Monthly Operating Repts for Sept 1990 for Byron Nuclear Power Station
ML20062C331
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/30/1990
From: Orris K, Pleniewicz R
COMMONWEALTH EDISON CO.
To:
NRC
References
NUDOCS 9010310106
Download: ML20062C331 (14)


Text

_. __ _ _ _ _ _ _ _ _

i CN

,, [' ) CommonwealttiEdison Byron Nucl:ar Station ' )

. C 4450 North Girrnan Church Road Byron, Illinois 61010 4

i I October 10, 1990 LTR DYRON 90-0994 FILE: 2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen Enclosed for your information is the Monthly Performance Report covering Dyron Nuclear Power Station for the period September 1 through September 30, 1990.

Sincerely, l

[

h, N R. Plenlewicz Station Manager Dyron Nuclear Power Station RP/KO/ mew (0625M/0062M) cci A.B. Davis, NRC, Region III eng NRC Resident Inspector Dyron l \ Ill. Dept. of Nuclear Safety M. J. Wallace/K.L. Graesser o

  • Nuclear Licensing Manager PD Nuclear-Fuel Services, PWR Plant Support i

g2 D. R. Eggett, Station Nuclear Engineering INPO Records Center 0,4

, T. Boyce - USNRC-n O

\ Y

- e n. =

lh b-I to 3

1 1

. . i l

4 l

BYRON NUCLEAR POWER STATION j i

l UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT l COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 ,

i NRC DOCKET NO. 050-455 {

LICENSE NO. NPT-37 l LICENSE NO. NPT-66 i

l I

i' l

4 (0625M/0062M/1)

-)

.i i

1. Montuly._Repsrt f atsyron Ult 1T 1 for tht_mqath of Empigghgr 1910_ j A. .... Summ&Iy gl_Qpat& Ling _1gperience for Unit 1_ l The unit began this reporting period in Mode-1 (Power Operation) at l approximately 98% power. The unit operated at power levels of up to 100%
  • for the remainder of the month.

l i

(0625M/0062M/2)

t l

i B. OPERATING DATA REPORT DOCKET NO.: 050-454 Byron One UNIT DATE: 10/10/90 i COMPILED BY K. Orris TELEPHONE: (815)234-5441 x2444 OPERATING STATUS l

1. Reporting Period: September, 1990. Gross Hours: 720 P
2. Currently Authorised Power Level 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

! Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net) -

3. Power Level to Which Restricted (If Any): N/A *
4. Reasons for Restriction (If Any):

THIS MONTH YR TO DATE CUMULATIVE *

5. Report Period Hrs. 720 6,551 44,184
6. Rx Critical Hours 720 4,967.1 35,507.1
7. Rx Reserve Shutdown Hours 0 0 38
8. Hours Generator on Line 720 4,890.1 34,984.1
9. Unit Reserve Shutdown Hours 0 0 0
10. Gross Thermal Energy (MWH) 2,247,559 14,784,300 106,044,740
11. Gross Elec. Energy (MWH) 766,054 5,010,650 35,755,068
12. Het Elec. Energy (MWH) 731,129 4,725,581 33,703,613 '
13. Reactor Service Factor 100 75.8 80.4
14. Reactor Availability Factor 100 75.8 80.5
15. Unit Service Factor 100 74.6 79.2 ,
16. Unit Availability Factor 100 74.6 79.2
17. Unit Capacity Factor (MDC net) 91.8 65.3 69.0
18. Unit Capacity Factor (DER net) 90.7 64.4 68.1
19. Unit Torced Outage Hrs. 0 171.9 1,228.9
20. Unit Forced Outage Rate 0 3.4 3.4
21. Shutdowns Scheduled Over Next 6 Months: None l 22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units 'n Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service..

(0625M/0062M/3)

CdVIRAGE_DAILLURILEMIR_LEVIL DOCEET NO.: 050-454 UNIT: Byron One DATE: 10/10/90 COMPILED BY E. Orris TELEPHONE: (815)234-5441 x2444 MONTH: September, 1990 DAY AVERAGE DAILY POWER LEVEL i (MWe-Net)

1. 932 }{N 16. B19 MW
2. 1046 MW 17. 983 MW *
3. 9.10_MW 18. 1QQl MW
4. 1Q1LMN 19. 990_MW
5. 10_0 0_NW 20. 9S7 MW
6. 1010 MW 21. 1001 MW ,
7. 1QLQ_NW 22. 977 MW _

R. _1016.MW 23. 971 MW

9. 903.}fN 24. 10ER_NW
10. la(Q_NN 25. 979 MW
11. 102LNW 26. 1069 MW
12. 107 6 .__MW 27. 1QE9_NW
13. 1Q33 MW- 28. 1056 MW
14. 1QQLNW 29. _ 10.(LMN
15. 92.7 MW 30. 1004 MW 1

l INSTRUCTIONS On this form list the average daily unit power level-in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily everage power level exceods the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/0062M/4) .

Report Period September, 1990 UNIT SEUTDOWNS/ REDUCTIONS

  • BTRON *

(UNIT 1) **************************

_Eg_,_ Date Tyne Ecurs Reason Method LER Number System Commonent Cause & Corrective Action to Prevent Recurrence NO SHITa W S OR REDUCTIONS FOR UNIT 1 c**************

O Sununary

  • TIPE Reason Method System & Comnonent F-Ferced A-Equip Failure F-A6 min 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

(0625M/0062M/5)-

E _ Uli100E_REEORIlliG_REOL11REMENIS (bHIT 1) for t.he montit_0L ity.ttmher.1990

1. Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACIVAllott C0tm1ILCtt OLEVENT None

2. Licensee generated changes to ODCM. (Y/N)

No I

3. Indications of failed fuel. (Y/N)

No Fuel Reliability Indicatort FRI = 1.6E-4 pCi/cc This value is derived from non-steady operations data and therefore should not be compared to INPO values. The value provided will {

demonstrate the approximate coolant activity level "for information j only".

l l

t i l

(0625M/0062M/6) l  !

E4 LICENSIE EVENT E100RIS__LURIT_.11 The following is a tabular summary of all Licensee Evene Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, September 1 through September 30, 1990. This infossation is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licanant_Ittat_ Report Numht.I Dalt Ilkla of.0ccurrans.t 90-010 08/18/90 1A Aus111ary Feedwater Pump automatic start due to module failure in the anticipated transient without scram system.90-011 08/19/90 High negative flus rate reactor trip due to loss of control rod drive power supplies during lighting strike.

l i

i (0625M/0062M/7)

I

i I

}

II. Monthly _ Report for Byron UNIT 2 for the month of Sant==har 1933 i

.6 A. S.-ary of Oegratina Emnerience for Unit 2 1

September 1 was the start of B2R02 refuel outage. The unit was in the '

refuel outage for the remainder of the month, f

i 1

[

t I

e

+

S L

i c

l' k l f l r I

s J

l.  :?

l  ?

s.  !

t l' 7 P

h

.- i

'g

-i

'(0625M/0062M/8) ,

.i I  ;

i

'L <

L DEERATIRG_ DATA _ REPORT DOCKET NO.: 050-455 UNIT Byron Two DATE: 10/10/90 COMPILED BY K. Orris TELEPHONE: (815)234-5441 x2444 OPERATING STATUS

1. Reporting Period: September, 1990. Gross Hours 720
2. Currently Authorized Power Levels 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net)

3. Power Level to Which Restricted (If Any): N/A
4. Reasons for Restriction (If Any):

THIS MONTH YR TO DATE CUMULATIVE *

5. Report Period Hrs. 720 6,551 27,288
6. Rx Critical Hours 2.5 5,684.8 23,749.8
7. Rx Reserve Shutdown Hours 0 0 0
8. Hours Generator on Line 1.1 5,670.6 23,355.6
9. Unit Reserve Shutdown Hours 0 0 0
10. Gross Thermal Energy (MWH) 1030 16,149,731 61,717,340
11. Gross Elec. Energy (MWH) 126 5,517,328 20,862,128
12. Het Elec. Energy (MWH) -9,435 5,202,902 19,593,038
13. Reactor Service Factor 0.34 86.7 87.0 14 Reactor Availability Factor 0.34 86.7 87.0
15. Unit Service Factor 0.15 86.6 85.6
16. Unit Availability Factor 0.15 86.6 85.6
17. Unit Copacity Factor (MDC net) 0 71.8 64.9
18. Unit Capacity Factor (DER net) 0 70.9 64.1
19. Unit Forced Outage Hrs. 0 26 845
20. Unit Forced Outage Rate 0 0.4 3.5
21. Shutdowns Geheduled Over Next 6 Months: None
22. If Shutdown at End of Report Period, Estimated Date of Startup: 10/30/90
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(0625M/0062M/9)

C.. . AYIRAGE_pMLLUtiLT POWEPJEy;L DOCKET NO. 050-455 UNIT Byron Two DATE: 10/10/90 COMPILED BY: K. Orris TELEPHONE: (815)234-5441 x2444 MONTH: September, 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) I

1. -1Q_.NW 16. -13 MW
2. -14 MW 17. -13 MW
3. -11_MW 10. -13 MW
4. -13 MW 19. -13 MW
5. -13_HW 20. -13__MW
6. -13_NW 21. -13 MW 1 I
7. -13 MW 22. .n,_MW i
8. -13Je4 23. -13 MW
9. -13 MW 24. -13 MW
10. -13=MW 25. -13 MW  !
11. -13 MW 26. -13 MW
12. -13 MW 27. -13__MW
13. MW 28. -13 MW 1 1
14. -13.MW 29. -13 MW
15. -13 MW 30. -13 MW INSTRUCTIONS I On this form list the average daily unit power level in MWe-Net for each day-in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note .that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.- <

(0625M/0062M/10) l

Report Period September, 1990 UNIT SHUTDOWNS / REDUCTIONS

  • BTRON *

(UNIT 2) **************************

No. Date h HQ.1Es Eg.a1Q.0 Method LER Number System Component Cause & Corrective Actica to Prevent Recurrence 7 9/1/90 5 718.55 C 1 N/A N/A N/A B2R02 (Refuel outage)

C**************

O Summary

  • c**************

TYPE Egason Method Systemt & Component

-F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-Ol61)

(0 25M/0062M/11)

-*- - s. ,,.:.y _%.._ ____w -_-.%.a. .. - ..__s.

. . ~ . . .-. _ .- .- - -- ~ - - .- .. --. - .- -

t t

-t

' * ~

. . I f

i EuUt(10EE_REERRI1HE.1EQUIREliEHIS (UNIT 2) for the month of StP1NDht d E9E >

1. Safety / Relief valve operations for Unit Two.. l 4

i VALVES NO & TYPE PLANT DESCRIPTION  ;

i DATE ACIMATED ACIMATION CCtlD1TIG( OF EVENT j 4

None i

2. Licensee generated changes to ODCM. (Y/N)

No.

4 -

3. Indications of failed fuel. (Y/N)

Yes. Unit is in refuel outage. Ultrasonic testing  !

of fuel will be performed to identify leaking fuel rods.

l t

4

'i s

i  !

~f l

- (0625M/0062M/12) s k

.i y -

,+ , , - - , '

L__. LICENSEE _EY.EHI_REI'QBTS .(UH12_2.1 The following is a tabular summary of all Licensee Event Reports for Dyron Nuclear Power Station, Unit Two, submitted during the reporting period, September 1 through September 30, 1990. This information is proviled pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licenste_.IYenLRepo1.t_RwnkmI Data Iltle of 0ccu nenca 90-004 8/16/90 Increased ASME test frequency exceeded due to administrative deficiencies and personnel error.90-005 8/11/90 Pre-outage modification work initiated without proper operability review due to personnel error.

l i

(0625M/0062M/13)

_ _ _ _ _ - _ - _ . _ _ - _ - _ - . _ _ -