Forwards IE Inspec Repts 50-518/78-08,50-519/78-08 50-520/78-08 & 50-521/78-08 on 780815-31 During Which No Items of Noncompliance Were Noted
ML20062C767
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 10/04/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hughes A
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20062C769 List:
References
NUDOCS 7811140090
Download: ML20062C767 (2)


See also: IR 05000518/1978008

Text

- . ~ . - - . - , . - _ . . -- . .,

___ _ _ .

  • =

.

,

'

O "g

g >8 "' %, UNITED sT ATEs

'c, NUCLE AR REGULATORY COMMISSION

'

Q ,hr3

3

[? - -

, f 1 ,

i

R E GION 18

730 PE ACHTRE E sf REET. N Vi SulTE 1217

,Q ]

h k h,(8 ATL AN T A GE oHG'A 303O}

t,'.... ~

OCT 0 41978

'L. ' ' ' ' - [)

W'

$;3/

In Re -

efer To: ,,~.

q

-518 M

50-519/78-8

50-120/78-8

50-521/78-8

Tennessee Valley Authority

Attn: Mr. N. B. Hughes

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. J. K. Rausch of this office on

August 15-18, 23-24,. 28-31, 1978, of activities authorized by NRC Construction

Permit Nos. CPPR-150,CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear

Plant A and B facilities, and to the discussion of our findings held with

Mr. W. O. Brown at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report. These items will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

>- Document Room. If this report contains any information that you (or

ycur contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this cffice to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

_

'

7 8 1 1 1 "< r M O

'

O,'

w

,

- -

- - - . -

, , . ,

6

- - --

~. .. - . . _

  • .

,

.

Tennessee Valley Authority -2-

OCT 0 4 B7d

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear

from you in this regard within the specified period, the report

sill be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely, ,

/fC. E. Murphy,

f t= i .m/

Chief

'-

-1i k' Reactor Con'struction and Engineering

Support Branch

'

Enclosure:

Inspection Report Nos.

50-518/78-8

50-519/78-8

50-520/78-8

50-521/78-8

cc w/ encl:

Mr. J. E. Gilleland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. R. T. Hathcote, Project Manager

Hartsville Nuclear Plant

P. O. Box 2000

Hartsville, Tennessee 37074

Mr. J. F. Cox

400 Commerce Street

W9D214

Knoxville, Tennessee 37902

' - --- -

.

.,.. _.