Corrects Errors in 780831 Submittal.Site Narrative Encl
ML20062B491
Person / Time
Site: Perkins  Duke Energy icon.png
Issue date: 09/25/1978
From: Dail L
DUKE POWER CO.
To: Regan W
Office of Nuclear Reactor Regulation
Shared Package
ML20062B493 List:
References
NUDOCS 7810300330
Download: ML20062B491 (3)


Text

_i

.t . . .

DUICE POWER CO.MPANY Er.EcTunc CErrcn. Uor ::178. C unt.orrr. N. C. cec 42 .

.. ..h L,i'e.2.....

. . nr.uT;;D cenemoarscu 7... ,

% ~

September 25, 1978 ff g Mr. William H. Regan, Jr., Chief t

"'**h Yc Environmental Projects Branch 2 k '

Division of Site Safety and  ; .r/

Environmental Analysis 6 gyR Qf J Nuclear Regulatory Commission 4/

Washington, D. C. 20555 . g J 4-

' W

Dear Mr. Regan:

Re: Perkins Nuclear Station Environmental Report Docket Nos. STN 50-488, -489, -490 Duke File No: PK-14444.00 Following submi ttal on August 31, 1978 of our response to the Staff's re-quest for additional information of August 18, 1978, several errors have been noted and are indicated below for correction:

1. Page 1-1, paragraph 3, 1ine 11: " departments had been compl sted" should be " departments has been completed"
2.
  • Page 1-4, paragraph 2,1 ine 5: " SERV" should be "SERC" 3 Table 5.1: " Bullocks Creek" should be " Bullock Creek"
4. Page 6-5, paragraph 3,1Ine 6: "3378 acres" should be "3370 acres" -

5 Page 6-6, paragraph 1, line 3: "1.1 mill ion" should be "1 3 mill ion"

6. Page 6-11, paragraph 3, line 2: "23 mil es" should be "16 miles" line 3: "7400" should be "4150" "1.1 mi 1I ion" shout d be "I . 2 miil ion" line 7: "260,000 acre-f ee t" should be "460,000 a c re-f e e t" pa ragraph 4: omit last sentence
7. Page 6-12, paragraph 4, line 1: "15" shoul d be "23" Iine 2: "nor th-no r thwes t" should be " north" "2350" should be "74C0" line 3: "1.3 mill ion" should be "1.1 millien" 1Ine 6: "760 feet ms!" shout d be "635 feee msl" 7 P-/ o 300.53 o .

my Mr. William H. Regan, Jr. ,

September 7~,, 1978 Page 2 ,

e * .

8. Page 6-14, paragraph 4, line 3: "to be' within 38,150 and" should be "to I be 21,000 and"
9. Page 6-15, paragraph 1, Iine 1: "5800" should be "6800" line 9: "s t l e" should be "s i te"
10. Page 6-22, caragraph 3, IIne 2: "1150" should be "11050"
11. Page 6-25, paragraph 1, line 3: "becuase" should be "because"
12. Page 6-27, paragraph 2, line 2: "s ta lons" should be "sta tions" paragraph 4, line 1: "two or titree sites" should be "two or three units" We are enclosing a brief narrative for the Perkins Nuclear site with Informa-tion consistent with that gIven in the site narratives in our response to Question No. 6.

Y urs ver truly, L. C. Dall LCD/DB8: sd Enc.

cc: H. E. Zittel 1

e--, ..m-.- .,m.,,y r.x,- -- , - - - - - , - ~ - - - - -

- - - . . w-- s-,.--~y-.

f Perkins .

The Perkins Nucicar Station site is located in Davic County, North Carolina ad-Jacent to the Yadkin River. Population within 50 miles of the plant site is

..'I

. 5 m i l l i o n .* Population within five miles of the plant site Is 4517 The closest population center, Vins ton-Salem, North Carolina, is 17 miles north-northeast of the plant site. Development of the site requires the construction of an 1100 acre lake at full pond elevation 740 feet msl. Average flow at the plant site is 2880 cfs from its drainage area of 2280 square miles. Full pond volume for the proposed reservoir is approximately 30,280 acre-feet.

The use of cooling towers at this site may require 2.4 percen,t of the average streamflow*of the river and as much as 32,500 acre-feet of Impounded water dur-Ing a recurrence of the historic drought.

Deveiopment of the site requires the constru'etion of a 6.1 mile access railroad and 8.2 miles of 230 kV and 7.9 miles of 525 kV transmission lines. Prior to site acquisition, Duke owned no land required for site devel.opment. Yard grade at elevation 710 feet mst will require excavations approaching 50 feet and will require extensive earthwork.

G 9