I GPU Nuolest Corporation N

IMr One Upper Pond Road Parsippany. New Jersey 07054 201 316-7000 TELEX 136-482 -

Writers Direct Dial Numbe l

N0vember b. 1990 C000-90-1093 C311-90-2136 C310-90-244 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C..

20555 Gentlement

Subject:

Three Mile Island Nuclear Station, Unit No. 1 (TMI-1),

Docket No. 50 289 operating License No'. DPR-50 Long Range Plannit.g Program (LRPP)

Update of Integrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, CPUN hereby submits the required semi-annual update of projects listed in each of the categories A, B, and C of the LRPP integrated schedule. The two attachments to this letter provide 1) the ABC project lieting; and, 2) a summary of changes since our last update (CPUN Letter No. C311-90-2055 dated May 4, 1990).

Thens attachments-contain details as follows:

1.

Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*).to identify new projects, and by s double arterisk (**) to identify changes in Budget Authorization (B/A). number assignments. Completed projects have been removed from the schedule listing... Remaining projecte are ongoing or are scheduled consistent with cyc1c./ year commitments. Any changes in schedule are reflected on Attachments A and B.

2.

Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed-in scope, or otherwise have had schedule changes with explanations as appropriate. The listing also contains Category C project completions. Changes to the Category C scope or schedule do not impact-Categories A'or B schedules.

9011130218 901105 PDR ADOCK 05000289 R

PDC

,,,, W g

GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation L

C311-90-2136

  • U. 5. Cuc10;r Regu1Ctery Commicairn Page 2 No additions to the list of Category A projecto have been made by this submittal; however, ten (10) additions have been made to the list of Category B projects.

In addition, Attachment B describes one (1) change to the list of Category B projects affecting se'-dule, and five (5) project identification changes in Category B.

Pursuant the LRPP for THI-1, it will be assumed that you are in agreement with the abe:s category B changes if you do not respond to this submittal within 15 days of receipt.

Sincerely, R. L. Long Vice President and Director of corporate Services RLL/GHG/ pip cca R. Hernan (NRC)

J. Stolz (NRC)

T. Martin (NRC)

F. Young (NRC Resident Inspector TMI-1)

P C310244 i

a S

0 il 4

e 1

ATTACHMENT A THI-1 PROJECT LISTING INTEGRATED SCHEDULE SEMI-ANNUAL UPDATE (NOVEMBER 4, 1990) r i

e

TCI-1 PROJECT LICTINO LEGEND

^

~.

MRC INTEGRATED S C M E D t) L E NEW PROJECTS BA NUMBER CHANGE CA1EGORY

  • A*

PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 310CT90

'OSS SA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS I.

4I2462 ANTICIPATE TRANSIENT w/O SCRAWfATWSiRULE 09R NOR CR RELR CS TB WODIFICATIONS TD FULFILL REQUIREMENTS OF 10 CFR 50.62. LAI 88-9260 2 412567 STATION BLACKOUT 09R NOR ENGINEER AND INSTALL REcosasENDED PLANT 0000S IN ACCORDANCE WITN 10CFR50.63. LAI 89-9083

-4.-

l c

o..

TOI-I PROJECT LISTING i_,

l LEGEND l

MRC INTEeRATED SCNEDULE NEW PROJECTS l

BA NUMPLA CHANGE CATEGORY

'8*

PROJECTS STATUS AS Or 310CT90 SORT BY CATEGORY / CYCLE /Br.

- =- --- - -...---------= - - _--_==-- --..-- -----

---=- - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -. - - - - - - -. = = = = - - - - - - - - - - - - - - - - - -

083 BA DESCRIPTION CYCLEI CLASSIFICATION NURSER YEARS

= - - - - - - - -

-- --.- _=-.

-_.-=--

3 412551 INSTRUMENT AIR UPGRADES 08 Isu INCREASE CAPACITY OF INSTRUMENT AIR SYSTEttS. (SPIP REC.)

REF. C311-88-2092 4 123275 OTSG TUBE PLUGGING 09R NRR 98 l

PLUG OTSG TUBES AS NECESSARY.

5 126203 OUTAGE 9R RV ISI 09R Msen i

R8 PERFORM 10 YEAR RX VESSEL INSERVICE INSPECTIONS TO COMPLY WITN IOCFR50.5C AND T.S.4.2 6-126217 OTSG EDOY' CURRENT TESTING' 09R MOR 98

' ECT Or SAtIPLE INSPECTION GROUPS INSPECT 3% PER OTSG PER TECM SPECS PLUG EXAWS.ECT AFTER SLEEVING:-

t

~7 126219 TRII INSERVICE INSPECTION (OUTAGE 90) 09R NRR ALL

- ASME SECT XI INSPECTIONS: AUGGENTED ISI TO CORIPLY WITN 10 CFR 50.55.

8 ~412AFD Rt0G 22/23 POWER FEED UPGRADE 09R NOR -

- PROVIDE SEPARATE IE POWER CIRCUITS FROte VITAL BUSES VSO 5 VBA TO RAIG 22 8 23 i

-9 412556 TWI-1 CONTROL ROOGI ALARes ENHANCEtIENTS 090 ISal

.CR RELR ADD NEW ALARefS. CORISIME AND i

ELIGIINATE ALADess: RECONFIGURE OVER>EAD PAPELS.

10- 412589

- RCS SMUTOOWN LEVEL IIONITORING 09R-teR r-INSTALL LEVEL TRANSGIITTER Age PROVIDE CONTROL ROOM WITH INDICATION.

(REF GL 88-17,LAI 89-9041)

,<-~.y.

<y

,-~<3 fy

.m.c ry g-e-

a e n-3

-w e.

re-m,c

',,. ~ -

.v-*,

a.-

.----s- - --..-

TWI.1 PD0 JECT LI9 TIN 8 LEGEND MRC INTEGRATED SCHEDULE NEW PROJECTS SA NUMBER CHANGE CATEGORY

'B' PROJECTS STATUS AS OF 310CT90 SORT BY CATEGORY / CYCLE /BA

-- ---=-- ----.......- ---- ---.........= -_ ------.....----- _ - - -._

CYCLE /

CLASSIFICATION OSS' BA DESCRIPTION YEARS NUMBER 11 123ZYX REACTOR BLDG TENDON SURVEILLANCE PROG 10 NOR PROVIDES FOR VENDOR SERVICES AND PLANT SUPPORT FOR NEXT TENDON SURVEILLANCE 12 123287 MAIN STEAM SYSTEW TEST - IOR 100 NRR R9 PERFORM HYDROSTATIC TEST OF OTSG. MS AND FW PIPING. REGUIRED BY 10 CFR 50.55 10R NRR 13 123289 ILRT - 10R RB INTEGRATED LEAK RATE TEST 0F CONTAINMENT. 1993.

14 123290 OTSG TUBE PLUGGING - 109 IOR NOR R8 PLUG OTSG TUBES AS NECESSARY.

~

IOR NRR' 15 12692E.

OTSG EDDY CURRENT TESTING RS ECT OF SAMPLE INSPECTION GROUP 3E PER OTSG TECH SPEC INSPECTION:

PLUG INSPECTIONS 10R NRR

'1G ~12692H

    • TWI INSERVICE INSPECTION ALL ASME SECT XI INSPECTIDAS: AUGMENTED ISI-

-TO COMPLY WITH 10 CFR 50.55.

IIR NRR OTSG TUSE PLUGGING 17 123811 RB PLUG OTSG TUBES AS NECESSARY.

IIR NRR-18 126K11-

  • TMI INSERVICE INSPECTION

'ALL

' ASIE SECTION XI INSPECTIONSs AUGRENTED ISI TO COMPLY WITH 10CFR50.55

9 1

i TOI-I POOJECT LISTINS i

LEGEND NRC INTE9 RATED SCNEDULE

{

NEW PROJECTS BA NUMBER CNANGE CATEGORY

  • B' PROJECTS j

SORT SY CATEGORY / CYCLE /BA STATUS AS OF 310CT90

[

OSS BA DESCRIPTION CYCLE #

CLASSIFICATION NUMBER YEARS l

=_

19 128097 SOUG USERS GROUP PROGRAM 88-93 NRR 4

i SEISMIC OUALIFICATION UTILITY GROUP PARTICIPATION 23 126209 ISI UPDATE 89-91 NRR upOATA ISI PROGRAM IN ACCORDANCE WITN 4

ASE SSPV CODE KOUIREENTS REQUIRED BY 10CF#50.55, LAI 88-9279 I

21 128108 TF SEISMIC OUALIFICATION OF EQUIP 89-93 NOR SCOPE WALKDOMNS AND EVALUATIONS FOR j

SOUG PROGRAM AS REQUIRED BY.

NRC et 87-02 s LAI 87-9084.

I 22 412596

    • TMI-I INDIVIDUAL PLANT EVALUATION 89-93 NOR I

5 INDUSTRY DEGRADED CORE ACTIVITIES 5 PLANT SPECIFIC NRC SUBMITTAL.

(REF LAI 89-9201) 23 412523

, REPLICATE SIMULATOR CERTIFICATION UPGRO 89/90 MRR.

UPGRADE SIMULATOR CONSISTENT WITN l

4 CONTROL ROOM MODIFICATIONS.

24 419213 PLANT

  • REFERENCED SIMULATOR CERTIFICATION 90 MRR s

! ~

UPGRADE SIMULATOR CONSISTENT WITN

[

CONTROL ROOM MODIFICATIONS.

L 1

MOV PROGRAM 90-94 NOR

'25 128ACR DEVELOP A MOV PROGRAM TO MEET THE RECOM-MENOATIONS OF NRC GEN LETTER 89-10 FOR SAFETY RELATED MOV*S IN SFTY REL SYSTEMS 23 419910 SIMULATOR MODIFICATIONS - TMI (1991) 91 NOR UPGRADE SIaRLATOR CONSISTENT WITN i

i I

CONTROL. ROOM MODIFICATIONS.

i "l

1

(

. i TQI.1 P20 JECT LI97INO

)

- LEGEND MRC INTEGRATED SCHEDULE BA NUMBER CHANGE

[

NEW PROJECTS

=

1 I

CATEGORY

  • B' PROJECTS STATUS AS OF 310CT90

. SORT SY CATEGORY / CYCLE /BA

---..................................._-=--

................=---

-- =_...... _.....

...------ =

OSS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS t

27 41992K SIMULATOR MODIFICATIONS - TWI (1992) 92 NRR I

UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOM MODIFICATIONS.

SIMULATOR NODIFICATIONS - TNI (1993) 95 MRR 28 41993P UPGRADE SIMULATOR CONSISTENT WITN

)

CONTROL ROON MODITICATIONS.

i 1

29 41994M SIMILATOR MODIFICATIONS - 751 (1994) 94 NRR i

k UPORADE SIMULATOR CCMSISTENT WITN CONTROL R005 WODIFICATIONS.

l l

i f

r i

f i.

i i

+

l

)

-.g

..,.w...,.

,wy,.,

-r

, -. ~..

,,-.*,.m

.,.._._,%v

.r

,.,. < - -,_. _,....,,. -. ~...-

.-... m.

i TOI_1 #2OJECT LIGTINO LEGEND NRC INTEGRATED

$CNEDULE MEN PROJECTS

===-

- - =.__

BA NUMBER CHANGE 1

CATEGORY

  • C' PROJECTS STATUS AS OF 310CTpo SORT BY CATEGORY / CYCLE /BA i

... _ _ _ _ _ _ _. _ - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ = = _ - - - - - - - - - - -

=. -___...____________

OSS BA DESCRIPTION CYCLE /

CLASSIFICATION NUISER YEARS i

33 128146 TMI 1 NATURAL DRAFT CT*S INSPECT & REP 08 ERC l

INSPECT & EVALUATE POSSIBLE LOCALIZED CONCRETE DEGREDATION AND APPROXIMATE i

SCOPE OF REPAIRS, IF WARRANTED.

31 412541 ADDITIONAL MAINTENANCE PLATFORMS 08 GWC TB IB INSTALL MAINTENANCE PLATFORMS IN THE INTERMEDIATE AND TURBINE SUILDING" l

1 32 412569 MODIFICATION TO ENNANCE DC_V2/65 CONTROL OS ISM CR PROVIDE OPERATING CONTROLS FOR DC-V-2A/8 AND DC_V_6!A/S AND FLOW INDICATION IN TE MAIN CONTROL ROOM 33 412580

. SPENT FUEL MANDLING BRIDGE UPGRADE 08 REL FNB SPENT BRIDGE-REPAIR / REPLACE CONTROL i

ROD MAST. REPLACE DILLON LOAD CELLS.

INSTALL PROGRAMMABLE GEARED SWITCH 34 412588 TURSINE LUBE OIL STORAGE TANK 08 E

REPLACE TLMSIE LtmE CIL TANK & PIPE W/

A NEW ABOVE GROUND STEEL TANK ADJACENT 4

TO THE EAST TS WALL PER 40CFR280.

35 418753 REPLACE CW-Y_IA-F WITN U2 VLVS-

'08 MRC REMOVE UNIT 2 VLVS.PURCNASE EXPANSION JOINTS. REMOVE UNIT 1 VLVS AND REPLACE WITN UNIT 2 VLYS REWIRE VLVS 1

36 412AEA ADDITIONAL MULTIPLEXERS 09 IDE j

TB AUX PROCURE AND INSTALL (2) MULTIPLEX CASIN_

ETS AND RACKS IN TNE T8 AND AUX BLDG OR CONTROL BLDG Ate PROVIDE POWER SLN9 LIES 37 412076 POISON FUEL RACKS-POOL A 09 NRR l

FNB RERACK FLEL RACKS IN POOL A TO

-PROVIDE EDG OF LICENSED LIFE

,l STORAGE CAPACITY i

i

, ~ -

m~

- ~

= -.

m.

.x

t TOI-1 POOJEC7 LI9TINO


.=-

LEGEND NRC INTEGRATED SCNEDULE NEW PROJECTS

~

BA NUMBER CHANGE CATEGORY

  • C' PROJECTS STATUS AS OF 310CT90 SORT BY CATEGORY / CYCLE /BA

. - - ------==.-

CTCLEt CLASSIFICATION OSS BA DESCRIPTION YEARS NURSER 38 412577 ADO'L TURS. SLDG. 5 INT. SLDG. PLATFORe8S 09 ISM TB IB DESIGN, PROCURE AND INSTALL PERMANENT MAINTENANCE PLATFORe87,IN 1NE TURBINE BLG INTEntEDTATE BLDG AND SWST TUNNEL 09 NRR 39 418766 TMI-1 LIGHTING ENNANCEtrENT It0 PROVE THE SECURITY LIGHTING AROUND THE TafI-I alAIN PLANT AREA AND INSTALL LIGHT-ING e THE CNENICAL CLEANING PITS.

09R ALL 4@ 123FFF OTHER OUTAGE RELATED ACTIVITIES ALL OUTAGE RELATED ACTIVITIES SUCN.AS INSPECTIONS. REPAIRS. SURVEILLANCES.

MINOR aIODIFICATIONS 9800 SWPORT. ETC.

090 aIRC

~ 41 123278 90 REACTOR REFUELING RS 76 NEN FUEL ASSERIBLIES. FULL CORE.

OFFLOAD.

62 123299 RK BUILDING PRESERVATION 09R BIRC R8 PRESERVATION OF THE REACTOR BUILDING 43 1 123309 REPL CROtf FLANGE GASKETS &'90RON REM-90 09R RIRC INSPECT FOR 90RON AND REPLACE LEAKING CROGB FLANGE GASKETS (18-203.

REMOVE SORON DEPOSITS FROtt NEAD.

AS 123312

  • MAIN CONDENSER INTERIOR COATING REPAIR 090 adRC 78 DETAILED INSPECTION AND REPAIR OF WAIM CONDENSER COATING P9R NRR 45 126218
    • STEAN EROSION INSPECTION ALL M N NTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TMI SYSTEIBS.

t.

TOI-3 POOJECT LISTING

. LEGEND NRC INTEGRATED SCNEDULE NEW PROJECTS SA NUMBER CNANGE CATEG3RY

  • C' PROJECTS STATUS AS Or.310CT90 SORT SY CATEGORY / CYCLE /BA t

OSS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

[

4 l

46 128128 OTSG CHEM CLEANING SYSTEu 09R MRC

  1. 8 CNENICAL CLEANING OF SOTH OTSG'S USING EPRI/SGOG PROCESS

~

47 412075 REPLACE CONTROL RODS 099 IDE i

i

  1. 8 l

REPLACE 8 CONTROL EOOS.

3 C8 412553 REPLACE-SAILEY TRANS0 BITTERS - 90 09R WRC RELR'R8 REPLACE 10 BAILEY SY TRANSafIT. INSTAL j

NEW POWER Supply RIODULES, WIRING i

CHANGES IN ICS/NNI i

49' 412578 RCP S MS LINE MANGAR PLATFORMS 09R Isas R8 DESIGN, PROCURE S INSTALL PERaIANANT~

PLATFOR4fS IN R8 TO SERVICE RCP-1A/D LONER WOTOR E COUOLhG S Its LINE MANGERS 50 412590 SIRO T/C CASLE REPLACEGIENT 09R NR82 98 i

CNAM9E CABLING FOR 16 EO INCORE DETECTORS. MODIFY PEMETRATION 51 312597 OTSG TUBE SLEEVING 09R REL G8 SLEEVE APOROKIe8ATELY 125 OTSG TUBES PER OTSG IN THE LANE WEDGE AREA 1

52 412595 UPGRADE SOUPCE RANGE NUCLEAR INSTR (MI)-

09R appC CB I

REPLACE THE INDICATION, ALARGB, AND COM-I TROL FUNCTIONS OF NI-1,2 WITH NI-11,32.

EXISTING NI-1,2 SACKUP NI-II,39 TOR CYO9 I

.55 418705 INCORE DETECTOR REPLACE M 09R NRR

)

R8-

i REPLACE S2 INCORE DETECTORS.

j l

l

~

h

~

.l t

T C2 I - - I PROJECT LISTINO

. ~

~

' LEGEND 2

NRC INTEGRATED SCNEDULE NEW PROJECTS BA NUMBER CHANGE 4

CATEGORY *C*

PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 310CT90

'- OBS DESCRIPTION CYCLE /

CLASSIFICATION

(

NUWER YEARS

.j

-- _________-=-

i 54 123DDD OTHER OUTAGE RELATED ACTIVITIES 10R ALL F

r "ALL

. OUTAGE RELATED ACTIVITIES SUCH AS 1

-INSPECTIONS,-REPAIRS, SURVEILLANCES, MINOR MODIFICATIONS-MOD SUPPORT, ETC.

55 123294 RX REFUELING - ICR 10R INIC -

RS:

68 NEM FUEL ASSEMBLIES, LOAD FOR

-585 EFPD.

l 56 123299

. RX BLDG PRESERVATION PROGRAM 10R-GNIC PRESERVATION IN THE REACTOR BUILDING i

~

~

-10R -

aIRC 57 123309,

REPL CROM FLANGE GASKETS / BORON REM 10R-INSPECT FOR BORON AND REPLACE REMAINING 7

a CROM FLANGE GASKETS (35-37 EST).

RE_

MOVE BORON DEPOSITS FROM HEAD AS REQ *D.

58 123312-MAIN CONDENSER ~ INTERIOR' COATING REPAIR

-10R-IK.C -

2 TB

~ DETAILED INSPECTION ~AND REPAIR OF RSAIN

~-

l CONDENSER COATING 1

a

~ ~

10R NRR

. STEAM EROSION INSPECTION-59 42692F-ALL~

'AUGGIENTED INSPECTIONS TO DETECT

-- EROSION / DEGRADATION OF TMI SYSTEMS.'

60 412AEG FUEL UT~EQUIPtIENT FOR REACTOR BLDG

.10R REL DEVELOP,-DESIGN AND PROCURE UT TESTING EQUIPtIENT TO INSPECT FUEL ASSYS FOR DEF-d

- ECTIVE FLEL RODS IN TFE REACTOR BUILDING '

' FOXBORO TRANS$1ITTER REPLACERIENT.

10R IIRC

~ 61 412AEQ' RS

- REPLACE 19 FOXBORO PRESSURE 8 DIFF PRESS' 6

t TRANSIBITTERSs 3 ARE' ASSOC WITH ES AND-10 WITH OTSG LEVEL INDIC AND CONTROL 4

-,.a..,

.. - =.

muNA--+-.~.

e n r~ -

-we

.~

~--m~

-~ r !w +-

c v-e'r

~

--m:~

w +, r n, n-

-L

[g s

v TCI-1 PROJECT LISTINO j

-m-------_--

LEGEND NRC INTEGRATED SCHEDULE NEM PROJECTS

---= =--- -

BA NUMBER CHANGE CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 310CT90


g

- -------_-----------------_-------- y NUMBER YEARS

---_-=-

.62 412AEU DIGITAL TURBINE CONTROL SYSTEM (DTCS) 10R REL REPLACE ELECTRONIC PORTION OF WAIN TURBINE EHC MITH DIGITAL CONTROL S) STEM.

63 412AFC

  • NSPS LOGIC IMPROVEMENTS 10R REL

-MODIFY LOGIC WITHIN HSPS~TO ELEMINATE SINGLE FAILURES BY ADDING DIODES.

7 RSION OF ALARM TO 2/4 LOGIC.

64 412AFF

  • CORE MONITORING SYSTEM UPGRADE 10R ISM DESIGN AND INSTALL:A CORE MONITORING SYS(CMS) TO REPLACE THE EXISTING NUCLEAR 4

APPLIC SOFTWARE SYS.

65 412595 TMI-I AUXILLIARY TRANSFORMER REPLACEMENT

-109 NOR i

REMOVE EXISTING (2) AUX TRANSFORMERS AND INSTALL (2) NEW' AUX TRANSFORMERS W/ ON-LINE TAP CHANGERS-i G6 412597-

  • 'OTSG TUBE SLEEVING IOR' REL-RB.

SLEEVE APPROX."125 TUBES PER OTSG IN THE

... LANE WEDGE REGION.

67 412598 UPGRADE SOURCE RANGE NUCLEAR INSTR (NI)~

109

.MRC CB

-RB REMOVE BF-3 DETECTORS FROM NI-1.2; ADO FISSION CHAMBERS TO NI-1.2sROUTE CABLE;

'. INSTALL 2 NEW IN-CORE SOURCES.

68 123GGG OTHER OUTAGE'RELATED ACTIVITIES 11R ALL JALL-OUTAGE RELATED ACTIVITIES SUCN AS

' INSPECTIONS. REPAIRS, SURVEILLANCES.

MINOR MODIFICATIONS, MOD SUPPORT, ETC.

69 -123299 RX BUILDING PRESERVATION

- 11R '

MRC

'RB PRESERVATION OF THE REACTOR BUILDING

~

~,:

1 4

TCI-1 PQOJECT LISTINO


_ - =------- -

t i

LEGEND NRC INTE_

TED SCNEDULE

-NEW PROJECTS

=-

- - - - - - - - - - - - - = - - -

    • BA NUMBER CHANGE i

CATEGORY *C*

PROJECTS i

SORT BY CATEGORY / CYCLE /BA-STATUS AS OF 310CT90


= =--- _= _=

=------- -------------

--- ----- =_

OSS -

..BA OESCRIPTION CYCLE /

CLASSIFICATION 1

NUMBER YEARS

-==- _. - - - - - - _

===--

70 126J11

"' STEAM EROSION INSPECTION 11R NRR f

ALL AUGMENTED INSPECTIONS TO DETECT EROSION /DEGREDATION OF TMI SYSTEMS 11 418058 SECURITY dCCESS CONTROL COMPUTER ENNANCE 88-90 NRR 3

ALL i

REPLACE CARD READERS: UPGRADE MAIN COMPUTERS NEW PRINTER.

72 419477

-EMERGENCY COMMUNICATIONS.SYS UPGRADE-88-90 NRR REPLACE 31~ DEDICATED TELEPHONE CIRCUITS

'WITH MICROWAVE-TRANSMISSION SYSTEM.

'73' 128122 88W OWNER *S GROUP PROGRAM 1988/89 88-91 NRR GPUN PARTICIPATION IN THE BWOG.

74 128114 EPRI STEAM GENERATOR RELIABILITY PROGRAM 88-94 MRC -

r CD-FUNDING FOR EPRI SGRP TASK 404.

1 i

75 412536

' ADVANCED CONTROL SYSTEM-88-94 ISM DEVELOP A SYSTEM CONFIGURATION.TO REPLACE THE ICS/NNI SYSTEM WITH THE

' ADVANCED CONTROL SYSTEM 76-418749 TURBINE BUILDING' SOUTH ADDITION 89-91 FAC CONSTRUCT A THREE FLOOR' ADDITION ON THE SOUTN.S7DE OF THE TURSINE BUILDING TO-CONSOLIL LTE THE OPERATIONS DEPARTENT i

.I 77 '419686-

  • REPLACEE NT OF UNDERGROUND STC 4GE TANKS 89-91.

ERR l

REMOVAL OF FOUR TANKS AND INSTALLATION

~

OF ONE 10000 GALLON AND ONE 4000 GALLON -

UNDERGROUND STORAGE' TANKS a_,,

- -.. + a=

.w-a,

u-

--.=

n.. - - -

2.-..-,---.

. a --

C d

TOI-1 PROJECT LISTING l

1-

. LEGEND NRC INTEGRATED SCHEDULE j

NEW PROJECTS

-- =--

- -=-

BA NUMBER CHANGE CATEGORY C'

PROJECTS STATUS AS OF 310CT90 SORT BY CATEGORY / CYCLE /BA


. ---------...----....------------....--------...-----..=-

--== - _. _ = _

- ---=--

OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

- -----=____--___----.....

- - = -

_-__ -- _- =-. _ - --

. - - - - - _ -. - - = -

78 -418750 SERVICE SUILDING ADDITION 89-92 FAC CONSTRUCT AN ADDITION TO THE NORTH SIDE l

OF THE SERVICE BUILDING 79 4*.9633 UPGRADE DOMESTIC WATER SYSTEM 89-92 FAC SURVEY EXISTING DOMESTIC WATER SYSTEMS

^

REPLACE / UPGRADE AS NECESSARY..

80 412570-REPLACE GASEOUS CHLORINATION SYSTEM 89 93 ISM-l INSTALL QUATS AND SODIUM HYPOCHLORITE

}

PILOT SYS TO REPLACE CW S RW CHLORINE-SYS RESPECTIVELY. SU*SE0tKNT DERM INSTAL 81 419689 ROOF REPLACEMENTS 89 93 FAC REPLACE ROOFS'ON BLOG 36. WAREHOUSE' 1.

WAREHOUSE 3, AND DEWEY HOUSE.

1 82 123262 RELIABILITY CENTERED MAINTENANCE PROG l L89-94 MRC

-RCM EVALUATION OF'. PLANT SYSTEMS TO-DEFINE MAINT. ACTIVITIES THAT:IMPPOVE RELIABILITY.

83 126207'

. OPERATOR TRAINING' ANALYSIS

-89/92 NRR CONDUCT ANALYSIS OF AD,CRO,SF/SS

. POSITIONS:

REFERENCE:

NUREG 1122 4

8A :128139 POST 1989 - CONFIG.MGMT.

90 ISM SUPPLEMENT BA>128137 CONFIG MANGT UPGRDE' AND IDENTIFY FUNDING FOR DESIGN BASIS-RECONSTITUTION BEYOND 1989 4

85 412581 POST 1989 CONFIG. MANGMNT DESIGN BAS REC 90 IOE'

(

DESIGN BASIS RECONSTITUTION 1990-BEYOND 1989 s

..ms

.--_n

_, _ ~.

+.

.~.

(.

rq

.w,an

.n-e

,n....--wr.-

e A-

,--my g--

A- ~ no.N-

,-, e,.,

-y

~

-..A-w,,

w--

)

N i

^

TOI-I PROJECT LISTINO

= - =. -

-LEGEND NRC INTEGRATED SCNEDULE NEM PROJECTS BA NUMBER CNANGE.

CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 310CT90


_- - - - - - =

.--==-------------------------------=-------


__-- =--------------- --------------.. - - - - - - -.,

- OSS BA-DESCRIPTION CYCLE /

CLASSIFICATION' NUMBER-YEARS l


==-==- --- _=_=----------- -

--- -.==

- =-- _-

I 4

'86 128150

PREPARE AND IMPLEMENT A COMMERCIAL GRADE

.DEICATION PROGRAM INCLUDING DOCUMENT CONTROL AND TRAINING.

87 419665 CONSTRUCT TRAINING LASS 90/92 FAC PROVIDE FOR TRAINING LASS IN EXISTING STRUCTURES.

1 88-123303

  • PLANT PRESERVATION VARIOUS AREAS 91 INIC ALL-SCAFFOLDING,' SURFACE PREPARATION,PAINTIN:
.G/ COATING,"AND CLEANUP 0F VARIOUS AREAS

'AND COMPONENTS.

199'1 CONFIGURATION MANAGEMENT - DBR.

91 IDE 89 '412591.

I

-DESIGN BASIS RECONSTITUTION.1991

'90' 418755 RC-P_ SEAL'CARTRIDGEfTEST EOPT.

-91 REL

^PURCNASE CARTRIDGE. SEAL TESTER i

91 412AEV

'

  • OPTIONS TO REDUCE' IRON TRANSPORT TO OTSG' 91-93' IIRC REVIEW SECONDARY SYSTEM CNEM NISTORY-5~ INDUSTRY PRACTICES AND RECOMMEND STRATEGY FOR CORRECTIVE ACTIONS /

2 92-12691G TMI APPENDIX VIII QUALIFICATION' 91-94 NRR

!TO PAY FOR' UPGRADED TRAINING S TESTING

-l PROGRAMS DEVEL'BY. CONTRACTOR FOR QUAL'S CERT OF UT NDE INSPECTORS PER APP VIII~

93' 128151-

  • CAVITY DOSIMETRY ANALYSIS-91/92 NRR SNIP IRRADIATED CAVITY DOSIMETRY REMOVED IN 9R AND ANALALYZE y

_n._._

J u 1 4_:.;

-,~-.-._,.4

T C3 I - 1 PROJECT LISTINO LEGEND NRC INTEGRATED SCNEDULE NEW PROJECTS


-- -- = = --------.-

BA NUMBER CHANGE a

CATEGORY

  • C' PROJECTS l

SORT SY CATEGORY / CYCLE /BA STATUS AS OF 310CT90

...-----..----__--.=-----------==...===____

--==

OSS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

==- _----


.--==---....--

-94 12691A-EVALUATION OF WAREHOUSE STOCK - TMI 92 NRR PERF EVAL CONCERN WIX SAFETY. CLASS, NO

-l CLASS ON OLD QA TAGS S MAT *S INVENT SCREENS. TO SUPP. COMM GRADE DED.

95 128ACP DRAWING ENNANCEMENTS TWI

-92 MRC s

1.'ENNANCE THE' LEGIBILITY ~OF APPR 500 DWGS.

2.' REDRAW FLOW DIAG._IN CAD FORMAT

3. REDRAW GEN ARRANG IN CAD FORMAT 4

96 128ACS GUIDELINES'FOR ABNORMAL TRANSIENT PROC 92 IDE.

' DEVELOP' PLANT SPEC GUIDE (PSG) FOR TMI-I ATP PROVIDING TECN BASES FOR ATP'S_TO BE USED IN TRAINING, EVAL' PROC CHANGES,ETC.

'1992(TMI-I CONFIG. MANAGMNT - SSFI 92

' ISM

$7 128ACU PERFORM ONE (13TSAFETY SYSTEM FUNCTIONAL INSPECTION'(SSFI). PREP DRAFT DESIGN BASIS DOCUMENT (IF REOUIRED).,

~98 412592 1992 CONFIGURATION MANAGEMENT - DBR 92.

IOE DESIGN BASIS RECONSTITUTION.1992

'BEYOND 1992 99 419710 UNIT 2 ADMIN BLDG 92 FAC l

. ENGINEERING STUDY, VENTILATION AND NVAC MODIFICATIONS L

100 126101 PLANT LIFE ASSURANCE / EXTENSION 92 94

.REL

- SUPPORT OF STUDIES BY GPUN & BWOG FOR FEASIBILITY OF EXTENDING OPERATING LIFE.

"101 128AST B8W OWt:ER'S GROUP PROGRAM - 1992/95 92-94

.MRR

~ PARTICIPATION IN 88W OMNERS' GROUP PROGRAM

., +.,:,.-.._... = s _,.~. u;.

i.

-,-.a

O O

~

T.D I _ 1 PROJECT LISTI.NO LEGEND NRC INTEGRATED SCHEDULE NEM PROJECTS

- - ---

]

BA NUMBER CHANGE i

CATEGORY

  • C' PROJEC1i

-SORT BY CATEGORY / CYCLE /BA STATUS AS OF 310CT90-

_ _ = = = - - = = _ - - -

- --.-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ----- --___==-

_---=.____

=___________

OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

- _ = _ _ _ _ - - - - --- ---

J 102 419669 TMI ROADS UPGRADE 92/93 FAC NORTH BRIDGE PAVING. LIBERTY LANE

~ >

UPGRADE.RESTRIPING. UNIT 2.RX HATCH IMPROVEMENT-

  • ' 1993 TMI-I CONFIG. MANAGMNT - SSFI 93 ISM

. 103-128ACV PERFORM ONE'(1)' SAFETY SYSTEM FUNCTIONAL INSPECTION (SSFI).-PREP DRAFT DESIGN I

BASIS' DOCUMENT (IF.REOUIRED).

134 412552-SOUG MOOS ~

93 NOR j

ALL-MODIFY ANCHORAGES / SUPPORTS, REPLACE PROTECTIVE RELAYS TO COMPLY MITH SEISMIC..

QUALIFICATIONS.'. SCOPE NOT DEFINED.

  • - 1993' CONFIGURATION MANAGEMENT - DBR 93-
IDE

-105 412593 DESIGN BASIS RECONSTITUTION 1993-BEYOND 1993 EVAL OF TMI ALERT!8. NOTIFICATION SYSTEM 94 NRR L106 12693A' EVALUATE SYSTEM SIRENS USING LATEST-DEMOGRAPHIC &" TOPOGRAPHIC-INFO TO INSURE-STILL MEETING FEMA REOMNTS

[

107 ' 12694C_

MAINTENANCE ~ TRAINING-ANALYSIS

~

.94 NRR' DEVELOP.-TASK ANALYSIS'FOR~Isc. ELECTRICAL'-

AND MECHANICAL INPO' ACCREDITED: PROG-i

~

r

- l l

- -+ U e

.r-+,-,h,

+y-r p.

Et try-q

-h y

,,-s h.

m w

+

~, - -..,.

,s

,.w 3's-,e-y

%--.--e-.-w

's.

'-e


,**,p

ATTACHMENT B CHANGES TO TMI-1 NUCLEAR GENERATING STATION INTEGRATED SCHEDULE SEMIANNUAL UPDATE (NOVEMBER 4, 1990)

-j CATEGORY A PROJECTS Additions:

None t

Completions:

126212 Security Scrning/ Fitness for Duty Audits Deletions:

None Schedule Changes None t

'i k

b i

i 1

L I

l i

~ATTACMMENT B-(ctntinutd)

CATEGORY B PROJECTS Additions:

As denoted by

  • next to the project title in Attachment A :

Completions:

126201 Outage General Employee Training 412512 Safety Performance Improvement Program (SPIP)

(

NOTE: SPIP modifications to be implemented under.this budget activity were completed with a decision to i

make no change to the BTU limits..Other SPIP related modifications are listed under their-.

individual BA numbers.

Deletions:

None Schedule Changes:

123287 Main Steam System Test - This test has been moved from Cycle 9R to Cycle 10R.

The, test is required by -10CFR 50.55 and Tech Spec.4.2.1.. Tech Spec 4.2.1 requires testing in accordance with:ASME Saction XI and-requires the plant to' perform this test every 10 years.

The 10 years is divided; into three 40 month periods. Both 9R and 10R are within the a

third 40 month interval, therefore moving the test is still within the' test window.,In addition, a desirable' option is j

to perform the test as the plant is being cooled down at the-outage start, but while the OTSGs can be maintained >100F.

Moving the test to 10R permits using 9R to walkdown and prepare for the test in 10R.

Other Changes Budaet Activity (BA) Number Chances The following BA' numbers have been changed. There is no.

change in scope or schedule associated with these changes.

bas which have had their numbers changed are indicated by a

    • in Attachment A QHE Et,evious BA Number

.New BA' 6

126A09 OTSG Eddy Current Testing

'126217 7

126C09 TMI Inservice Inspection 126219

/

15 126A10 OTSG Eddy Current Testing 12692E

.j l

16 126C10 THI Inservice Inspection 12692H 22 128099 TMI-1 Individual Plant 412596-Evaluation Catecorv Chances The bas for Refueling Activities, BA 123278 and BA"123294 H

have had their category changed to'" Maintain Reliability / Capability"-(MRC). These two items have-been moved to the C list.

s

s'-

THI-1 Intcgrct0d Sch dulo ATTACHMENT B (continued)

CATEGORY C PROJECTS Additions: As denoted by

  • next to the project title in Attachment A.'

Completions:

412271 Plant Performance Monitor Instrumentation 412521_ Upgrade Radwaste Solidification Capability 412543 ?RA Safety Enhancoment Hods 419206 Mockup for Qualification of RV Deletions:.

123282 Cire Water'Sys. Pipe and Waterbox Coating q

129AAB OTSG Tube Sleeving Contingency 418759 Replace RCP' Rotating Assembly 41989G Emergency Preparedness Auto Callout Sys j

i i

on Hold:

126104 Tech Spec Improvements 419708 Turbine Building. Tool Shop BA Number Changes:

- QgE Previous BA Number New BA 45 126B09 Steam Erosion Inspection 126218 59 126B10. Steam Erosion Inspection 12692F 99 419X28 Unit 2 Admin Building 419710 i

1

'l l

i

.i I

f

i