior of actual installed material vs. documented generic
-
test data.
Review of the quality assurance records for the environmental
-
tests.
Further review by the licensee's engineering staff as to the
-
adequacy of the environmental testing for the existing equip-
ment installed in safety-related systems.
The licensee expects to complete the review by October 30, 1978.
This review will include visual verification of the existing equip-
ment on a sampling basis.
These items will be reviewed ca a subsequent inspection.
6.
Unresolved Items
,
Unresolved items are those items for which more information is
required to determine if the items are Acceptable or Items of
Noncompliance. Unresolved items are contained in Detail 5 of
'
this report.
7.
Exit Interview
A management meeting was held with licensee personnel (denoted in
Paragraph 1) at the conclusion of the inspection on September 14,
1978. The purpose, scope and findings of the inspection were
discussed as they appear in this report.
,
!
1
.
i
>
- - - -