ML20062C211

From kanterella
Jump to navigation Jump to search
Ack Receipt of 781013 Interim Rept Re Reactor Bldg Spray Piping Supports
ML20062C211
Person / Time
Site: Midland
Issue date: 10/30/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 7811070222
Download: ML20062C211 (1)


Text

.

r-h D f-Q 50-@ /,

  1. 3 f ~%,,,

u~,un er m s

,". g NUCLEAR REGULATORY COMMISSION

-]

3 ' {. i 5~ E

l o

REGloN til

,4e.('/

799 RooSEVE LT Ro AD at ~ roev~.itti~ois ois, OCT 3 01973 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:

Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:

Thank you for your interim report dated October 13, 1978, pursuant to 10 CFR 50.55(e) regarding Reactor Building Spray Pip >ng Supports.

We will review your final report on this matter upon ceceipt.

Your cooperation with us is appreciated.

Sincerely, 0 ***4 R. F. Heishman, Chief Reactor Construction and ch[ Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b

/ PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. North Myron M. Cherry, Chicago 781107ozz2 S

,