ML20062D077

From kanterella
Jump to navigation Jump to search
Forwards Revised Portion of QA Program for Design & Const Phase,Revision 1,dtd 810422.Description of Qa/Qc Program to Be Implemented Upon Bechtel Assumption of Ae Responsibilities Will Be Submitted by 811211
ML20062D077
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/24/1981
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML20062D081 List:
References
ST-HL-AE-761, NUDOCS 8208050447
Download: ML20062D077 (3)


Text

., , sy ,.n aa,m

/

NTT The Light Company n-i..o u#mw- m e, u,-,a miummmu November 24, 1981 ST-HL-AE-761 SFN: V-0100 w

Mr. Robert L. Tedesco Assistant Director for Licensing Division of Licensing U. S. Nuclear Regulatory Coc=ission Washington, D.C. 20535

Dear Mr. Tedesco:

South Texas Project Units 1 & 2 Do cke.t Nos. STN 50-498, STN 50-499 Revised Quality Assurance Progran for the Desien and Construction Phase Attached is a revision to the QA Program Description, Revision 1, which was transmitted by Mr. Goldberg's letter dated April 22, 1981. The revisicas describe the procedures that will be used by Bechtel Power Corporation if HL&P requests that it perfora limited design work during the transition period while Brown & Rcot Inc. centinues to function as Architect-Engineer on the Project. As described in the revision, during e.he transition Bechtel will perform its activities in accordance with Bechtel Engineering Depart ent Procedures which implement the approved Bechtel Topical Report BQTOP-1. HL&P QA will parfora audits of the 3echtel activities in accordance with the HL&P Project Quality Assurance Plan.

We are planning to submit by December 11, 1981, a description of the QA/QC program that will be inplemented upcn Bechtel's assumption of project Architect-Engineer respensibilities.

Ve ry t r"ly yours ,

[l/ q e/ ,

Exenj.

,pr, s',f,r . f, u ou-p .~ 3

ive y te President LR1/ bit Attachent 8208050447gOOO O PDR ADOCK 0 pga A

. i ih>uston Lighting & Power Cornpany cc: G. W. Oprea November 24, 1981 1

l J. H. Coldberg ST-HL-AE-761 '

J. G. Dewease SFN: V-0530 D. G. Barker Page 2 C. C. Robertson H. Pyle, III P.. A. Frazar D. R. Beeth J. W. Willia =s I'J. W. Briskin J. E. Geiger D. E. Sells (NRC)

H. S. Phillips (NRC)

J. O. Read (Read-Poland, Inc.)

M. D. Schwara (Baker & Botts)

R. Gordon Gooch (Baker & Botts)

J. R. New=an (Lowenstein, Newman, Reis, & Axelrad)

STP RMS .

Director, Office of Inspection & Enforcement Nuclear Regulato ry Co==ission Washington, D. C. 20555 R. L. Range /G. W. Muench Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atocic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C. 20535 R. L. Hancock/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Live r ore, Califo rnia 94550 Brian E. Be rwick, Esquire William S. Jordan , III Assistant Attorney General Harron & Weiss for the State of Texas 1725 I Street, N. W.

P. O. Box 12548 Suite 506 Capitol Sta_ ion Washinton, D. C. 20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antcaio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Revision Date 10-29-31

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

$ the Matter S S

Houston Lighting & Power S Docket Nos. 50-498 Co=pany, et al., S 50-499 S

South Texas Project S Units 1 and 2 S AFFIDAVIT G. W. Oprea, Jr. being duly sworn, hereby deposes and says that he is an Executive Vice President of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regulatory Cocnission the attached revision to the Revised Quality Assurance Program for the Design and Construction Phase of the South Texas Project; that he is familiar with the content thereof; and that the catters set fort

' > rein are true and correct to the best of his knowledge and belief. '/ /

..i

  • /

Q ,4' G( 7. Dp rea , d'r.

Executive Vic President STATE OF TFXAS S S

COUNTY OF HARRIS S Subscribed and sworn to before ce,,a Notary Public in and for Harris County, Texas this it.J

  • day of d e h A/ d , 1981.

/

,A L v h /0( . Q{,[,

0 ,.-

Notary Public in and for the State of Texas [i]

My cocnission expires:

C' h