Text
a D?
DISTRIBUTION Docket NRC PDR JUL 2 61982 L PDR NSIC ORB #1 Rdg Docket No. 50-348 DEisenhut 0 ELD IE ACRS-10 Mr. F. L. Clayton CParrish Senior Vice President EReeves Alabama Power Company Gray Post Office Box 2641 Birmingham, Alabama 35291
Dear th'. Clayton:
We are reviewing your applications dated March 19 and April 21,1982 for an expansion to the Joseph M. Farley Nuclear Plant Unit No.1 spent fuel pool capacity.
In order that our review may continue, please provide iresponses to the enclosed request for information. This information is needed as early as is convenient.
However, you are requested to provide the information within 45 days of this letter.
Should yourhave any questions, please cor. tact the NRC Project Manager, Ed Reeves, on (301) 492-7396.
Sincerely, taroINAL SIGNED Joseph D. Neighbors, Acting Chief Operating Reactors Branch #1 Division of Licensing
(
j
Enclosure:
As stated I
l cc w/ enclosure:
See next page e
l 9208050019 820726 PDR ADOCK 05000 P
/
/0.DL omcr>
sunurut)
. ER.eev,,es :d s.
,DNe1 bo,rs, TNo
. 07./..h82.... 07/).l./82......07L../B care >
NRC FOPM M 00 M) NRCM 0ao OFflCIAL RECORD COPY veu eu -m *o
a Mr. F. L. Clayton, Jr.
Alabama Power Company cc: Mr. W. O. Whitt Executive Vice President N
Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 s
Ruble A. Thomas, Vice President -
Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 s
Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street Dothan, Alabama 36303 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 24-Route 2 Columbia, Alabama 36319 Mr. R. P. Mcdonald Vice President - Nuclear Generation Alabama Power Company P.O. Box 2641 Birmingham, Alabama 35291 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 b
b\\
~
w l
1
4 REQUEST FOR INFORMATION SPENT FUEL EXPANSION JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO.1
' NUCLEAR REGULATORY COMMISSION 1.
Outline by major tasks the methods to be used in the pool modifi-cation. You should specify the man-hours and average dose rate for each task and the expected total man-rem for the entire pool modification.
2.
Outline the actions that will be taken to assure that occupational doses during each task of the pool modification will be ALARA.