Requests Addl Info Re Consequences of Crane Failures When Handling Heavy Loads in Order to Complete Review.Submittal of Amend to Tech Spec Change Request 38 Requested in 45 Days
ML20062B928
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/16/1978
From: Reid R
Office of Nuclear Reactor Regulation
To: Herbein T
METROPOLITAN EDISON CO.
References
NUDOCS 7811020228
Download: ML20062B928 (3)


Text

-

hh(

3 ga magg, UNITE D STATES p

NUCLEAR REGULATORY COMMISSION y*

,j W ASHINGTON. D. C. 20555 f

October 16, 1978

%, *... * /

~

s.

t 1

Docket No. 50-289

.p k

H. J. G. Herbein Vice President

(

l'etropolitan Edison Company P.y0. Box 542 Reading, Pennsylvania 19603

Dear Mr. Herbein:

In order that we'may continue our revie'w for Three Mile Island Nuclear

~

Station, Unit No. 1 (TMI-1) of the consequences of crane failures when j:Rndling heavy loads, we find we nrej additional information.

The specific information.needed is given in the enclosure.

'It 151 requested thati.'you. provide this information within 45 days of

~

' receipt of this letter.

It is also requested that you submit by the same'date an amendment to your Technical Specification Change Request N3.s38, dated September 21, 1976, if your responses to this request for additional information and tM responses, contained in your letter of January 31, 1978, indicate' that such changes, are needed.

p.

s Sfnctrely.

t

f

.f.

-- Pobert W. Fdid, Chief

-Operating Reactors Branch #4 Division of Operating Reactors

(

~

~

Encloi'ure:

-~

Request'for.Additi6nal t

~

Information s

T

-- cc N/ enclosure:

3eesnext page

~f

.s

[

~

..,, h h h k%

g.

11etropolitan Ecison Coupany Cc:

G. F. Trowbrioge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 Il Street, N.W.

Washington, D.C.

20036 GPU Service Corporation Richard W. Heward, Pro,iect fianager fir. T. Gary Broughton, Safety and Licensing flanager 260 Cherry Hill Roaa Parsippany, itew Jersey 07054 Pennsylvania Electric Company 11r. R. W. Conrad Vice President, Generation 1001 Croad Street Johnstown, Pennsylvania 15907

!!iss liary V. Southard, Chairman Citizens for a Safe Environment P. O. Box 405 Harrisburg, Pennsylvania 17108 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)

Harrisburg, Pennsylvania 17126 i

)

men e

y

,y s - -,

r-w.

REQUEST FOR ADDITIONAL INFORMATION CONSEQUENCES OF CRANE FAILURES THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 1 DOCKET NO. 50-312 1.

2n your letters of February 14, 1976 and January 31, 1978, you define a transfer path for moving a fuel cask from the transporter to eleva-tion 348'-0".

In your letter of January 31, 1978 you also define a

" Unit 1 main hook travel area for loads over 15 tons." Among other uses, this travel area could be used for transporting a shipping cask

(

to the Receiving / Shipping Area.

Inasmuch as the cask transfer path was selected to assure the safety of that specific movement, provide the basis for the acceptability of moving casks or other loads weighing from 15 to 110 tons anywhere within the " Unit 1 main hook travel area for loads over 15 tons."

Inasmuch as no restrictions are placed on the limits of travel for 2.

loads weighing between 3000 pounds and 15 tons (except in the vicinity of the spent fuel pools), either:

(1) provide an analysis demonstrat-ing that dropping a 15 ton load at any point in the permissible area of travel (outside the " Unit 1 main hook travel area for loads over 15 tons") from the maximum permissible height would not damage redundant channels of safety related equipment or electrical cables, or (2) define a restricted area of travel and a restricted lift height and provide a similar analysis for these more restrictive conditions.

(