ML20062C653
| ML20062C653 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 07/20/1982 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Borgmann E CINCINNATI GAS & ELECTRIC CO. |
| Shared Package | |
| ML20062C655 | List: |
| References | |
| NUDOCS 8208050320 | |
| Download: ML20062C653 (2) | |
See also: IR 05000358/1982007
Text
_________ ___________ _
.
.
JUL 2 0 882
Docket No. 50-358
Cincinnati Gas and Electric
Company
ATTN:
Mr. Earl A. Borgmann
Senior Vice President
.
Engineering Services and
Electric Production
139 East 4th Street
'
Cincinnati, OH 45201
Gentlemen:
This refers to the meeting held on May 4, 1982, at the Region III office
between Mr. B. R. Sylvia and others of his staff and Mr. A. B. Davis and
others of his staf f to discuss the status of the Quality Confirmation
Program (QCP), the status of the Immediate Action Letter (IAL) items
issued on April 8, 1981, and the licensee's proposed change to the re-
inspection program (Item 3 of the IAL).
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this off. ice
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Reom.
8208050320 920720
PDR ADOCK 05000358
O
SEol'
-
- - ------ ---- -
.
.
Cincinnati Gas and Electric Company
2
July 20,1982
4
We will gladly discuss any questions you h. ave concerning this
inspection.
Sincerely,
Original signed by
A. Bert Davis
A. B. Davis, Depaty
Regional Administrator
.
Enclosure: Anspection Report
,
No. 50-356/82-07(DPRP)
cc w/cnc1:
B. R. Sylvia, Vice President
Nuclear Operations
J. R. Schott, Plant Superintendent
-
DMB/Docuscnt Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Comm.tssion
Citizens Against a Radianctive
,
Environment
' '
Helen W. Evans, State
.o
Robert M. Quillin, Ohio
'r
,
Department of Health
Thomas Applegate
'
Thomas Devine, Associate
<
Director, Institute for
Policy Studies
Dave Martin, Office of
Attorney General
1
\\
\\
,
,
'\\
- RIII
R gJ
RII
RII
RII
RIII
Q
U
Barrett
ibinz
nter
tre er
Spe
rd
a is
7/13/82
4
7 p
l
N)
_.