Request for OMB Review & Supporting Statement Re 10CFR51, Environ Protection Regulations for Domestic Licensing & Related Functions. Estimated Burden Hour Is 33,902
ML20062D473
Person / Time
Issue date: 11/07/1990
From: Norry P
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
To:
References
OMB-3150-0021, OMB-3150-21, NUDOCS 9011130248
Download: ML20062D473 (14)


Text

- _ _

)

Ie uno,,

t cert!

W d;;ed83 Request for OMB Rev7e? @l@gg important heac!instructio u octore comettre tom.. Do r t' ne t"e same SF M 5end tntee comes of th:s to n' the rnatenal to be reviewe0. and tot to reouest botn en lucuto Orot: 10291, revie. ano app'osai unaer paperwo' -three copies of tne supportirg statement t; the Paperwork Resu: tion A '

Answtf all cuestior.s in Pe 1 : if tnis teovest it

  • r reue, unce E.C Office of information and Perutatory Aff airs 10291, comp;ete hvt it ano sy n tn teguate, urtitication it tnis Office of Manesenient ant; buoret reouest is 1or approsa, unoet tr e Peerv.o A ket.s: tion Act ana 6 Ctr, Attention _ Doc Act Librart. koom 3201 1320. wp Frt l'. et.rnpicte Part hi ana 5.,9 the one wott ce-ti'icatiot s'.asnintt:n. CO 20503 PART l.-Complete This Pa't for All Ficouests.
1. Devanment<arenc e saa bw iTmcv ons:naw ve.0cn

. 2.Arencvcoor U.S. Nuclear Regulatory Commission 3

1 5

0 L

3. r..me oi smon wn, can nut rnw r. uestions iewon ine.cc Te,conone nunr.,e Hazel Smith
301

) 492-1219

<. Tiu, onntarmatien to,e:t+n o, eu emannt 10 CFR 51, Environmental Protection Regulations for Domestic Licensing and Related Functions L

t,. tege aciuont, tor informsw. coacctma or ewe rcne vmrea surennoe. Avos tan m becsn.e oraen 42 us:. J2,0110)

__ e

6. s.f tectee psdac tchea a i rtat m D b C Feoerst arencies ot empoven 1 C :noividua.6 or nouset.oica

? E

  • c'~

6 20 Non orontinstitutions y

.n O btete n' ecauovernment 4 D( bus + esses or o'r er tv n c4

? O bmatibuunesmor orcanaation:

PART U.-Complete Tnts Part Only if the Ftecuest is for OMB Review Unoer f.necutive Order 12291

7. kegulation leentifier Numtier (Pith g

_ ~ ~

  • _. er Nane awgneu 2 lt.1ype of sut>miwon (cne:* ont m ea:n causnro lypo et revnew reevested

=

Classsrscarecri Stage of cese#opment 1 C Stancard 1 C Maior i U Prooosed or era't 2 C Pencing 2 C t.nnma o-I ] Finado intenmtinat witnencrotocosta 3 U tmergency

,, U firw or intenm hnat vatnout pnot proposa.

4 C $tatutbty or ludicial Deadbne

$. CF M section aiittten I

csr l_

10. Does this teruution conte reporti g of recereneepm;' recei enh, that reou're O!.'B sitroval under the Paper
  • orb Recseteon Act I__

acd 5 CFR A3N?

O ves CNo

11. H c maior rua a ine'e a 'epwwimoa t puhes a taened' 1 C ies 2ON 9 'Ns " &1 OMO v+se the a'.aivs P

- 3 C Yes 4 b NO Ct.rtification for hegulatory Supmtsstorn m suem.ttmg tna recuest tot oMB tenew. the autnuget' tegueto j (ontact and the, p'ofram official certif y that the requirefnents of [.o 12291 and any appicabe onilCy directives LDre Deer comp ed with bignature et p'opam othco Patt

, bgnatute 014.thorgeo reggiatory contact Date ik. tohtp use onty)

. ()

s

_w stanoard f orm 8)(ke. !# E.t

' Piewas eatem coso.e a E l 108

\\/ j(0f4 s cre ino'tsc'>ced b, OMf F

NSN 7$.iO(C D4 day

.,er o 1229 l

I S'011130248 901107 PDR ORG El..lSOMB PDC

)

iim.i i i.i,,,,,,,,,,,,_,,,,,,,,_, _ _

.y SART lli.-Comolete This Part only if the Request is for Approval of a Collection of Irtermetion Under the Paperworic Reduction Act and 5 CFR 1320.

us. A: strut-Ns:ue neent un ano setecteo puuic m so woros cons

" Nuclear Facilities, Environmental Protection" 10 CFR 51 requires submittal of environmental data from licensees and applicants in order for the NRC to make decisions concerning environmental protection.

? 4. T ype of I' de"r aison coi'ec tion (Crfc4 on4 0^e)

J:tormanon conections twr cantarned ks ru;ea C detuar tuomen 2 C Emergency subm.ssion(certificationattachro) latormatisn vaectsons ccntamos in rules J E Cus'ir g r vu ancuro erange p*coosew 6 Final or intenm fmal without poor 6.PRM

7. Enter cate of expected or actual Feoerai

.' C 'lotme of crtresto rwemakirg p*RY)

A C Regular submission Regester publication at this stage of ru'emaking 6 C rinat f M4 was c'woup, puot'shed B C Emerger.cv submission tee riscation effacher) tr'8onth. oaV. FNri

',L hpe of rerew reauettto tcheck ontvorre)

LC f 4w rtiecten 4 C Reinstatement of a oreviousiv approved collec' ion for wnsen noorovat "85 "D"'d

? M Gevaioa c' c cu<renti, eepenvec conection h il bterision of te e entwretan aate ut a turrently approvec conection 5 C Distmg conect:en in use viitnout an OMB controt number vmout r v c aree m t~e s s'eee or m toe rnethon et eminction u

i

. f. mne s **wt wm vurncert s > McIvar stancorc/octronan form numoerts))

22. Putpose of information conection (cneck as many as acety) 1 C Appfstation for benefits I

2 C Program evaluation

i. f nnual A!Dortiag er criticture turcen 1

3 C Csentralpurpose statistics M

41 Regulatory or compliance 1ilumoetof resanoents.

I 1 Nur-ter of rast oates e e' resconcent 1

5 C Program planningormanagement j

3 T<tal eni n.at res'en ts (tme 1 t mts er D 6 C Research I

-.-.304.J 7 C Audit 1

=, Hours ur 'est,onse Jlrtat hfmfre it*nime d8 Q 9n? I

3. enauas rmrtrememg cu een
23. I reovency of recorovecoir.g or report ng (cncen e,I tner acory) i NJett;er of 'ecoforeepers 1 C Recorakeeping i

2 Annuairwrs c.or reccmsener.

/teporting i

1 Tctaheco necong rours thre j t+es Ime 2) l 2 L onoccasion i Recorc sceoier rvwun c er:en i

years 3 y m,9 P, Tetal ennve' Nece*.

4 C MonthN 33,902 3 C quari,,iy

>aeou me2.re m.usc.,e;sa).

an cunenm.tinn<ew,.

20,450 s C sen,.ennu,n,

? DHferect (c'e J.ess ene />

+1LaE7 1 7 C Annuady

?.tmanallon crr phyer*nce 8 C Biennially 9 C o:her(oescncek A Ngram as te,

! Mnest-nt,

I

+ 1 *4. d R 7 I

.0, ",orrent (cest re:entl OMB contrei curtt'er or etmment number l 24. Responauts' obugation te como4(checA theatrongest ochgatron thatsophes) l

_._3150-0021 i C voiuntary 1 unsteo e pirst on uta I

2 C Recuned to ootam or retain a benetit l

3_ years from approval I

3 3 uannatorv

3. s e e reconosnts rir smy sour.ational agencies or mstitutions or is the primary p.irecse of the conection reisted to Federal education programs? O yes @ No

- '5. Duas tre agency use sarocurg to se'ect responcents or coes tne agericy recommend or orescrite the use of samponE or statistical analysis Cyes & No av responcentst J

I l 3~I7guotofv avinority for tee in'ormation conection 10 cra 51

o, rn

.,,, etn,,,,o,c,ty);

i 4perworn Gertaticatian 1 si.Dr+cte.g (na icquest fer OMB appro.ai, tre agency head, the senior official or an authorged representative, certifies that the requirements of 5 CFR 1300, the Wytcy xct. ctatistiw sunearcs or nrrectwes, a nd any other applicacie mtarmation pohcy cuectives nave eeen comphea with.

l dn.nure om.;g admemi Date s

J knuure ci nex:, reac. ee se,to omc:aior en awtnoraec representatwe

, Date

, Patricia G. Norry, 050 for Information ResourceDaIage nt

    1. /0

,,g M*'

41 CPO 1984 O I 453-776

^~'

e>

iAP.T 1ll

';t-ci 0 ihD t art Cnly if the Request O for Approval of a Collection 8

of latermation unser the Psoorwerk Reduction Act and 5 CFR 1320.

p a.ninct m :e eeos aes ana ctectecovoiicinso oraseriess

" Nuclear Facilities, Environmental Protection" 10 CFR 51 requires submittal of environmental data from licensees and applicants in order for the NRC to make decisions concerning environmental protection.

s. '.or ot : *:"* 3 von ter ewon t:tecx onir one)

, st;nratoen conectror., r:t tenternes m twea

[

<-*2,v e n ~ n en 2 C imergency suom ssion teerter< cation attaentos

.irartrat cn c.cectner s ccmarnee M rules 3 eb ;u4*18 rW3toS.*J c*Ange procoses) 6 Finat or er'enm final without onor.J RM E ater este of eicected or actual Fecerai C WJ ai **::!$M r; emaki*g f.DD)

4 C 8iegalar submrttion DeRitter twohcation at this stage of twefnpking (v.e3 ~ trin.=w agoin*ec B [ [?ergercv gutm ggionice *

  • cat om ar3* hen M*'Onfo car /ws

]I i

. Js t '.h '.w co We!!!C ic*ece o,esv cne)

] e,n ect ar a

E e,ns'aterhent of 8 0'eviovbiv soorove$ collecison f Qt vvaic9 90erovM Eev 90 *

  • 9"tif sod'eved CodeCleon

' l eet"ett 't'11 ate gt 1 Cyrf eatly poorovey coitecte

)

'.s st#g coaect on n une wthout an O'v1B tC9 trot nufDCet

  • ?' % Ur c'.t* 3*ee M **9 4.Ji?9 ate t'r in the f"ethoo of c%ection
  • at.+*

,r t p :,,,cwe stancaremrtonat torrn evr-certs))

22. F"reese c'ir,tortat.on cootcten tev;a ss raw as s M 4

1m 9:ocat on or tencitt 2 [ or:g'am evaiuat.on 7"..o

7-1 P ; i:icsve tur:en 3 C Weralovroose statistics M

.8 [ c gwawy or compuance e

.areer y rmpeen,g

.c m, " er cms c v res::neemt.

I 3 C 8'egram orannirg er r anagervent

' *, m u.t.m m e

,1. e,, ve it

?A S C desea en

.er*.c 9t:. o 1.304 a bot

  • +;i.c m n ~

ansa?

.y m -wiee:ea

43. %9ncy et ee:oro.ceoirs or,ccort.rwe:o, f ur acow

. [ 4emweoire r e e ~ **:v. nees m o ae2 v..y hoorring k

i i ;3:, et; 1 990u 4 c143 4 / e j

  • f 5 Ee /)

2 [ Cnoccasion

....: en,ra e :.. c,

mi

)

e s teply S C'^

  • 39 3 [ *jon.eq 4t.. u. 15 ; s e o. L,

33,902 3 u.,,

g,a.te,,,

i 20>4$0 6 L_

aemi annuaiu

s f.,3

.ety.

' +s* e n + > ns -e i; b k1LAh?..

': Ar%a,,y 3 Z 3 enn,au, war :n v :nrer. >c.

r 0-

      • ee gescerep.

b treo r*,

e ne

+1't.d O i

. n r.

.ut e to L, e cyt*n v:e* v n.mrrev rumcer

14. 3escarcents oc, gavon to comtm:necn t~e st:o:' gest ett gaticn tratate:ws;

. 3150:002L

.E u wr

-.itt: a i T 1: na

] etovired to cata.n or retain a cerent

.,_3 years from approval

. -X v r o2 tory W.it.1 :* "7 ' y ecscJt' ora' ?.genc'et or irstituttons or is the orgrary estrose et tee co,:ection re' ate 3 to Feceral educat46 caograrns! [ f es [ tio

3. - e I
i..w / 3 ; seats ste SU": ret to se eG teloo". Cents of Coet tre uency recomme"0 cf o' esc' te t*e wae of $4toi og or st3t:stica: anuW$is Yet h No i

7 5,'ta n e3tt

.r 5 20% A,' % 'C' !'e t "* ? ate csection I

10 _ a_E

. o, r,

a, c.n,r uc,e.,a tovisen.noinatsan

.e y c 1, a.est Nr J:. 3 a0 pro.m. t*e n ency f eaa, the senior othcial or an aut97 ec rec *esentatwe. cerH es talt tre reoy.remen*g of $ CF9 Q*Q, v 3 v.

t

  • 7t* J m;M2s o' rMe;!'.e$ 00 any other apphCaoie int
  • r"ation ochcf oire:tms ms,e teen cer"o led Wdn rDate

. ta

a Cate 7 i;.1 y " ri N saa ?s 4v c':: : J o' n a.tnarJe, rep *esentative.

' 'p

Patricia G. Norry, DSO for Information R ou'rce N age nt N/ O 4 Ot'O 4 1664

") - 4H.776

4 l

SUPPORTING STATEMENT L

FOR 10 CFR PART 51

" Environmental Protection Regulations for Do'nebtic Licensing and Related Regulatory Functions" OMB Clearance No. 3150-0021)

DESCRIPTION OF THE INFORMATION COLLECTION Section 51.16(b) requires persons who wish to have proprietary information withheld from public disclosure to submit a request justifying the withholdings.

This information is needed by NRC to determine if the applicant / licensee's rea-sons are valid and if the information qualifies for exemption from disclosure.

The Offices of Nucisar Reactor Regulation (NRR) or Nuclear Material Safety and Safeguards (NMSS) will begin review of the request within thirty days of receipt.

--J Should staff determine the request to be justified, disclosure is withheld.

Should staff determine the request to be unjustified, the Office of General Counsel-(OGC) reviews the request and the applicant / licensee is notified within two weeks ef the OGC review.

Sections 51.41 and 51.45(a) of 10 CFR Part 51 require certain persons to submit environmental information and environmental reports, respectively.

These persons are license applicants or petitioners for rulemaking under the following:

Production and Utilization Facilities 51.50 Construction Permit Stage 51.51 Uranium Fuel Cycle Environ.nental Data - Table S-3

~

51.52 Environmental Effects of Transportation of Fuel and Waste -

Table S-4 51.53 Supplement to Environmental Report (Operating License Stage) 51.54 Manufacturing License Materials License c

51.60 Materials Licenses 51.61 Independent Spent Fuel Storage Installation License 51.62

' Land Disposal of Radioactive Waste Licensed under 10 CFR 61 Rulemaking Petition'.srs 51.68 Petit 4n for Rulemaking 1

__m_m_-

.____.,___.,_._.___m__m.._

___m_m____

m m_

_A___,,,,,,,mm

e The environmental reports are submitted to the Office of Nuclear Reactor Regulation or Office of Nuclear Material Safety and Safeguards for their use in preparing a Draft Environmental Statement (DES).

Subsequently, NRC staff prepares a Final Environmental Statement (FES).

The Environmental Statements give detailed consideration to the environmental impacts associated with construction and operation of a proposed facility and assess impacts within the framework of the available alternatives. Without the information provided in the environmental report, NRC cannot evaluate environmental impact or prepare draft and final Environmental Impact Statements (EIS), as required by NEPA.

The NRC review of environmental reports normally begins within 30 days of the report's receipt.

Section 51.41 requires the submittal of environmental information to be used in aiding the Commission in complying with section 102(2) of NEPA, during its review of an application for a permit, license or other form of permission, or amendment to or renewal of a permit, license or other form of permission, or a petition for rulemaking.

All persons required to submit an environmental report must include in it certain general information.

Section 51.45(b) describes that information.

The environ-mental report shall contain a description of the proposed action, a statement of its purposes, a description of the environment affected, and a discussion of the following considerations:

(1) The impact of the proposed action on the environ-ment, (2) any adverse environmental effects which cannot be avoided should the proposal be implemented, (3) alternatives to the proposed action, (4) the rela-tionship between local short-term use of man's environment and the maintenance and enhancement of long-term productivity, and (5) any irreversible and irre-trievable commitments of resources which would be involved in the proposed action should it be implemented.

Section 51.45(c) requires the inclusion of an analysis in the Environmental Report which considers and balances the environmental effects of the proposed action and the alternatives available for reducing or avoiding adverse environ-mental effects, as well as the environmental, economic, technical, and other benefits of the proposed action.

Section 51.50 (Environmental Report - Construction Permit Stage) requires each applicant for a permit to construct a production or utilization facility, that is within the purview of Section 51.20, to submit information specified in Sections 51.45, 51.51 and 51.52.

Section 51.51 (Uranium Fuel Cycle Environmental Data - Table S-3) requires that r

every environmental report prepared for the construction permit stage of a light-water-cooled nuclear power reactor, and submitted on or af ter September 4, 1979, shall take-Table S-3, Table of Uranium Fuel Cycle Environmental Data, as the basis for evaluating the contribution of the environmental effects of uran-lum mining and milling, the production of uranium hexafluoride, isotopic enrich-ment, fuel f abrication, reprocessing of irradiated fuel, transportation of radio-active materials and management of low-level wastes and high-level wastes related to uranium fuel cycle activities to the environmental costs of licensing the nuclear power reactor.

Table S-3 shall be included in the environmental report and may be supplemented by a discussion of the environmental significance of the data set forth in the table as weighed in the analysis for the proposed facility.

2

Section 51.52 (Environmental Effects of Transportation of Fuel and Waste -

Table S-4) requires that every environmental report prepared for the construc-tion permit stage of a light-water-cooled nuclear power reactor, and submitted after February 4,1975, shall contain a statement concerning transportation of fuel and radioactive wastes to and from the reactor.

That statement shall indicate that the reactor and this transportation either meet all of the condi-tions in paragraph (a) of this section or all of the conditions in paragraph (b) of this section.

Section 51.53(a) (Supplement to Environmental Report) states that the applicant shall submit supplemental information to the environmental report for the appli-cation for operating license and for the application for renewal of a license, as explicitly stated in S 51.20(b)(2).

The applicant only needs to discuss matters described in 51.45, 51.51, and 51.52 to the extent that they differ from those described in the NRC's FES.

Section 51.53(b) allows for the post operating license stage.

Applicants for a license amendment authorizing decommissioning or license amendment to store spent fuel shall submit copies of a document entitled " Supplement to Applicant's Environmental Report - Post Operating License Stage." The supplement is to reflect any new information or significant environmental change associated with the applicant's proposed decommissioning activities or with the applicant's proposed activities with respect to the planned storage of spent fuel.

Section 51.54 (Environmental Report - Manufacturing License) states that each applicant for a license to manufacture a nuclear power reactor, or an applicant for amendment to a license to manufacture who is seeking approval of a final design of a power reactor shall submit with itt application an environmental report that addresses environmental matters specified in Part 52, and shall contain the information specified in Section 51.45, as appropriate, Section 51.55 (Environmental Report - Number of Copies; Distributioni states that each applicant is required to submit 41 copies of an environmental report.

The applicant is to retain 109 copies of the report for distribution to parties and boards in the NRC proceeding (hearing process), and for distribution to Federal,' State and local officials.

Section 51.60(b) requires each applicant to prepare an environmental report for the following types of actions:

(1) Issuance or renewal of a license or other form of permission for:

(i) Possession and use of special nuclear material for processing and fuel fabrication, scrap recovery, or conversion of uranium hexafluoride pursuant to 10 CFR 70.

l

-(ii) Possession and use of source material for uranium milling or production of uranium hexafluoride pursuant to 10 CFR 40.

1 i

(iii) Storage of spent fuel in an independent fuel storage installation (ISFSI) pursuant to 10 CFR 72.

(iv) Receipt and disposal of radioactive waste from other persons pursuant to 10 CFR 61.

l 3

l ll

(v) Processing of source material for extraction of rare earth and other metals.

(vi) Use of radioactive tracers in field flood studies involving secondary and tertiary oil and gas recovery.

{

(2) Issuance of an amendment that would authorize or result in:

(i) A significant expansion of a site.

(ii) A significant change in the types of effluents.

(iii) A significant increase in the amounts of effluents.

(iv) A significant increase in individual or cumulative occupational radiation exposure.

(v) A significant increase in the potential for or consequences from radiological accidents.

t (vi) A significant increase in spent fuel storage capacity; in a license or other form of permission to conduct an activity listed in 51.60(b)(1) above.

~

Termination of a license for the possession and use of source material (3) for uranium milling.

(4) Amendment of a license to authorize the decommissioning of an independent spent fuel stvage installation (ISFSI) pursuant to 10 CFR 72.

(5) Issuance of a license amendment pursuant to Part 61 authorizing (i) closure of a land disposal site, (ii) transfer of the license to the disposal site owner for the purpose of institutional control, or (iii) termination of a license at the end of the institutional control period.

(6) Any other licensing action for which the Commission determines an environmental report is necessary.

Section 51.61 requires that each applicant for issuance of a license for storage of spent fuel in an independent spent fuel storage installation (ISFSI) pursuant to 10 CFR 72 submit with its application an " Applicant's Environmental Report -

ISFSI License." The environmental report shall contain the general information specified in 51.45 and shall address the siting evaluation factors contained in subpart E, 10 CFR 72.

Section 51.62(a) requires that each applicant for issuance of a li' ense for land c

disposal of radioactive waste pursuant to 10 CFR 61 submit with its application an " Applicant's Environmental Report License for Land Disposal of Radioactive Waste." The environmental report and any supplement to the environmental report may incorporate by reference information contained in the application or in any previous application, statement or report filed with the Commission provided that such references are clear and specific and that copies of the information so incorporated are available in the NRC Public Document Room at 2120 L St. N.W.,

Lower Level, Washington, D.C., and in any public document room established by the Commission near the proposed land disposal site.

4

Section 51.62(b) requires that the environmental report contain the general information specified in 51.45, shall address the applicant's environmental monitoring program required by 10 CFR 61.12(1), 61.53, and 61.59(b) and shall be as complete as possible in the light of information that is available at the time the environmental report is submitted.

Section 51.62(c) requires that the applicant supplement the environmental report in a timely manner as necessary to permit the Commission to review, prior to issuance, amendment or renewal of a license, new information regarding the environmental impact of previously proposed activities, information regarding the environmental impact of any changes in previously proposed activities, or any significant new information regarding the environmental impact of closure activities and long-term performance of the disposal site.

Sections 51.66(a) and (b) specify the number of copies that are to be submitted of an environmental report, or any supplement to an environmental report, for an application for a license, an amendment or renewal of a license covered under 10 CFR Parts 30, 32, 33, 34, 35, 39, 40, 61, 70 and 72.

In addition to license applicants, certain petitioners for rulemaking must submit environmental reports.

Section 51.68 requires that petitioners for rulemaking who request amendments of 10 CFR Parts 30, 31, 32, 33, 34, 35, 40, or 70 concerning the exemption from licensing and regulatory requirements of, or authorizing general licenses for, any equipment, device, commodity, or other product containing byproduct material, source material, or special nuclear material submit a " Petitioner's Environmental Report," which contains the general information specified in Section 51.45.

Section 51.69 specifies the number of copies of environmental reports that are to be submitted for petitions for rulemaking covered by Section 51.68.

A.

JUSTIFICATION 1.

Need for the Information Collection The National Environmental Policy Act of 1969, as amended (NEPA) directs that, to the fullest extent possible:

(1) the policies, regulations, and public laws I

of the United States shall be interpreted and administered in accordance with the policies set forth in NEPA, and (2) all agencies of the Federal Government shall comply with the procedures in Section 102(2) of NEPA except where compli-ance would be inconsistent with other statutory requirements.

The regulations I

in Subpart A of 10 CFR Part 51 implement Section 102(2) of NEPA in a manner which is consistent with the NRC's domestic licensing and related regulatory l

authority under the Atomic Energy Act of 1954, as amended, the Energy Reorgani-zation Act of 1974, as amended, and the Uranium Mill Tailings Radiation Control Act of 1978, and the Commission's announced policy to take account of the regu-L lations of the Council of Environmental Quality published November 29, 1978 i

(43 FR 55978-56007), voluntarily, subject to certain conditions.

l l

2.

Agency use of Information Part 51 of the NRC's regulations specifies information and data to be provided by applicants and licensees so that the NRC can make determinations necessary to adhere to the policies, regulations, and public laws of the United States 5

1

e which are to be interpreted and administered in accordance with the policies set forth in the National Environmental Policy Act of 1969, as amended.

The NRC completes its review of this information in approximately one year.

When litigation is not involved, this review could be completed in approximately six months.

The criteria the NRC must adhere to when considering the environmental informa-tion of a proposed action is specified in Sections 51.20, 51.21, 51.22 and 51.30.

3.

Reduction of Burden Through Irformation Technology There is no legal obstacle to the use of information technology.

Moreover, NRC encourages its use.

4.

Effort to Identify Duplication In cases where renewals or updates to environmental reports are required, reference to the previously submitted documents is acceptable; only revised or new information is required to be submitted to the NRC.

The Information Requirements Control Automated System (IRCAS) was searched and no agency duplication was found.

5.

Effort to Use Similar Information Information submitted to other Federal Government and State agencies may be referenced.

6.

Effort to Reduce Small Business Burden The NRC anticipates that only seven universities will be expected to comply with 10 CFR 51 during.the effective period of this clearance.

These filings will support renewals, power upgrades and decommissioning.

7.

Consequences of Less Frequent Collection This information is submitted by applicants and licensees when the requested action requires NRC to make a determination consistent with the provisions of the National Environmental Policy Act of 1969, as amended.

Thus, the informa-tion is submitted as necessary for NRC to assess non-radiological safety (envi-ronmental) issues from the standpoint of protecting the health and safety of the public.

8.

C_ircumstances Which Justify Variation from OMB Guidelines The provisions of 10 CFR Sections 51.55, 51.66 and 51.69 specify the number of copies that are required for environmental review by Federal, State and local agencies.

These reviews are necessary so that NRC can fulf_ill its authority and responsibility mandated under NEPA.

A total of 150 copies are required for review by several Federal and State agencies, and for use in the NRC's litiga-tion process.

6

a 9.

Consultations Outside the Agency There has been no consultation with other agencies or individuals during the current clearance period.

However, public comments were solicited during the rulemaking stage.

Moreover, when an environmental impact statement (EIS) is prepared by the NRC, the draft EIS is sent out for public comment.

10.

Confidentiality of Information Section 51.16(b) requires persons who wish to have proprietary information withheld from public disclosure to submit a request justifying the withholding.

Proprietary information is protected in accordance with the provisions of 10 CFR Section 2.790(b).

However, none is anticipated.

11.

Justification for Sensitive Questions Part 51 information collections do not involve sensitive or private information.

12.

Estimated Annualized Cost to the Federal Government The staff reviews vary in complexity (and in cost to Government) depending on the type of proposed action and the type of required NRC response [i.e..

Environmental Assessment (EA) or EIS).

Cost estimates are summarized in the attached table.

Within the next 3 years, the staff anticipates the review of at least two license renewal

  • applications for commercial power reactors.

Pursuant to Section 51.20(b)

NRC anticipates the preparation of two EIS's or supplements to the existing EIS for the commercial power reactors.

The estimated cost to the Federal Government is about 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> (1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> / review).

Therefore, total estimated cost is

$184,000 (2000 x $92/ hour).

This results in an annual burden of 667 hours0.00772 days <br />0.185 hours <br />0.0011 weeks <br />2.537935e-4 months <br />, with an annual cost of $61,364 (667 hours0.00772 days <br />0.185 hours <br />0.0011 weeks <br />2.537935e-4 months <br /> x $92/ hour).

The staff presently has a rulemaking ongoing to Part 51 which would permit the preparation of environmental assessments in lieu of EISs.

If a significant environmental impact is identi-fied during the staff review, the NRC would proceed to publish an EIS.

If this rulemaking is successful the resource burden to the Government would be reduced for these reviews.

With respect to Section 51.54 (Environmental Reports for Manufacturing Licen: P),

the NRC does not anticipate any submittals during the effective period of this clearance.

There are two design certification reviews currently ongoing.

It is estimated that two additional design certifications will De filed during the next 3 years.

NRC estimates that it will involve approximately 828 hours0.00958 days <br />0.23 hours <br />0.00137 weeks <br />3.15054e-4 months <br /> to complete each of the 4 reviews, which would result in approximately 1,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> annually (828 x 4 = 3,312 hours0.00361 days <br />0.0867 hours <br />5.15873e-4 weeks <br />1.18716e-4 months <br /> for 3 years; approximately 1,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> annually)..The cost is therefore, expected to be $101,200 (1,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> x $92.00/ hour).

  • Encompassed within Part 54.

7 1

e The NRC anticipates the receipt of at least one request for an early site review.

The staff is expected to need approximately 1,650 hours0.00752 days <br />0.181 hours <br />0.00107 weeks <br />2.47325e-4 months <br /> (1 person year) to complete the review, which would result in a cost of approximately $151,800 I!.650 hours0.00752 days <br />0.181 hours <br />0.00107 weeks <br />2.47325e-4 months <br /> x $92.00) or an annualized cost of $50,600 (550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> x $92.00).

The stati anticipates the review of six power reactor decommissioning requests the next 3 years for commercial power reactors.

Pursuant to 51.30, NRC antici-pates the preparation of environmental assessments for these requests.

The total estimated annual cost to the Government i: 2xpected to be $4.280 (240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> /

review x 2 annualized reviews x $92/hr).

There is the potential that two of a total of 6 of the decommissioning reviews could identify plant-specific signifi-cant issues and require the staf f to prepare an environmental impact statement.

If this occurs, the expected resource cost to the Government for these reviews would be substantially higher.

For non power reactor reviews covered by Section 51.30, the staff anticipates, within the next 3 years, the review of two non power reactor renewals, one research reactor power upgrade, and four decommissioning requests (a total of 7 reviews).

Estimated cost to the Federal Government is based on the staff hours of about 92 (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> / review x 2.3 annualized reviews).

Therefore, annualized cost to the Government is estimated to be $8,464 (92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br /> x $92/ hour).

Materials licenses vary in type, and cost of the Government review varies accordingly.

The materials licensing actions which require EISs are identified in 51.20(b)(7)-13.

Other actions, as identified in Section 51.21, may or may not require preparation of an environmental impact statement.

The estimated annual cost of the Government for information collection and processing for materials license activities under Section 51.20 and 51.21 is approximately

$1,103.724 (666.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> / application < 18 a;;plications annually x $92/ hour).

13.

Estimate of Industry Burden and Cost a.

Reporting Burden and Cost No new applications for permits to construct or licenses to operate nuclear power plants are projected over the next three years.

Consistent with the requirements of Section 51.53, each applicant for license renewal will need to supplement their existing environmental report.

The staff estimates that the burden on the licensees may be on the order of 4000 hours0.0463 days <br />1.111 hours <br />0.00661 weeks <br />0.00152 months <br /> per application.

The total estimated burden to the industry for the two expected renewal applications is $736,000 (8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> x $92/hr).

This results in an annual burden of 2,667 hours0.00772 days <br />0.185 hours <br />0.0011 weeks <br />2.537935e-4 months <br />, and an annual cost of $245,364 (2,667 hours0.00772 days <br />0.185 hours <br />0.0011 weeks <br />2.537935e-4 months <br /> x $92).

The NRC does not anticipate a request for a manufacturing license during the duration of this clearance.

Therefore, there is no burden projection for Section 51.54.

Two design certification requests are expected to be filed, which will require an Environmental Report as provided for in Section 51.50.

Each of them is expected to require approximately 1,650 hours0.00752 days <br />0.181 hours <br />0.00107 weeks <br />2.47325e-4 months <br /> of effort by each applicant to prepare and submit the information to the NRC.

The total burden is then expected to be 3,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />.

Thus, the resulting annual cost is expected to be

$101,200 (1,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> x $92.00).

l 8

l The NRC expects industry to submit at least one request for an early site review, which would also involve environmental information required by Section 51.50.

It is estimated that approximately 3,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of effort will be expended by industry to prepare and submit this information.

The total cost realized would be $303,600 (3,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> x $92.00).

Annualized cost is $101,200 (1,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> x $92.00).

In anticipation of power reactor decommissioning requests, licensees will need to provide an evaluation of the environmental impacts.

The staff estimates that the burden on the licensees may be on the order of 480 hours0.00556 days <br />0.133 hours <br />7.936508e-4 weeks <br />1.8264e-4 months <br /> per request.

The annual estimated burden to industry for 2 reviews (6 anticipated within the next 3 years) for decommissioning is $88,320 (480 hours0.00556 days <br />0.133 hours <br />7.936508e-4 weeks <br />1.8264e-4 months <br /> / review x 2 reviews x

$92/hr).

For the non power reactor reviews to be conducted during the same period, the burden on the licensees may be on the order of approximately 4,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> (7 anticipated reviews for the next 3 years; approximately 700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> each).

There-fore, the estimated annual burden to the industry is $150,236 (700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> / review x 2 1/3 reviews x $92.00/hr).

The estimated total number of annual submittals for materials licensing activities pursuant to Sections 51.60, 51.61, and 51.62 is 18 (approximately 54 for the next 3 years).

The materials licensing activities for which submission of envirunmental;information may be required could span a wide range, including applications for independent spent fuel storage installations, uranium mills, fuel fabrication, remedial action, certain medical and industrial uses of radioisotopes, and commercial radioactive waste disposal by, land buriel.

For materials licensing actions under Section 51.60, 51.61, and SL 62, the number of responses is an estimated average.

For some categories of licer. sees, we expect that we may receive only one environmental report over a period of several years.

For other categories, we expect we may receive several per year.

I Similarly, the hours per-response data represents a broad range of information burdens.

The burden hours may range from as little as 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per submittal for some renewals or amendments, to as much as 15,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per submittal for low-level waste burial applications, for example.

Hence, the numbers do not necessarily represent the burden for a typical or any particular licensee, and the use of the numbers for that purpose is likely to be misleading.

However, for the purpose of updating this statement, an average of 1,469 hours0.00543 days <br />0.13 hours <br />7.75463e-4 weeks <br />1.784545e-4 months <br /> has been used for each of the 18 applications anticipateo annually.

Therefore, 26,442 hours0.00512 days <br />0.123 hours <br />7.308201e-4 weeks <br />1.68181e-4 months <br /> (1,469 hours0.00543 days <br />0.13 hours <br />7.75463e-4 weeks <br />1.784545e-4 months <br /> / action x 18 action requests) are anticipated for annual burden involving the materials area.

For the materials area, the estimated annual cost is therefore expected to be

$2.432,664 (1,469 hours0.00543 days <br />0.13 hours <br />7.75463e-4 weeks <br />1.784545e-4 months <br /> / application x 18 applications x $92.00/ hour).

The NRC does not project information collection within the purview of 10 CFR 51.68 because we are not aware of any proposed petitions for rulemaking which could be submitted to the NRC in the next 3 years.

Industry burden is summarized in the attached table.

i b.

Recordkeeping Burden Recordkeeping requirements are not specified in 10 CFR 51,

1 14.

Reasons for Change in Burden Tne increase in the total burden in the materials area is because of an increase it, the number of applications anticipated for low-level waste burial and uranium recovery activities.

The average burden per respondent is lower, however, because of an increase in the estimated number of other lower-burden activities.

The increase in the power reactor area is anticipated because of applications for two anticipated requests for license renewal, decommissioning requests, design certification, and early site reviews.

The burden for non power reactors decreased because there is no longer a requirement to complete environmental reviews for high energy uranium / low energy uranium conversions.

Moreover, additional submittals for research reactor power upgrades are not anticipated.

15.

Publication for Statistical Use NRC does not publish information submitted in accordance with 10 CFR Part 51 for statistical use.

B.

COLLECTIONS OF INFORMATION EMPLOYING STATISTICAL METHODS Information collection provisions of Part 51 do not require the use of statistical methods.

Attached:

Table l

10 L

A Table SUPPORTING STATEMENT 10 CFR PART 51 Summary of burden Summary of cost Estimated Burden Average annual Estimated Estimated per re-annual burden annual annual Info Reg spondent no. of (hrs) to cost to cost to Section Description (hrs) responses industry Industry Fed. Gov.

I 51.16(b)

Request

  • to withold proprietary informa-tion from disclosure 0

0 0

0 0

51.20, 51.21 NRC preparation of and 51.30 statements and assess-ments (Federal burden 6"

is estimated under each appropriate section) 51.41 Establishes NRC's The burden and cost associated with these general requirements general authority to are tabulated below by sections in which specific information require environmental is required for the various applications for permits, licenses information from and petitions. No numerical values are entered here to avoid applicants double-counting.

51.45 Establishes general (See burden estimates for 51.50, 51.53 and 51.60).

requirements of Appli-cant's Environmental Reports (ER) 51.50, 51.51 Specific requirements and 51.52 for ER-Construction Permit Stage Design Certification **

550 2

1,100

$101,200

$101,200 Early Site Review **

1,100 1

1,100

$101,200

$50,600

  • None is anticipated.
    • Encompassed within Part 52 I

s

. Table SUPPORTING STATENENT-10 CFR PART 51-Summary of burden Summary of cost Burden-Avera p Estimated Estimated Estimated per re-annual snnual annual annual Info Req.

spondent no. of burden cost to cost to Section Description (hrs) responses (hrs)

Industry Fed. Gov.

51.53 Specific requirements for supplement to Applicant's ER-Operating License Stage.

  • New OL Applications 0

0 0

0 0

$245,364

$61,364 4

  • . OLs Under Review 0

0 0

0 0

  • Power Reactor Decom-nissioning Requests

-480 2

%0

$88,320

$4.280 g

N

  • ' Non-Power Reactor 700 2 1/3 1,633

$150,236

$8,464 51.54 Specific requirements 0-0 0

0 0

for Applicant's ER for Manufacturing License 51.55 (States' the number of copies required) 51.60, 51.61 Specific requirements 1,469 18 26,442

$2.432,664

$1,103,724 and 51.62 for Applicant 's ER-Materials Lic.

51.66(a) and (b) (States the number of copies to be filed) 51.68 Specific requirements 0

0 0

0 0

for petitioner's ER-Rulemaking.

51.69 (States.the number of copies required)

Totals:

6,077 26 33,902

$3,129,984

$1,327,632

  • A total of.2 applications are anticipated during the 3 year period this clearance is in place, during which time a. total.of 8,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> are expected to be expended by industry.

. ~

.. ~.

.