M Carolina Power & Light Company n
November 3,.1978 FILE: NG 3514(B)
SERIAL: GD-78-2959 Office of Nuclear Reactor Regulation ATTENTION:
Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 3
\\
United States Nuclear Regulatory Commission Washington, D. C.
20555 BRUNSWICK STEAM ELECTRIC PLANT, T NOS. 1 AND 2 DOCKET NOS. 50-325 AND
-324 LICENSE NOS. DPR-71 AND R-62
- I REQUEST FOR LICENSE AMENDMENT - VACUUM R OPERABILITY
Dear Mr. Ippolito:
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company hereby requests a revision,to the Technical Specifications for its Brunswick Steam Electric Plant, Unit Nos. 1 and 2.
This change will modify, on a temporary basis, the operability requirements for the suppression pool - reactor building vacuum breakers. The manual valves in these lines will be closed and the opening of the valves will be governed by administrative controls based upon the parameters indicated on the attached Technical Specification revision.
Manual operation is acceptable for these valves due to the lengthy interval after an initiating event required to produce the vacuum conditions of con-cern, and the manual nature of the system which could create those conditions.
This revision is requested only until such time as a suitable modification can be developed and installed to permit this system to operate in an automatic fashion.
I Pages which incorporate this revision are attached with the changes indicated by a vertical bar in the right hand margin.
i q
l 7811080109
\\
}
wn.
e m m. =.
m.
- n _r :
a y
m
.=mm.s
.: :=
h p
I
)
Mr. T. A. Ippolito.
November 3, 1978
'i In accordance with 10CFR170.12(c), we have determined that this
- j Technical Specification change request constitutes a Class III amendment dealing with a single technical issue and a duplicate, Class I amendment.
Our check for $4,400 is enclosed as payment for these amendment fees.
1
)
Yours very truly, k
j{
E. E. Utley Senior Vice President Power Supply l
CSB/mf Attachments Sworn to and subscribed before me this 3rd day of November, 1978 5
_h'v-W 1.AAAA21,
Notary Public sssesinstro, My Commission Expires:
October 4, 1981
....... 4 M
/
5 [:tt O T A R y j j
s s
~
EIA
\\. lB L tC lsS l
5 3
g.
003RD'o O
- tis g g g g tsl i
7%
l i
Il :
i l
t
++.--
~ _ - -
~ ~ _. _ +.. -
{
c 1
I, CONTAINMENT SYSTEMS h
SUPPRESSION P0OL - REACTOR BUILDING VACUUM BREAKERS 1
1 1
I LIMITING CONDITION FOR OPERATION i
i 3.6.4.2 All suppression pool-Reactor Building vacuum breakers shall be OPERABLE with an opening setpoint of < 0.5 psid with the manual valves closed.
l 4
Ij APPLICABILITY: CONDITIONS 1, 2 and 3.
ACTION:
)
(~)
With indication that two or more of the drywell-suppression pool vacuum a.
breakers are open, the drywell pressure should be monitored at least once per 15 minutes,
- b. With a low drywell pressure alarm and three or more drywell-suppression pool vacuum breakers open, the manual valves in the suppression pool-reactor building vacuum breaker lines should be opened,
- c. The manual valves in the suppression pool-reector building vacuum breaker lines should be opened prior to operation of either tne drywell or sup-pression pool spray systems.
2 SURVEILLANCE REQUIREMENTS f ()
4.6.4.2 Each suppression pool-Reactor Building vacuum breaker shall be demonstrated OPERABLE:
a.
At least once per 92 days by manually verifying that the vacuum breaker is free to open.
b.
At,least once per 18 months by:
1.
Demonstrating that the force required to open each vacuum i
breaker does not exceed 0.5 psid, and i
2.
Visual inspection.
-l 9
BRUNSWICK - UNIT 1 3/4 6-20 I
f i
.,w.,
,-o,
==%
_T%.m^-.
P._-
' ' ~ ~ ~
~
_a 7
g 1
CONTAINMENT SYSTEMS q
SUPPRESSION POOL - REACTOR BUILDING VACUUM BREAKERS l
.i
]
LIMITING CONDITION FOR OPERATION t
i
' l 3.6.4.2 All suppression pool-Reactor Building vacuum breakers shall be l
OPERABLE with an opening setpoint of < 0.5 psid with the manual valves closed. l
)
APPLICABILITY: CONDITIONS 1, 2 and 3.
l ACTION:
1 j
- a. With indication that two or more of the drywell-suppression pool vacuum breakers are open, the drywell pressure should be monitored at least once
(',~
per 15 minutes.
- b. With a low drywell pressure alarm and three or more drywell-suppression pool vacuum breakers open, the manual valves in the suppression pool-reactor building vacuum breaker lines should be opened.
- c. The manual valves in the suppression pool-reactor building vacuun breaker i
j lines should be opened prior to operation of either the drywell or sup-
[
pression pool spray systems.
J
)
SURVEILLANCE REQUIREMENTS f
i 1
i 4.6.4.2 Each suppression pool-Reactor Building vacuum breaker shall be
! ()
demonstrated OPERABLE:
At least once per 92 days by manually verifying that the f
a.
l vacuum breaker is free to open.
b.
At least once per 18 months by:
1.
Demonstrating that the force required to open each vacuum breaker does not exceed 0.5 psid, and 2.
Visual inspection.
i 4j 4
BRUNSWICK - UNIT 2 3/4 6-20
-