ML20062D339
| ML20062D339 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/22/1982 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20062D336 | List: |
| References | |
| LIC-82-267, NUDOCS 8208060034 | |
| Download: ML20062D339 (1) | |
Text
.
t Omaha Public Power District 1623 MAMNEY a OMANA. NEBRASMA GS102 e TELEPHONE S36 4000 AREA CODE 402 July 22, 1982 LIC82-267 M. W. C. Seidle, Chief Reactor Project Branch 2 U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Reference:
Docket No. 50-285
Dear Mr. Seidle:
Pursuant to 10 CFR 50, Appendix E, Section IV, Paragraph V, thirteer.
(13) copies of changes to the Fort Calhoun Station Emergency Plan Imple-menting Procedures are being provided to the Consnission. Three (3) copies (for control copy numbers 154, 155, and 156) are provided for your office. Ten (10) copies (for control copy numbers 157 through 166) have been provided to the Office of Nuclear Reactor Regulation. Please note that copies numbers 165 and 166 were sent addressee only to Mr.
Rohrer and Mr. Tourigny, respectively. A transmittal sheet is provided for each copy to confirm receipt of the serialized document.
It is requested that these sheets be completed and returned within five (5) days of receipt.
Sincerely, IU)$
W. C. i o;nes Division Manager Production Operations Enclosures i
cc: Mr. Harold R. Denton, Director (10)
U. S. Nuclear Regulatory Connission Office of Nuclear Reactor Regulation Washington, D.C.
20555 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 06 1
I 8208060034 820802 DR ADOCK 05000
-GF-.
.