Forwards IE Inspec Rept 50-341/78-15 on 780913-14 During Which No Items of Noncompliance Were Noted
ML20062C845
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/06/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML20062C848 List:
References
NUDOCS 7811140268
Download: ML20062C845 (2)


See also: IR 05000341/1978015

Text

- l J'Jk

m

.

-

.

.

.

  1. "

%g

UNITED STATES

f.

ft

NUCLEAR REGULATORY COMMISSION

(,.%[j

REGloN ill

,

e

c

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINolS 60137

.y

.....

.. ,

OCT G 1978'

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

,

This refers to the inspection conducted by Mr. K. R. Naidu of this

office on September 13-14, 1978, of activities authorized by NRC

Construction Permit No. CPPR-87 and to the discussion of our find-

ings with you and others of the Fermi 2 project staff at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

(

Practice," Part 2, Title 10, code of Federal Regtilations, a

copy of this letter and the enclosed inspection uport will

be placed in the NRC's Public Documer.c Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

b

-M

-

W

oh

3u

.

.

,

,

.

'OCT G 1978

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

CT cfI/ /%<n7(_

/

R. F. Heishman, Chief

actor Construction and

Engineering Support Branch

Enclosure: IE Inspection

Rpt No. 60-341/78-15

cc w/ encl:

Central Files

roduction Unit NRC 20b

,

,

Local PDR

,

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

,

Eugene B. Thomas, Jr. ,

Attorney

,

-. . _ .

. _ .

-.

_.

.

.

.

-