-~ Waterford 3 Steam Electric Station After Action Report Exercise Date - November 20, 2019 I
Radiological Emergency Preparedness (REP) Program I
Published: February 14, 2020
After Action Report/Improvement Plan Unclassified Radiological Emergency Preparedness This page is intentionally blank.
Waterford 3 Steam Electric Station I
I I
I I
I I.
I I
I
_I I
I
_I I
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Stearn Electric Station
- Waterford 3 Steam Electric Station After Action* Report Contents EXECUTNE
SUMMARY
........................................... ;.............................................................................. ;..................... 5 5;ECTION 1: EXERCISE OVERVIEW.... :..........,...................................................................................... :...................... 6 1.1
- Exercise Details........................................ :......................................................................................................... 6 1.2 Exercise Planning Team Leadership.................................................................................................................. 6 1.3 Participating Organizations.'.....................................-.......................................... :.................. :....... :................ :... 8 SECTION 2: EXERCISE DESIGN
SUMMARY
................ :...................... :...................................................................... 9 2.1 Exer~ise Purpose and Design.... ;........................................................................................................................ _9 2.2 Exercise Objectives, Capabilities and Activities................................................................................................ 9 2.3 Scenario Summary.............................................................................................................................................. 9 SECTION 3: ANALYSIS OF CAPABILITIES.............................................................................................................. 10 3.1 Exercise Evaluation and Results.........................................'.............. ;................. :.............................................. 10 3.2 Summary Results of Exercise Evaluation........................................................................................................ 10 3.3 Criteria Evaluation Summaries........*................................................................................................................ 12 3.3.1 Louisiana Jurisdictions..................................................................,.......................................................... 12 3.3.2 Risk & Support Jurisdictions.................................................................................................................... 14 3.3.4 Private Organizations................................................................................................................................ 15 SECTION 4: CONCLUSION........... :....... :...................................................................................................................... 16 APPENDIX A: EXERCISE TIMELINE..............................................................................,........................................... 17 APPENDIX B: EXERCISE EVALUATORS AND TEAM LEADERS............................................................... ~......... 18 APPENDIX C: ACRONYMS AND ABBREVIATIONS............................................................................................... 19 APPENDIX D: EXERCISE PLAN.................. :............................................................................................................... 21 3
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan This page is intentionally blank.
4 Waterford 3 Steam Electric Station I
I I
I I
I I
I I
I I
I I
I
I I
I I
I I
I I
I I
I I
I I
I I
I Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station EXECUTIVE
SUMMARY
On November 20, 2019, a Radiological Emergency Preparedness (REP) Plume exercise was conducted around the Waterford 3 Steam Electric Station (Waterford 3) located near Taft, St.
Charles Parish, Louisiana. The U.S. Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA) Region VI Office evaluated the exercise. The purpose was to assess the level of preparedness of state and local responders to react to a radiological emergency at Waterford 3. The exercise was held in accordance with DHS/FEMA policies and guidance concerning the implementation of state and local REP plans and procedures. In additional to the exercise, a medical services drill was conducted on October 17, 2019.
The previous exercise at this site was a plume and ingestion pathway exercise conducted on December 5-6, 2017. The qualifying emergency preparedness exercise was* evaluated on February 8, 1984. There have been several evaluated exercises conducted since, including this plume exercise.
pHS/FEMA Region VI Office wishes to acknowledge the efforts of the many individuals in the State of Louisiana, St. Charles Parish, St. John the Baptist Parish, Ochsner Clinic Foundation, and surrounding jurisdictions who participated in this exercise. Some of these participants are paid civil servants whose full-time job is to protect the health and safety ofthe public within the jurisdictions they serve. Many more are volunteers who make themselves available to perform a service to the community in which they live. Their participation is particularly noteworthy.
This report contains the final written evaluation of the biennial exercise including an out.of sequence medical services drill. The state and local organizations, except where noted in this report, demonstrated knowledge of their emergency response plans and procedures and adequately implemented them. As a result of the exercise and the drill, there were no Level 1 Findings, no Level 2 Findings, and no Plan Issues identified.
5
Unclassified Radiological Emergency Preparedness Program (REP)
- After Action Report/Improvement Plan Waterford 3 Steam Electric Station SECTION 1: EXERCISE OVERVIEW 1.1 Exercise Details Exercise Name Waterford 3 Steam Electric Station Type of Exercise Plume Exercise and Medical Services Drill Exercise Date November 20, 2019 (Plume Exercise)
October 17, 2019 (Medical Services Drill)
Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type.
Radiological Emergency
- 1.2 Exercise Planning Team Leadership Lisa Hammond RAC Chair FEMA Region VI Technological Hazards Branch Chief 800 N. Loop 288 Denton, Texas 76209 940-898~5199 lisa.hammond@fema.dhs.gov Linda Gee Federal Planning Team Lead FEMA Region VI Technological Hazards Program Specialist 800 N. Loop 288 Denton, Texas 76209 940:.383-5368 linda.gee@fema.dhs.gov 6
I I
I I
I I
I I
I I
I Ii 1:
I:
1' I
I
I I
I I
I I
I I
I I
I I
I I
I I
I I
r Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Jessica Walker State Planning Team Lead Louisiana Department of Environmental Quality Environmental Scientist 602 N. Fifth Street Baton Rouge, Louisiana 70802 225-219-3835 jessica.walker@LA.gov Gina Taylor Licensee Planning Team Lead: Plume Exercise Waterford 3 Steam Electric Emergency Planner 172265 River Road Killona, Louisiana 70057 504-739-6903 gtayo3@entergy.com Don Vincent Licensee Planning Team Lead: Medical Services Drill Waterford 3 Steam Electric Emergency Planner 172265 River Road Killona, Louisiana 70057 504-739-6694 dvince2@entergy.com 7
Waterford 3 Steam Electric Station
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station.
1.3 Participating Organizations Agencies and organizations of the followingjurisdictjons participated in.the Waterford 3 Steam Electric Station exercise:
State Jurisdictions Louisiana Department of Environmental Quality Louisiana Governor's Office of Homeland Security & Emergency Preparedness Louisiana Wildlife and Fisheries Risk Jurisdictions St. Charles Parish Homeland Security & Emergency Preparedness St. Charles Parish President St. Charles Parish Public Schools St. Charles Parish Sheriffs Office St. Charles Parish Emergency Medical Services St. Rose Fire Department St. John the Baptist Parish Office of Homeland Security & Emergency._
Preparedness St. John the Baptist Parish Planning & Zoning St. John the Baptist Parish President St. John the Baptist Parish Public Works St. John the Baptist Parish School Board St. John the Baptist Parish Sheriffs Office St. John the Baptist Parish Transportation St. John the Baptist Parish Fire Department St. John the Baptist Parish Animal Shelter Support Jurisdictions Ochsner Clinic Foundation Private Organizations Entergy WWL 870 AM Radio Station Mayeux Flying Service, LLC (MYU)
Federal Jurisdictions
- U.S. Nuclear Regulatory Commission 8
I I
I I
I I
I I
I I
I I
I.
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
~
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station SECTION 2: EXERCISE DESIGN
SUMMARY
2.1 Exercise Purpose and Design The DHS/FEMA Region VI Radiological Emergency Preparedness staff evaluated an exercise on November 20, 2019 to assess the capabilities of state and local emergency preparedness organizations in implementing their Radiological Emergency Response Plans and procedures to protect the public health and safety during a radiological emergen~y involving Waterford 3 Steam Electric Station (Waterford 3). The purpose of this report is to present the results and findings on the performance of the off site response organizations during a simulated radiological emergency.
2.2 Exercise Objectives, Capabilities* and Activities Exercise objectives and identified Capabilities/REP Criteria selected for the exercise are discussed in the Exercise Plan, Appendix D.
2.3 Scenario Sum.mary The exercise scenario was developed to evaluate the response of exercise participants to an incident requiring evacuatioq:9fthe public from the 10-mile Emergency Pla~g_Zone
- "~.-::,,,.,:
surrounding the Waterford-3',.'Sfoaril Electric Station. The exercise scenario provided for the
- ~::*:':--:':.*~':.-'
evaluation of St. John the Baptist Parish, St. Charles Parish, Ochsner Clinic Foundation, Louisiana Department of Environmental Quality and the Governor's Office of Homeland Security and Emergency Preparedness to test the ability of participants to formulate and implement protectjve action decisioµs.
9
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station SECTION 3: ANALYSIS OF CAPABILITIES
- 3.1 Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the November 20, 2019 exercise evaluation.to test the offsite emergency response capabilities of local governments in the 10-mile Emergency Planning Zone surrounding the Waterford 3 Steam Electric Station.
Each jurisdiction and functional entity was evaluated on its demonstration of criteria delineated in the exercise evaluation areas as outlined in the FEMA Radiological Emergency Preparedness (REP) Program Manual (January 2016). Detailed information on the exercise evaluation area criteria and the extent of play agreement used in this exercise are found in Appendix D of this report.
3.2 Summary Results of Exercise Evaluation The matrix presented in the table below, presents the status of all exercise; evaluation area criteria that were scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. Exercise criteria are listed by number and the demonstration status is indicated by the use of the following terms:
Met (M): No Findings assessed and no unresolved Findings from prior exercises.
Level 1 (Ll) Finding: An observed or identified inadequacy of organizational performance in an* exercise that could cause a determination that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a Nuclear Power Plant.
Level 2 (L2) Finding: An observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety.
Plan (P) Issue: An observed or identified inadequacy in the offsite response organizations (OROs) emergency plan/implementing procedures, rather than that of the OROs performance.
N: Not demonstrated 10 I
I I
I I
I I
I I
I I
I I
I I
I
I I
I I
I I
I I
I I
I I
I I
I I
I
~
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station Table 3.1 - Summary of Exercise Evaluation Exercise Evaluation - Criteria Met Evaluation Areas Demonstrated Criteria Jal, lcl, ldl, Iel GOHSEPEOC 2al,2bl,2b2 Louisiana IlC lal, ldl, lel, 5bl LDEQHQ Jal, lcl, ldl, lel LDEQEOF Jal, lcl,' ldl, Iel 2al, 2bl, 3al, 4a2 LDEO Field Monitoring Team #1 ldl, Iel, 3al, 4a3 LDEQ Field Monitoring Team #2 Id!, lel, 3al, 4a3 St. Charles Parish EOC & T/ACP lal, lcl, ldl, lel 2al, 2b2, 2cl, 3al,3bl,3dl,3d2 5al, 5a4, 5bl Jal, lcl, ldl, lel St. John Parish EOC & T/ACP 2al, 2b2, 2cl, 3al, 3bl, 3dl, 3d2 5al, 5bl WWL/EAS Radio Station 5al Ochsner Clinic Foundation
. Iel, 3al, 6dl St.Charles Parish Hospital Emergency
!el, 3al, 6dl Medical Services 11
Unclassified Radiological Emergency Preparedness Program (REP)
After Action.Report/Improvement Plan Waterford 3 Steam Electric Station 3.3 Criteria Evaluation Summaries 3.3.1 Louisiana Jurisdictions 3.3.1.1 Louisiana Emergency Operations Center In summary, the status ofDHS/FEMA criteria for this location is as follows:
- a.
MET: l.a.l, l.c.1, l.d.l, l.e.1, 2.a.l, 2.b.1, 2.b.2.
- a.
LEVEL 1 FINDING: None
- b. LEVEL 2 FINDING: None
- c.
PLAN ISSUES: None d.. NOT DEMONSTRATED: None
- e.
PRIOR ISSUES - RESOLVED: None
- f.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.2 Louisiana Department of Environmental Quality Headquarters In summary, the status of DHS/FEMA criteria for this location is as follows:
- a.
MET: l.a.1, l.c.l, l.d.l, l.e.l.
- a.
LEVEL 1 FINDING: None
- b. LEVEL 2 FINDING: None
- c.
PLAN ISSUES: None
- d. NOT DEMONSTRATED: None
- e.
PRIOR ISSUES - RESOLVED: None
- f.
PRIOR ISSUES'- UNRESOLVED: None 3.3.1.3 Louisiana Department of Environmental Quality EOF
. In summary, the status ofDHS/F;EMA criteria for this location is as follows:
- a.
MET: l.a.l, l.c.1, l.d.l, l.e.l, 2.a.1, 2.b.1, 3.a.l, 4.a.2.
a.. LEVEL 1 FINDING: None
- b. LEVEL 2 FINDING: None
- c.
PLAN ISSUES: None
- d. NOT DEMONSTRATED: None
- e.
PRIOR ISSUES - RESOLVED: None
- f.
PRIOR ISSUES - UNRESOLVED: None 12 I
I I
I I
I I
I I
I I
I I
I I
I_
I I
~
I I
I I
I I
I I
I I
I I
I I
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Stearn Electric Station 3.3.1.4 Louisiana Department of Environmental Quality Field Monitoring Team One In summary, the status ofDHS/FEMA criteria for this location is as follows:
- a.
MET: 1.d.l, 1.e.l, 3.a.l, 4.a.3.
- a.
LEVEL 1 FINDING: None
- b. LEVEL 2 FINDING: None
- c.
PLAN ISSUES: None
- d. NOT DEMONSTRATED: None
- e.
PRIOR ISSUES - RESOLVED: None
- f.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.5 Louisiana Department of Environmental Quality Field Monitoring Team Two In summary, the status ofDHS/FEMA criteria for this location is as foll()ws:
- a.
MET: 1.d.l, 1.e.l, 3.a.l, 4.a.3.
- b. LEVEL 1 FINDING: None
- c.
LEVEL 2 FINDING: None
- d. PLAN ISSUES: None
- e. NOT DEMONSTRATED: None
- f.
- PRIOR ISSUES - RESOLVED: None
- g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.6 Louisiana Joint Information Center In summary, the status ofDHS/FEMA criteria for this locaticmis as follows:
a..
MET: 1.a.1, 1.d.l, Le.I, 5.b.l.
.a.
LEVEL 1 FINDING: None
- b. LEVEL 2 FINDING: None
- c.
PLAN ISSUES: None
- d. NOT DEMONSTRATED: None
- e. PRIOR ISSUES - RESOLVED: None
- f.
PRIOR ISSUES - UNRESOLVED: None 13
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Reportllmprovement Piao Waterford 3 Steam Electric Station 3.3.2 Risk Jurisdictions.
3.3.2.1 St. Charles Parish Emergency Operations Center In summary, the status ofDHS/FEMA criteria for this location is as follows:
- a.
MET: l.a.l, l.c.1, l.d.l, l.e.1, 2.a.l, 2.b.2; 3.a.l, 3.b.1, 3.d.l, 3.d.2, 5.a.1, 5.a.4, 5.b.l.
- a.
LEVEL 1 FINDING: None
- b.
- LEVEL2 FINDING: None
- c.
PLAN ISSUES: None
- d. NOT DEMONSTRATED: None
- e.
PRIOR ISSUES - RESOLVED: None
- f.
PRIOR ISSUES - UNRESOLVED: None 3.3.2.2 St. John the Baptist Parish Emergency Operations Center In summary, the status ofDHS/FEMAcriteria for this location is as follows:
- a.
MET: l.a.l, l.c.l, l.d.l, l.e.l, 2.a.l, 2b2, 3.a.1, 3.b.l, 3.d.l, 3.d.2, 5.a.1, 5.b.l.
- b. LE\\LEL-1-EINDING: None
- c.
LEVEL 2 FINDING: None
- d. PLAN ISSUES: None
- e.
NOT DEMONSTRATED: None
- f.
PRIOR ISSUES - RESOLVED: None
- g.
PRIOR ISSUES - UNRESOLVED: None 3.3.3 Support Organizations 3.3.3.1
- Ochsner Clinic Foundation In summary, the status ofDHS/FEMA criteria for this location is as follows:
- a.
MET: l.e.l, 3.a.1, 6;9)
- a.
LEVEL 1 FINDING-:*]fone f - i ? *:, *~,", --- '
- b. LEVEL 2 FINDING:~None
- c.
PLAN ISSUES: Nomf
- d. NOT DEMONSTRATED: None
- e.
- PRIORISSUES-RESOLVED:None
- f.
PRIOR ISSUES - UNRESOLVED: None.
/
14 I
I I
I I
I I
I I
I I
I I
I
I I
I I
I I
I I
I I
I 1*
I I
I I
I I
.1 Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station 3.3.3.2 St. Charles Parish Hospital Emergency Medical Services In summary, the status ofDHS/FEMA criteria for this location is as follows:
- a.
MET: l.e.l, 3.a.l, 6.dJ
..... *1.""'-"0-.::...
- g.
LEVEL 1 FINDING~*Nohe 1,~*~-=tf, '.:
- h. LEVEL 2 FINDING:~None
- 1.
PLAN ISSUES: None J.
NOT DEMONSTRATED: None
- k.
PRIOR ISSUES - RESOLVED: None
- 1.
PRIOR ISSUES - UNRESOLVED: None 3.3.4 Private Organizations 3.3.4.1 EAS Radio Station WWL In summary, the status of DHS/FEMA criteria for this location.is as follows:
- a.
MET: 5.a.1
- b.
LEVEL 1 FINDING: None
- c.
LEVEL 2 FINDING: None
- d. PLAN ISSUES: None
- e. NOT DEMONSTRATED: None
- f.
PRIOR ISSUES - RESOLVED: None 15
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvem.ent Plan Waterford 3 Steam Electric Station SECTION 4: CONCLUSION Based on the results of the exercise, the offsite radiologicaJ.emergency response plans and*
preparedness for the State of Louisiana and the affected local jurisdiction are deemed adequate to provide reasonable assurance that appropriate measures can be taken to protect the health and safety of the public in the event of a radiological emergency. Therefore, 44 CFR Part 350 approval of the off site radiological emergency response plans and preparedness for the State of Louisiana site-specific to Waterford 3 Steam Electric Station will remain in effect.
16 I
I I
I I
I I
I I
I I
I I
I I
I_
I I
I
Unclassified
_ Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Stea_m Electric Station APPENDIX A: EXERCISE TIMELINE Table 1 - Exercise Timeline DATE: 2019-11-20, SITE: Waterford 3 Steam Electric Station, LA
()
"O etc!
~
~
u etc!
=
0 0
u
.9
>I<
Emergency Classification Level o'r 0
u 1;j
.a 0
0 0
00 Event g
>I<
IZl "ta
>I<
O'
~
00 IZl
~
0
_p..
§
- r:
>I<
u
]
i
.E p..
IZl O'
O' 0
- r:
~
.a ou
.§
>I<
>I<
u 0
0 0
E--<
c::,
....:l
....:l
~
. IZl v5 ~
Unusual Event NIA Alert NI/A 0654 0654 Site Area Emergency 0816 0827 0827 0830 0828 0827 0827 General Emergency 1018 1030 1030 1026 1021 1029 1029 Simulated Rad. Release Started 1056 1126 1126 1126 1126 1125 1127 Simulated Rad. Release NIA NIA NIA 1208 1221 Terminated Facility Declared Operational 0837 0654 0913 0948 0848 24/7 Ops 0851 Declaration of State of Emergency 0933 0933 0943 0933 0859 Exercise Terminated 1229 1229 1200 1227 1220 1235 Early Precautionary Actions:
1040 1035 SJP: 1037 - School Transfer SCP: 1040- Evac. PDAFNs Individuals 1st Protective Action Decision:
1115 1115 Evac: Al, Bl, Cl, DI, C2
,"\\_.:_Tf.
Monitor & Prenare: All Other PAS f ~~
Mj '
1st Siren Activation 1115 1115 1st EAS or EBS Message 1117 1124 1117 KI Administration Decision:
1208 1221 17
I I
I*
I I
I I
I I
I I
I I
I I
I I
I I
I Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station APPENDIX B: EXERCISE EVALUATORS AND TEAM LEADERS DATE: 2019-11-20, SITE: Waterford 3 Steam Electric Station, LA LOCATION EVALUATOR AGENCY Louisiana Emergency Operations Center
- Brad DeKorte FEMAVI Andy Chancellor FEMA VII Louisiana Department of Environmental Quality Headquarters
- Andy Chancellor FEMA VII Louisiana Department of Environmental Quality EOF
- Nan Williams FEMA VI Dennis Wilford ICF Louisiana Department of Environmental Quality Field
- Jeffrey Clark FEMA VII Monitoring Team One Louisiana Department of Environmental Quality Field George Brozowski EPA Monitoring Team Two Waterford 3 Joint Information Center
- Thomas Hegele ICF Bill Maier NRC St. Charles Parish Emergency_Operations Center
- Chris Bellone THDHQ Elena Joyner Nan Williams FEMAIX FEMA VI St. John the Baptist Parish Emergency Operations Center
- Kevin FEMAII Malo11e Ochsner Clinic Foundation
- Nan FEMA VI Williams FEMA VI Timothy Pflieger FEMA VI Brad DeKorte St. Charles Parish Hospital Emergency Medical*Services
- Timothy Pflieger FEMARVI Brad DeKorte FEMARVI
- Team Leader 18
Unclassified I
Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station I
APPENDIX C: ACRONYMS AND ABBREVIATIONS I
Acronym AAC ARCA cc CDE CPM DRD EAS EAL ECL EMD EMS EOC EOF EP EPA EPZ EW FEMA FMT FTC GE GOHSEP GPS HAB HOO ICP nc KI LDEQ LDH MDA mg MHz mR ORO OSL Description Accident Assessment Coordinator Areas Requiring Corrective Action Communications Center Committed Dose Equivalent Counts Per Minute Direct Reading Dosimeter Emergency Alert System Emergency Action Level Emergency Classification Level Emergency Management Director Emergency Medical Services Emergency Operations Center Emergency Operations Facility Emergency Preparedness Environmental Protection Agency Emergency Planning Zone Emergency Worker Federal Emergency Management Agency Field Monitoring Team Field Team Coordinator General Emergency LouisianaGovemor's Office of Homeland Security and Emergency Preparedness Global Positioning System Hostile Action Based HQ Operations Officer Incident Command Post Joint Information Center Potassium Iodide Louisiana Department of Environmental Quality Louisiana Department of Health Minimum Detectable Activity milligrams megahertz milliroentgen/millirem Off-site Response Organizations Optically Stimulated Luminescent 19 I
I I
I I
I I
I I
I I
I
- 1_
I I
I,
I I
I I
I I
I I
I I
I
- I I
I I
I I
.I After Action Report/Improvement Plan Acronym PAD PAG PAR PIO
RACES RASCAL REA REP RO RSO SCP SEL SEOC SJP SOP SRD TEDE T/ACP TLD UCG UMR URI VHF Waterford 3 W3 Unclassified Radiological Emergency Preparedness Program (REP)
Waterford 3 Steam Electric Station Description (Continued)
Protective Action Decision Protective Action Guide Protective Action Recommendation Public Information Officer Persons with Disabilities & Access/Functional Needs Individuals Personal Protective Equipment Permanent Response Areas Permanent Reading Dosimeter Roentgen Radio Amateur Civil Emergency Services Radiological Assessment System for Consequence*
Analysis Radiation Emergency Area Radiological Emergency Preparedness-Radiological Officer Radiation Safety Officer St. Charles Parish Senior EOF Liaison State Emergency Operations Center St. John the Baptist Parish Standard Operating Procedure Self Reading Dosimeter Total Effective Dose Equivalent Traffic & Access Control Point Thermoluniinescent Dosimeter Unified Command Group Unit Manning Roster Unified.Rascal Interface Very High Frequency
- Waterford 3 Steam Electric Station Waterford 3 Steam Electric Station 20
Unclassified Radiological Emergency*Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station APPENDIX D: EXERCISE PLAN Waterfo*rd 3
- Steam Electric Station*
. Extent of Play
- 2019*
- 21 I
I I
I I
I I
I I
I I
I I
I I
I_
I I
I I
I I
I I
I I
I I
I I
I I
I I
I
.I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station I. ASSESS:M!EN][' AREA]: E:MERGENCY OPERA.TIONS ~IAl"1"AGlEl\\fi.NT A. S111b-eJement ].a - Mobilization Criterfon I.a.I: OROs use mfective procedures to alert, notify, and mobilize emergency persm:mel and activate facilities in a timely manner. (NlJ-:R.EG-0654/FElo.iIA.-REP-1, i\\.. 1.a,. e; A.3, 4; C.1, 4, 6; D.4; E.1, 2; G.3.a, H.3, 4)
- 1. Locati.owi Louisial:i!a State Emergency Operations Center {SEOC), Louisiana Depmrtmem of Environmental Quality (LDEQ) Headlq[tllarters (LDEQ HQ), LDEQ Emergency Operations Facility (EOF), Joint Information Center (~) St. Charles Pari~ EOC. St lfohn the Baptist ParishEOC
- 2. Extent o.f Pil.av
- a. LDEQ JP!a)"eiI'S,vill be pre~staged on fue S 111 :floor of Headquarters at 6:50 am.. and begin! the aspects of mobilization by 1 :00 am 'aritb. a simulated cue card starting at ALERT.
I
- b. One of the h:i.;o LDEQ Field Monitoring I eams (F1'IT) may pre-stage at the Southeast Regional Office (SEJRO) on 201 Ev.n Road, BuikHnli?: 4, Suite 420 N e*w Orleans, Louisiana, and he deployed remotely from that location.
- 3. Leve[ 2 FindinEil - None C. Sab-ele:ment Le - Direction md Control Criterion l.c.1: Key JPEµ".ilOnnel v.rith leadlership roles for the ORO provide direction andl control to that jparl of fue overall response effort :for 1.:i.-hich they are reilponsible. ~""UREG-,0654.IF.E~IA.-
REP-1. A.Ld; A.2.a, b; A.3; C.4, 6)
- 2.
fxtent of Play
- 3.
Lev,ei 2 Findin~i! - None D. Sub-element ].d - Communications Equipment Criterion ll..d.l: At 11.earst t\\1,;o communication systems are availab!l.e, at leailt one operatea pr,operly, and commlmic!:ition linh ar,e established andl mamt!ined 'illiith appropriate locations.
Commmricatiom capabilities are mamgedl in support of emer_gency opa:ations.
(NUREG-
. 06541FElvi'fA.-REP-l, F.1, 2) 22
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- 1. Loaiti.ollil Louisiana SEOC, LDEQ HQ, LDEQ EOF, LDEQ Field 1.fomtorimg Team (BvIT) 1, LDEQ FMT 2, JIC, St. Charles Parish EOC, St J.ohn the Baptist Parish EOC
- 2. Extent of Plav
- a. The LDEQ Contract Radiation I.aoomto1y "iilJi.ll not be evaluated m this exercise, and any communication v.itb. it,,..ill he mnulared:
LI b. Commmrications to the S,oud:lhem Muma! Radiation.Assistance Plm {S~IR..A.P) states, except for TX and! -A.R. '1IJi1l be simulated.
- c. Correction-on:..&e-mot *will be considered at these locations* u the* discretion of and concwrence 'bemreen the evaluator and' the controller. Caution should be exercised ~
insure tlhat exer,cise play lil not m.tenuptetl. Correction-on-the-spot at Parish EOC' s: are limited to areas outside the EOC operatiom area {i.e.* emergency \\'VOrker briefings and issue of dosimmy in other rooms.).
I
- 3. Level 2 Findings - None E. Sub-element l.e - Equipment and Supplies to S"!1!!JPrport Operations Criterion l.e.l: EqUHpme.nt, maps. displays., dooimetry, potassium iodide (KI}. and other supplies are ~~Pl to support eme~cy operations. ~tJREG-0654.IFEM *.\\.-REP-1, H. 7, 10; IJ, 8, 9; J.1 O.a, b. e; J.11, 12; KJ.a; K.5Jb).
- 1.
Loc!ilt:i.ons Louisiana SEOC, LDEQ HIQ. LDEQ EOF, WEQ FMI 1, LDEQ F1'IT 2. JIC, St. Charlei Parish EOC, St John the Baptist Parish EOC
- 2. Extent o.f Plav
- a. Charcoal cmridges instead.of silver zeolite v.till lbe 1JJSed for air sampling. Sih.rer Zeoiite are included m ThIT kits and \\\\ill be available for inspection by eval11Bator.il.
- b. Simvey merers,
- dosimetry, and KI ~e not applicable*~ the J]C or Lmrisiana SEOC.
- c. TI..D/OSLs uiill be av.aihhle for all emergency workers and a\\raila.ble for :inspection by e,;.,alua.hm. Sim:c.oted TLDs *will be used m. plaice for spare OSL badges for LDEQ players when applicable.
23 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station di. Correction-on-1:lh.e-:mot will be considered at these locations :E:1: the discretion of and concurrence bernreen the evaluator and.the controller. Cmm::ion should be exercised to ensure that exercise play is not im:,enupted.. Correction-on-the-spot at Parish EOC's: a:re limited to areas outside the EOC operations area*(i.e., emergency \\'l.rorker briefings and issue of dosimetry in otlher rooms).
- 3. Lev,el 2 Findingi! ~ N~e
. II.
ASSE.SSAffil\\T! AREA 2: PROTECTIVE ACTION DEC][SI0N-}1AKING A. Sim.b--element 2.a - Emergency Worker Exposure Contrnl Criterion 2.a.l: OROs 11Se a d&::ision-m!!kmg proceiis, corir.idlering relevant factora and appr,opriate coordination, to w.mre that an expo.sure qontrol system, including the use,of KI, js in place for emergency \\,1orlrers, including pro,;,ri~ions. to authorize radiation expo.imre in excesa of administrative limits or protective action guides. (NUREG-0654,IFEl\\.[A-REP-l, C.6; J 1{!, e f K.4)
- 1. Locations I
Louisiana SEOC, LDEQ EOF, St. Charles Pari:ih EOC, St John the Baptist Parish EOC
- 2. Extant of Plav
- a. If the scenmo does not \\\\rmant: ~discus.si,on on the authorization to administer Kl, then the.
criteria shall be accomplished thr-ough an intenieiv \\\\:ith the e\\<-.aluator.
\\
- b. If the scenario does not,,.-ammt a dliscussion on emergency *1-vorlce:r {E'IJl) exposure exceeding administrative limitll, then the criteria shall be acoomplishe<l through an inteniie\\:i, with the evaluator.
N oite: Parish de,cnsion-makers receive recommendations :for Kl :and! ffi.'5l exposme fr.om the Louisiana SE.OC..
- 3.
Le\\rel 2 Fmdms - None B. Sim.b-element 2. b. - Radiological Assessment and Protectin Adion Recommend!ations and*
Decisions fo:r the Plume Phase of the Emergency...
- Criterion 2.b.h A.plPropmite [Protecti;,te action recommendations (P.4.R.s) are !bailed on available information on plant condlilions.,*~eld monitoring data, anid lecemee and ORO dose ]Projections., as well l.:!s !knowledge of onsite and offsate environmental conditions. * ~""lJREG..:0654/FEM.~-REP-1, 110 and Supplement 3)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- 2. Extent of Pila.v The LDEQ EOF controller may mject simuhited fielidmonitoring data to the Dose Jl.ssessmem
.Cooromator for the pmpose of dose projection validation and *veri:ffcation through back calculmiom.
- 3. level 2 FindinEi - None Criterion 2.b.2: A ci!ecisicm.-malr.mg process involrvmg ccm..~deration of appropriate factors and necessary coordination iii used to make protective action decisions. (P ADs) for the general public (including the re::ommendation for the use of KL if' ORO policy). ~"1JREG..c0654.IF'EvUl-REP-l, A.3; C.4, 6; D.4; J.9; J.10.( m)
- 2. Extent of P!a\\*
According to the State of Louisiana:' s polic}', KI is not considered for the general public.
- 3. Levell 2 Fm.dings..... Nooe
- C. Sub-element 2.c. - PAD Consideration for the Protection of Persons mth Disabili:tiies and Access/Functional Needs Criterio,Ji 'l,cd: Protecth?e action decisions are ma.die., as appropriate. for groups of persons: with.
disabilities and accessifunctional needls. {NUREG-0654.IFEl,..fA-REP-~4; J.9; J.10.d, e)
- 2. Level 2 Findings - None I.
ASSESS1\\.IENT AREA 3: PROTECTIVE ACTION IMP1El.1IENIATION
. A. Sub-element 3.a - lmplementa1ion of Emergency Worker Expos1J1re Conttol Criterion 3.a.i: The OROs ism~ apjpirOJPri!lte dosimetry, Ki, procedures, and manage radiofogical exposure to emergency \\'\\"Orlrets in accordance VLifu the plans/ procedures. Emergency urorkers periodically and at the.end of each mission read. their dosimeters and record the re.adings on the appropriate exposure record or chart.
OROs maintain appropriate record-keeping
- of the administration of KI to emergency workers. (1\\l'"UREG-0654.IFEvL.\\-REP-1, J.1 O.e; K.3.a, b; K.4)
- Parish EOC:
25 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I II I
I I
I I
I I
I I
I I
- Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- 2. Extent of Play
- a. Area dosimetry "Rrill be used in both Parish EOCs.
- b. TI..D/OSLs will be available for aU emergency "Jrorkers and, a\\railable for inspection by evaluators. Simulated TLDs \\,rilil be 1.ned in place of spare OSL or TLD badges *when applicable.
- c. St John the Baptist Parish and St Charles Parish Traffic and Access Control Points persomiel 'IJ.ill fbe located at the p,=..rish EOCs,,Nhere they wi.11,demo~te the cmeria via intenrie1.~*- No :travel to Traffic and l\\.ccess Control Points \\\\ill be performed.
di. Correction-on-tlhe,..;mot will be oomidered at these locaticms at the cliscretion of and concmrence between the evaluator and the controller. Caution should be exercised m..
insure that exercise play ii.i not.intermpted. Correction-on-the-spot at,Parish EOC' s are limited to areas outride fue.EOC operations ar,ea (i.e., emergency worker briefings and issue of dosimetry in other rooms).
- 3.
Lev,el 2 Findinl?cii - None lB. Sub-eiement 3.lb. ~ [mp[em.entation of Kl Deicis~n for Instimtionaliled Todhidnals and the General P'ublic Criterion J.b. l: KI and appropriate instructions are a-i;railable if a decision to recommend urre of KI is made.
Approprfate re:::ordl-keepmg of the ad.ministration of KI for insti:tm:ionalized individuals is maintained. (NJ'JREG-06541Ffil..iA-REP-l, J.10.e, f)
- 2. Extent of Play
- a. If the PAD driven by the scenario does not include Protecfare JResponSie.Areas (PR.A.) 11,.*hich warrant a discussion on protective actiop. 'decis~os for. the protection of special populations=. then the criteria shaU be accomplished through :f.lli! interview with* the evaluator.
- b. If the ;ilce:nario doeil not warrant a discur~l!ion on Kl deeisiom then the criteria will be acc..omplisb.ed through an inten'le'W','i.:ith the evaluator.
- c. According to the State of Louisiana's policy, Kli is not considered! for the general public.
26
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station dL Correcti.on-on-tlb.e-,mot *will be considered at these locations at the discretion of and concmrence between the evaluator and the controller. Caution should be exercised :m.
insure tllat exercise play is not interrupted. Correction-on-the-~pot at Parish EOC' s are limited. to areas outside the EOC operations area (i.e., emergency ~rorker briefings and issue of dosimetry in other rooms)..
- 3. Level 2 Findimrn-None D. Sub-element 3.d. - 1lmplementati.on of Traffic and Access Coatrol Criterion 3.d.]: Appropriate trElffi.c and access control is established. Accurate ms.tractions are provided to traffic and access control personnel (?,,;ll.JR.EG~0654'FE1*:£A.-REP-1, A3; C.1=4; J.10.g, j)
St Clharles Parish EOC, St. Charles: Parish T/ACP, St. John the Baptist Pari!h EOC, St. Jolm the Baptist P~rsh TlACP
- 2. Extent of Plav a This may be demonstrat~ out of sequence.
- b. One traffic and access oontrol staff \\\\rill demonmate b:J.owledge of their roles and responsibility by discussion wnh the evaluator. The discussion v.ill be at the EOC. Travel to the traffic and access control point Vt.'lli not be demonstrated
- c. If the scenario does not warr2lllt this discussi~n at a location, the controller v.,ill inject data to initiate a discmsion.
di. Correction-on-tlb.e-,mot will be considered at these locations *at the discretion of and concmrence between the evaluator and the controller. G,wti.@n should be exercised m..
insure tlh.at exercise play is not mtmrupted. Correction-on-the-spot at Parish EOC's are
- *
- limited to areas outside the EOC opemtions area (i.e., emergency nrorker 'briefings: and
... issue of dosimetry in other rooms).
- 3. level 2 Finclimrn-None.
Criterion 3.d.2: Impediments to evacuation are identified! and resolved (NUREG-0654/FEll.{A-.
REP-1, J.10.k)
- 1. Locati.oni; St. Clbarles Parish EOC, St. Charles: Parish T/ACP, St. John the Baptist Parish EOC, St. John the Baptfat Pari~ T/ACP
- 2. Extent of Plav 27 I
I I
I I
I Ii I
I I
I I
I I
I I
I I
I
I I
I I
I I
I I
I
- I I
I I
I I
I I
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- b. A com:roller inject \\\\:ill be used to initiate the demonstration for thh criterion. The inject will occur during the evaluation and it will be on an evacuation route. It \\\\:ill trigger the re-routing of traffic and the parishes will coordinate this re-routing \\\\11th the JIC in order to communicate the alternate route to evacuees that are lea\\:ing the area No implementation
,1i.:ill ~.Y.Q.W:H:; the situation and solution,:i.:ill be mscussedl m the appropriate EOCs.
- 3. Lev,el 2 Finding;;-None I..ASSESSMENT AREA 4: FIELD ~lEASURE:MIENI'S AND ANALYSES A. Sub-Element 4.a - Plume Phase Field :Measurements and Analyses Criterion 4.a.2: Field teams (2 or more) are mmaged to obtain ~fi~P! information to help chB1racterize the rel.efis;e and to control radiation ~xpo~e. (Nt}R.EG-0654/FEM:A.-REP-1, C.1;
- H..12; L7, 8, 11; 110.a)
- 1.. Loe21tiom 1DEQEOF
- 2. Extent: of Plav
- a. LDEQ ThIT Coordinator, Dose Assessors, and other i..DEQ EOF personnel. may be presented with controller injects as needed them to characterize the releas,e.
- b. The LDEQ EOF controller may mject simulated field m6mtormg data to t!he Dose Assessment Coordinator for the purpose ()f dose projectibn 'iialidation and verification through b~kcalculatipns:.
- 3. Level 2 Findings - None
. *' ~,..
l:.
~
Criterion 4.a.3:.tunbient radiation measurement~* are.mad~ and re;corded at appropriate locations, and radioiodine and particulate samples are collect~d.. Teams will move to an appropriate lm;.r background location to cletemrine whether an)i significant (as specified in the plan and/or procedures) amount of radlioactivity bas been collected, on the sampling media. (NUREG-0654/FE!vIA-R.EP-1, CJ; H.12; L8, 9; J.10.a)
- 2. Extent: of Plav 28
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- a. LDEQ FMrs will not don anti-contamination s.uites dming the exercise.
Anti-contammaticm suites are available in field team !kits.. Proper dom:ring and doffing techniques
- will be demonstrated by one member, either prior to deployment or follcro.ing termination*
of the exercise. FMTs \\'Vill don gloves andl booties during the exercise.
- b. Charcoal cmtridges. instead of sBlver zeolite i,1,,ill be used for air sampling. Silver Zeolite are included in ThIT ki'tis and *will be available for inspection by evaluator.ii.
- c. CorreCllion-on-~sipot '\\\\,ilJ. be considered at these locations at the discretion of and concmrence. bernreen the evaluator and the controller. Cmtion should* be exercised to
.ensure that exercise play is not intenupted.
- 3. Level 2 Findings - None V.
ASSESS~IENT AREA 5: EMERGENCY NOTIFICATION & PUBLIC ThTJ'ORMAIION A. Sub-element 5.a - Acii,*aao!ll *of !ih.e Prompt Alert mdi Notificail:ion System Criterion 5.a.l: Acti~rities associated v.rith pmlliIY alerting and notification of the public I are completed in a timely manner follcro.ing the.initial decision by authorized offuite emergency officials fo notifV the public of.m, ~~
JjjpJim,cm. The imitial imtruC1l:i.OI11al message to the public must mc:lude as a minimum. the elem"'...nts. reqiuired by current REP guidance. (NUREG-0654.iFE!viA-REP-1, E.5, 6, 7)
- 1. Locations St Charles Parish EOC, St. Jolm the Baptist Parish EOC, VlVilL Radio, 400 Poydras Street, Suite 800, New Orleans, LA 70130
- 2. Extent of Plav
- a. F ollOl'l.iing the dlecision to actrvate the. alert and notification system, the acfa.ration procedures v.ill be demonstrated up to the point of acfa.*ation. The Siren activation \\\\iii.I be simulated. *
- b. Simulation of the siren activation wi111be in real time sequence with the transmission of the Emergency.Alert Systemt EA.S message.
- c. Upon receipt of the mesilages, the \\V\\VL radio s.ta.tion official nill demonstrate the procedure to broadcast the message. The message '\\'\\ill be read to the evaluator but 'Will not be broadca.sted!.
- 3.
Lfflrei 2 Findings - None.
29 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
. C1iteii0n 5.a.4: Activities associated with FEI\\ILl\\.-approved exception areas (where applicable) are completed Virithin 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency sima:tion (NUREG--0654lFEl\\1A-REP-1, E.6; Appendix 3.B.2.c)
- 2.
Extent of Play
- a. St Charles Parish exception area in quadrant B will be demonstrated out-of-sequence on a date 1BD. The alerting along this route v.rfil be sinrulated.
- b. The alert message will be demonstrated on the low volume setting to the evaluator's satisfaction prior to the actual demonstration of the alert route.
- c. Helicopter will be hm.'ering for the evaluator at the altitude reqtiired for announe:e~ent demonstration. Announcement will be a testing phrase and not au actual alert messrge.
The demonstration of flight pattern \\Vill follow,
- 3.
Level 2 Findini:!s - None B. Sub-element 5.b - Subsequent :Emerge,ncr Information and Instmctions for the Public and the l\\Ieclia C1itelion 5.b.l: OROs provide accurate subsequent emergency information and instructions to the public and the news media in a timely manner. (l\\l"UREG-0654.IFEMA.-RE.P-l, E.5, 7; G.3.a, G.4.a,c)
- 2. Extent of Plav
- a. Utility, State, and Parish representatives will demonstrate the ability to prmride,emerg~y information and instructions to the public consistent with the sc~io.
t :
- b. Ne'i,;.rs media will :not be present. Selected personneJ,;i,<iij simµlate the rQle of rep9I1efS asking questions during brieiings. *
- c. Controllas will inject public phone team messages, m~ phone: team messages and ~rs briefing messages.
- d. Rumor control will be demonstrated at the JIC.
30
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- e. The Louisiana St,:..ite, EOC does: not disseminate subsequent messages: to the public. All messages should -come through the JIC.
Ll 3. Level 2 FindinEs - None
~ '\\'l.
GENERAL EXT&'1T-OF-PLAY ffiOP):
A. WitlU~KB!SlN: last minute additions or changes to any previously approved! Extent-of-Play, all suggested clbanges must be forn'ardled to tbje RAC Chair for approval.
B. The goal of all o:ffsite response organizations (ORO) is to protect* the health and safety of the public.. This goal is a.cbievedl through the execution of appropr:iate pl.ans and! procedures. It is recognized! that situations; may arise that could! limit the organizations m the exact ~cution of these :plans and p-rocedures.
_c. In the event of an unanticipated! situation, OROs are permitted! to exercise flexibility in the 1
imp~entati.on o~therr plans and procedures :in ~rder to succe~sfully achieve the objective o~
protection of public health and safety and protection of the em.'l!onment.
D. As a statement of fact, no ORO,,ill d!eh"berately deviate from its plans and procedureJl v..'itth the intent of avoiding responsibility" VII.
REFERENCES:
Radiological Emergency Preparednen Program l\\ofanual - FE:t...1A P-1028/Janu~ 2016 31 I
I I
II I
I I
I I.
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I 1*
I I
I I
I I
I After Action Report/Improvement Plan Unclassified Radiological Emergency Preparedness Program (REP)
STATE OF LOUISIANA Waterford 3 Biennial Exercise November 20, 2019 Schedule of Events Waterford 3 Steam Electric Station l\\Ionday, No,*ember 18, 2019 8:30am 9:30am LDEQ Player Pre-Exercise :Meeting Conference Room 819 at LDEQ, 602 North.
Fiflh Street, Baton Rouge, LA 70802 (Point of Contact Jei.sica Walker, 225-219-3835)
LDEQ Controller Briefing, Coriferen..--e Room 819 at I.DEQ, 602 North Fifth Street, Baton Rouge, LA 70802 (Point of
Contact:
Jessica Walker, 225-219-3835 (w),:225-571-3719 {m))
Tu~day, No.embei* 19, 2019 3:00pm 4:15pm LDEQ Controller Briefing, Courtyard M.mriott, 2 Galleria Blvd., Metairie, LA (Point of Contact Jessica Walker, 225-571-3719 (w), 225-571-3719' {m))
FE:MA fa'alootor Meeting, Courtyard 1'.,furriott, 2 Galleria Blvd.,.Ivfutrurie, LA Q>oim of
Contact:
Linda Gee, 940-898-5368 (w), 9.40-3~7-8772 (:m.))
Wedne;dar, Nonmbel' lO, 2019 6:45am
'\\Vata*forll! 3 Biennial Exe1*ci<Je, Various Locations Ihm'Sda~-. Nonmber ?I, 2019 9:00am 10:00am FE!l..fADebriefingv.>ithLDEQ, W3, andParishEOC Director.;, St. John the Baptist EOC, 1801 West Airline Highway, Laplace, LA (Point of
Contact:
TmisPemlloux, 985-652-222 (w), 985-379-6710 (m))
To"n Hall Meeting, 1801 West Airline Highway, Laplace, LA (Point of
Contact:
Travis Pemlloux, 985-652-222 (w), 985-3 79-6710 (m))
32
- unclassified
. Radiological Emergency Preparedness Program.(REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station SCENARIO NARRATIVE IV. Narrative Sumnmry
. A. Initial Conditions The scenario begins with 100% Reactor Power at the beginning of ~ore life. Plant
- Safety Index ic.; 10.0 Green. The sky is sunny with 10% chance of rain.
Protected Train:is A The AB bu.sis aligned to the A side.
Containment Spray (CS) Pump B is out of service for preventative maintenance ( oil change). The ptunp was tagged out at 0400 on November 20, 2019. The oil has been drained from the pump and the.motor. The coupling has been disassembled. the grease has been removed and the coupling has been cleaned: Mechanical Maintenance personnel are expected to con;iplete the PM by approximately 1700. November 20, 2019.
B. Sumi.nary of Events At 0805, RCPlA lower sealfoilw:e occurs. The control room receives computer point alarms Al3101, RCP lA middle SL Wtr press, Hi-Hi alarm on the PMC alann screen.
- At 0806, a large break Loss of Cool.mt Accident (LOCA) of 400 gpm is initiated releasing radioactive pritTu,ry coolant into Containment. The. Containment High Range monitors start to ramp up. The Control Room staff trips the Reactol" and.manually initiates SLI\\S and CIAS. The Containinent High. Range Monitors start to ramp up.
At 0806. HPSI Pump B does not start on SIAS caused by the LOCA The control room verifies HPSI Pu.mp A is opernting.ptQPerly and dis.patches an NAO to im,*estigate HPSI Pi.imp B locally and HPSI Plµµp. B bte*ei, The NAO discovers the breaker in the open position with fl.()lllli,1 indi~ation:c.;...Elect:ric~ repair teruushould be requested to inspect the breaker (failed aux s,-a;,-it~ f~nalc;9miection brok~)-
At 0806, the Containment Hi~ ~~-_J\\Ri\\1-mE-5490A ~
5400B radiation'inonitors
. *will start a rnmp to read> 1000 R/hr o~-er a two minute ramp.
- At 0808. the threshold for Site Area Emergency. EAL FCB5 (> 1000 Rlhr) and RCB4
(>100 RA.n-)IR.CB2 (uni.soiable RCS leak >44 gpm) will be reached The Containment High.Range Monitors will continue to gradually kcrease for the duration of the drill but will not exceed 2000 Rtlu-.
. The (Sl\\A)/ (ED) dedaires a Site Area Emergency based on Emergency Plan Implementing Procedure EP-001-001. Recognition_and Classification of Emergency Conditions,, Initiating Condition FSl, "Loss or Potential Loss of ANY h~.ro Barriern," EAL,;
FCB5 and RCB4/RCB2. There are no Protective Action Recommendatioru; (P:ARs) 33 I
I I
I I
'I I
I 1,
I I
- 1 I
I I
I I
'I I
I I
I I
I I*
I I*
!I I
I I
I I
I I
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- required at this time. There is: no offaite:radiological release at this time. RCB2 is applicable to the scenario conditions but is a Potential Loss \\;,rhere as RCB4 is a loss of the RCS Barrier.
The threshold for Alert conditions exi.,;ted at 0806 with the WCA conditions.. The SM/ED may decide to declare an Alert FAl (RCB2) prior to the Site Area Emergency declaration of FS 1 (FCB5 ~d RCB41RCB2).
The Emergency Director selects an offsite assembly area and announces a site evacuation. Based on the wind direction, tbe ED should select Momauto Park for the assembly area. The Ao;sembly Area Supervisor is dispatched and Security performs accountability in accorcfance with EP-002-190, Persollllel Accountability. Fo:rthe pmposes of this: drill a small numbe:r of pre-designated personnel will evacuate to the selected offsite assembly area. The evacuation of the Protected Area -will be simulated:
- At 0901, Component Cooling Water Pump B trips. CCWPump AB should be aligned to
. :replace CCW Pump B. 1l1e control room di'ipatches an operator to investigate CC\\V Pump B breaker and locally investigate tbe pump. The operator finds: the breaker tripped on mrercurrent and the pump bearing casing is hot to the touch and heavily discolored. 'Iltis malfunction,vill not be returned to service prior to the end of the exerctse.
At 0922, EDG B trips due to mierspeed linkage breakiµg. The control room dispatch.es an operator to investigate locally. The op_eratoir Vlijll,:fu:ui the lever attached to linkage indicating the butterll y OSBV has closed. Linkage h.Qldiug valve op~n found detached from its mounting pracket due to a sheared bolt. Both bolt and nut are 1r:isible after investigatioa At 0934, Control Room nonnal AHU B (AH-12B) trips: The "control :room receives*
annunciator, Control Room AH-12B Power Lost. J.\\JI:.. 1_2 B canttoi s\\,ritch indication i~
lost. The control room dispatclieS' an operator to imie.stigare* CR normal AHU B (AH-.
12B) locally. The operator finds the breaker tripped fuiControl'Room.nonnalAHUB and :requests PME to investigate. PN.1E finds the cqn.trol power transformer faulty. The AHU B,vill not be :returned to s:eririce prior to the end of the exercise. * *'
. 7
- At 0940, Containment Spray Puiµp A fails: a'l Containment Spray fl.o\\v deteriO(~tes to 1200 gpm. The control room recei,ies a1111unciator, Cntrut Spray HDR AFlow.Lo,alapn on panel M (F-4). The crew recognizes the reduced. fl,o~* :rate and:reporti)he.,'. :.*:. -. :,i Containment Temperature and Pressure Control Safety Function is no,longet: ~~. The control room dispatches an operator to investigate locally. The operator finds the pump making a loud banging noi~e and vibrating '\\\\rildly. Tue operator recommends the co11..trol room secure CS Pump A CSP A will not b~_retumed to service prior to tbe end of.the drill.
The SM/ED :recognizes the conditionG, for a General Emergency declaration exists 34
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station based on Emergency Plan Implementing Procedure EP-001-00 I. Recognition and Classification of Emergency Conditions. Initiating Condition FGl, Los.s of any two barriers and loss or potential loss, of the third barrier" EAL FCB5, RCB4 and CNB2.
Initial Protective Action Recommendations (PARs) of evacuation of Prntective Re5ponse Areas will be PAR Scenario 5 which includes Al, Bl, Cl. Dl (2-mile rndiu.s),
C2 (5 miles downwind) and Monitor and Prepare for the remainder of the Protective Response Areas ii1 the 10-mile EPZ are made. Them is no offsite radiological :release at this time above federal limits.
At 1022, the control room :receives anntmciator, HPSI Pump A BRt~G Vlater Flow LO panel M (C-3) alarm. The control room dispatches an operator to investigate locally and the operator observes the CCW flow to HPSI Pump A fluctuating :from 8 to.11 gpm.
CCW Outlet and To.let Isolation (CC-934A. CC-942A) valves are verified open. An OSC repair team is :requested to investigate the problem,vitb the bearing water flow. An Engineering evaluati.o:n may be performed to verify that the p1.µnp can be nm tmde:r
- current conditions.
At 1042, a failure of Penetrati.011 into. the ru111ulus* "'-ill start the radiological release. The release vvill be recognizable.via the Plant Stack WRGM and will gradually increase over a 23 minute period and \\"\\iill*stabilize for the duration of the drill The radiological :releaie
,,rill not change the current P ARs declared. The drill *will. be t:ern.ii:11ated with a release :in progress,*
~-At 1200 (El\\"'D DRILL), in the opinion of the Lead Controller, the drill objectives have been sufficiently demonstrated and conii11uing the drill will provide no additional benefit, the drill,v-ill be tenninated. This decision will be coo:rdinated with LDEQ. \\Vhen the drill is tenninated. area critiques will be c,onducted 35 I
I I
I I
I I'
I
- 1 I
I I
I I
I I
I I
I
I' I
I I
I I
I I
ii I
I I
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station V. limeline G70J Message-1 0755 080}
Message-2 0805 Message-3 0805 Messa~e-4 Message-5 Attachment HPS!
PumpB OSO!:l W.iterford 3 SES 2019.NRC Exercise No*.rember 20, 2019 Event Drill Controllers brief the Operations shift personnel jn the SimulatOi. Drill ouidelines and initial,DJflditions are discussed with the participants.
The Cootrol Room parudpants are*
instructed to start the Drill.
Dri!f continuatioo armoonoement.
RCP1A lower seal failure occurs Loss of Coola1t Accident (LOCA}
occurs
- Alert coooition met High Pressuro Safsty Injection Pump (HPSI} 8 fails to start Ri3e in Conroinment high Range Radiation Mooitor 36 Drill A~tivitv Follcr,..;ng the briefing, the NAOs and
. on shift. persoimel take the:ir pJsttioo.s in the olant.
The scenaJio begins \\1.11:h 100%
Reactor Fo>11'Br at Beginning cf.Core life. Plant Safety Index is 10.D Green.
- Th;e Pr,otected Train is A The AB bus is align~ to the A si'de.
a; Pump Bis out oi' rervice fur preventative maintenance (oil change).
t"ne pump 1,vas tagged out at 04:00 on No1J,ember 20. 2019. The oil has been drained from the pump and! the motor.
The coupling has l~een disassembled, the grease has been removed and the
- coupling !has l)een cleaned.
lV1echanical. Expected comp1etloo of the PM is approximately 1700 on 11J20/19:
Shifu Crew 'J'ill take the shift Lead Cooitrol ler \\\\/ill make.paam.
'. an*nooncement... : ' '. '
_ The cootrpl room r&eives.computer point alamis A13101, RCP 1,,,., rniddle SL Wtr press, Hi-Hi *alarm on the PMC alamri screen A large break L06s of Coolant Accident
{LOCA) is inii.iated releasing radioactive pJirnary coolant into Containment HPSI Pwnp B doss not start rn SIAS caused by the LOCA The cootrol room verifies HPSl Pump Ais operating propimy and dispatcti.es an NAO to investigate HPSI Pump B local]~* and HPSI Pump B breaker.
Contninment High ~ge ARM-JIRE-5400A and 5400B radiation m)niitors *
\\ 1,111 start to iur.rease to >1000 Rihr over a three minute period.
Unclassified
- Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station 0811 Message-6 Mes&:-ge - 7, 8, 9 Message-10 Message-10 09D1
- Waterford 3 Biennial Exercise November 20, 2019 W.iterford 3 SES*2019 NRC Exercise
- November2D, 2019.
~site Area Emergency condition met Completion of Accountability Assembly Area personnel return to plant Component Cooilng Water (CC'N)
PumpBtrips Emergency Diesel Generator (EOG) B trips 37 Toe Sr.NED deci ares a Site Area Emetfency (SAE) oose::I on EP--001-001, Recognition and Classificati:>n of Emer~cy Conditions, Initiating condition (IC) FS1 - Loss or Potential Loss cf any two oolli ers, EAL FCB5, RCB4IRCB2. There are no PAR-5 required for trus dedlaration. There is oo release.in progress.
EP-OD1-030, SAE, is implemented. The emel"g'3ncy condition is announced to station personnel.
The Onsite (TSC & OSC), Nearste (EOF) Emergency Organizations are mobilized (if net completed at Alert).
State and local government agencies, VVaterford 1 & 2 and tile NRC. are nocfied. Wmerf:>rd 1 & 2 is directed to evacuate non-essential personnel (for the purposes of this drill, e'Jacua!ion of vvaterford 1 & 2 will not occur).
For the purposes of this dnll, there v.lill not be a Protected Area evacuatfoo. A small group of predesignated persons
'.',ii I be ev acuatw to the assembl, area fo demonstrate evacuatiOn and asserrbly area actiVities.
Securtiy 14\\li II complete accountabilitY
{missing persoo's list s!imulated) and notify the Security Coorainator in the osc.
After Assembly Area m'L!Ster activities are perfom1et1, the evacuated.
personnel should be caf:ed back to the plant This obf edive >Mr have been
- completed and this portion of the Drill is also completed.
CON Pump B trips. ccw P1.1npAB should be aligneo to replace. CON Pump B. The control room dispatches an operator to investigate CON Pump B brn::ker and locally invc:istigate the pump. Toeoperatorfinds the brm!<er tripped'on overcurrent :mol the PlJlllP beartnu casing is hot to the touch and heavil~* discolored.
EOG B tlips due to overapeed lirkage brerudng. The control room disp:itches I
I I
I I
I I
I I
I I
I I
I I
I I
I I
II 1,
I
- 1.
I I
I I
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station Attachment EOO B 0934 Messa{le-14 0940 Message-15 Me;S3:Qe-16, 17 1022 Me;s:3ge-18 Attachment HPSJ Pu:npA 1042 STATE OF LOUISIANA Waterford 3 Biennial Exercise November 20, 2019 Wateriord3 SES 20151*NRC EJercise November 20, 2019 Cootrol Roon Air Handling unit 111ilPS.
AH-12 8 CS Purn p A fails
- Gensrol EmergancJ conditions met.
General Emargency d~daraiion an operator to investigate bca'Ji/. The opera:ornill find the le,er attached to linkage indic31ing me butt~rfly OSBV has c!DSed.. Linkage l'.oldirg valve open f01Jrnl c:1etacna:1 rrom alS m:iuntng bracket due to a sheared holt. Both bd.t and nut are visible after investi;latlon.
Tile control room receives am.Jnciator, Control RoomAH-128 Power Lost.
AH-1:2 B control switch indic::m:m is lost.
cs Pump 8 fails as Coota'.nment Spra*1 flowdstetiorates to 1200 rnm. Tthe cootrd room mceivos annunciator, CntmtSpra1* HDRARowlo alrumon panel M (F-4 ). The crew recogn12cs tte reducedl flow rate and reports the Containment Temperature and PressiJre Control Safely Function is no longer inet.
Tile Bnergency C:re-ctQT dacla-es a General B'nergenC'y l)ased on.EP-OG1-00*1, R~.o;;nitfon and Cla~ficiition of Emeroenw Condi1ioos. lniiiaHna O)nditioo FG1, "Loss of any two barriers arid lose or potential los.s of the tlirci !nrnier" EAL FCB5. RCB4 and CNB2 Scenario 5 for initial Protective Actbn Recommenda'Jon of erncuation of Protective Respoose Areas A1. 81, Cl, D1 (2-rnile radius), C2{5 miles do,wt\\vind) :mi.'I Monitcr and Prepare to:-the remairn!er of the Protective Response.D..raas In tne 1 o-m11e EPZ ara made. Th.ere is no offsite ra:iiologiC31 release at this time. abo'.re fe:!eral iirrite;.
HPSI Pump A BRNG Water Flow low O)ntrol Room recewes annunoiatO."",
HPSi Pump ABRNG Water fl1J1.11 LO panel M (C-3} alann. The control room dispatches an ope."ator to im'estigilte locall\\' and the operator obser.*es the CfJ/V flow to HPSI Pump A iluctua1ing from 1lto 11 gpm.
Penstra:1onram.me-start or raa1D1og1cat Failure or Penetra:icm Into the annuius rel ease to start the radiolo!Jical release. Tha release wm ramp over a 23 minl;lte peliocl 38
After Action Report/Improvement Plan
-1200 Message-19, 20 Unclassified Radiological Emergency Preparedness Program (REP)
Waterford 3* Steam Electric Station Waterford 3 SES 2019 NRC Exercise November 20, 2019 Temiination of drill 39 V\\lhen in the opinioo of the Lead Controller, the dlrill obJectives have i>eensufficier.tlly demaistra.ted, the drill "MIi b:! temiinated:
I I
I I
I I
I I
I I
I I
"I
- 1.
1*
I I,,
I*
I I
I I
I I
- 1.
I I
Unclassified Radiological Emergency Preparedness Program (REP)
- After Action Report/Improvement Plan Waterford 3 Steam Electric Station WATERFORD 3 STEAM ELECTRIC STATION 2019 MEDICAL DRILL (MS-1)
Revision 4 October 17, 2019 Evaluated Organizations OCHSNER CLINIC FOUNDATION ST CHARLES PARISH AMBULANCE SERVICE 40
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station II.
EX:JENT OF PLAY A. ASSESSMENT AREA 1: EMERGENCY OPERATIONS MANAGEMENT Sub-Bement 1.e - Equipment al'lld Supplies to Support Operations Criterion 1.,e.1: Equipment, maps, displays, ctlosirneby, potassium iodide {Kl) and other supplies are sufficient to support emergency operations. {NUREG-0654/FEMA-REP-1, H.7, 10; 1.7, 8, 9; J.10.a, b, e; J.11, 12; K.3.a; K5.b)
- 1. Locations Oclhsneir Medical Center and St Clharles Parish Ambulance
- 2. Extent of Play ponectron on the soot, at tile discretion of and concurrence behveen llie evaluator and the controller, may be acceptable at ihese locations. Caution should be exercised to insure 11hat,exercise p~ay is not interrupted.
- 3. Level 2 Findings - None B. ASSESSMENT AREA 3: PROTECTIVEACTION IMPILEMENTATJON Sub-Element 3.a - lmptemenmtio111 of Em,ergency Wolf1ker Exposure Control.
Criterion J.a.1: OROs issue appropriate dosime'b)I and procedures, and manage radliologmcal exposure to emergency workers [n aocordance with the plans and [Procedures: Emergenci/ *1.r.rorkers periodically and at the erid of each*
mission read their dos[meters and record the readings on the appropriate exposure record or chart. (NUREG-0654/FEMA-REP-1, J.10.e; K.3.a, b; K.4}
- 1. Locations OclhsnerMedlcal Center ailld st Cli1ai11es Parish-Ambulance
- 2. _ Extent of Play
- a. Area <ilosirnetr_i may be used aftt1e hosp1ta1.
- b. Correction on the spot, at the discretio111 of and concmrance bel'iNeen the evaluator and the controlfer, may be acceptable at these locations.
41 I
I I
I I
I I
I I
,1
,I I
I I
I, I
I I
I
I
.I I
I I
I
- 1.
I I
I I
I I
I I
I, I,
I I
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station Caution should b*e exercised to insure Ulat exerc:ise play ms 111ot in term pted.
- 3. Level 2 Findings - None C. ASSESSMENT AREA 6: SUPPORT OPERA HONStFACllmES SILib-H-ement 6.d-Trans1Portation and Tr,eatment of Contaminated injured Individuals Critermon 6.d.1: Th,e facili1ylORO has the appmplliate spaoe,. adequate resources and trained p,eirsornnel to provide transport, monitmirng, decontarn~nation and medical s:en,ices to contaminated injured individuals.
(NUREG-0654lFEr.. 1A-REP-1, F.2; H.10; K.5.a, b; L 1, 4)
- 1. Locatfons Oclhs ner Medical Center and st Clh arJes Parish Arnibu Ian ce
- 2. Extent of P~ay
- a. Attachment C -Aerromedmcal Transportation of a Radioactwely.
Contaminate.d. Patient 01f Radiation*Accident Plan wm remairn in place since this pro,oodurr,e is applicable _to th~ patient transportation from
- utilih< Hml\\1°everr, Louisiana Peacetime Radi,o!ogical Response Plan does not indud,e th,e use of Ochsner FHght Carre and it wm not be
- demonstrated.
- b. All smg.icar proc,edures, X-rays, blood samples, stam.ng oUV's, etc.,
will be simulated.
- c. Ambulance travel times will be simiu'1at,ed.
- d. Ambulance,,,m. be pr,e-staged at a Ochsner M,edica~ Center vjil.ere simulated contaminated patiient loading 1.vm be demonstrated..
- e. Tine lead contrroU,er h1itiates th,e drm iby contacting the Ochsner Medical Center and rr,eporting a contarn~nated ~njured member of the pubUc being transported to tne Hospital from the sirnu~ate*,dl location of the injury.
L The simulated,estimated time of arrival (ETA) Vi/ill anov, the hosp~ltal to completely mo!bilize.
ii. Tille Hospital v.111 b,e oorntacted immediateW before Ulie ambulance in order to ~111crease ihe preparation ~me availa!ble.
42
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Steam Electric Station
- f.
Immediately after contacting Ochs111er Medical Center, the lead controller contacts the St Charles Ambulance Service and reports a contaminated injured member oUhe public at a sumulated accident location.
- i.
The accident site v/here the in]ury occurred wm be simulated. The arnlbula111ce wiifl be parl<ed lb}' the emergency mom for Ochsner and the moulage 1Niil be completed while simulating amva~ time..
ii.
Evaluation of loading and transport of sirnuEated contaminated patient wm be conducted iby interview whife simulating arrival time.
- m. _
If for some reason, ffle EMS unit is called into se1Vice in r,esponse to an actual event, file patient transportation wm take place using an alternate velll icie..
- iv. Information provided by th,e ambulance crew duifling transportation pfihe patient will be provided by cue cards.
g_ Aft~r approximately 30 minutes: the ambulance v,1H-amve at th,e hospital entrance '?litlh the packaged patient. The patient 1Nill be a contaminated injured member oUhe pubfic. :
lh. Correciiion on the spot, at the d~scretron o1f and concurrence beh'teen fftie evaluator* and the controller, may be acceptab:ie at these locations.
Caution.. should be ex,erdsed to insure that exercise play is not interrupted:
- 3. Level 2 Findings - Non,e D. GENERAL EXTENT-OF-PLAY (EOP):
- 1. Any last minute additions or changes to any previously approved !Exlent-of-Play must be forwarded to the RAC. Cha.ir for approval.
- 2. The goal of all offsite response organtzations (ORO) is to protect the health and safety of tllle public. This goaE is achieved through the
- execution of appropriate plans and prooedures. n is recognized that situations may arise that could limit ffle organizations in the exact execution of these plans a111d procedures.
- 3. In ihe event of an unanticipated siruattion, OROs are permitted to exercise flexibility i111 the Implementation oftiheir plans and procedures in order to 43 I
I I
I I
,Ii I
II 1*
I I
I I
I I
,I I
I
I
.I I
I I
I I:
I I
I I
I,
.I I
I I,
I I
I Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Waterford 3 Stearn Electric Station I.
INTRODUCT~ON In ihe interrest of asst.ming tlhe health and safety *OT the generai public near ttrie Viatelford 3 Stearn Elecmc Station, ijn 11he event of a radiotogica~ emergency,
\\i\\iatelford 3 peirfodfcaHy cond1.1ctslJrms joimt~, with Ile F,edern~. State andl Eocai agencies.
Tlhis manua~ contains th,e scenaruo of acttvmes andl supporting data describing the \\iVatelfor~ 3 Emergency Preparedness Medical Services DilliH.
n1is scenario vtas.deveroped by posh!fati111g events that wm require response by off site organizations.
D~ring this drm. Ule support.organizations viim respond to the sirnu~ated events and conditions that have be,en sel,ed,ed fo provide th~ ~ev~~ of activity necessary to meet 11he scenario objectiv,es.
Ochsner Medical Center and St'Cha1J11es Parish Amlbula111ce lNill participate in ttrims.
drill.
Drill participants wm have no prior knowt,edg,e of tile sequence of,events. Tile drill scenario wm allow* 11hose indiviiduals and agencEes assigned to respond dmi:rng; a radiologicai emerg,enqr to demonstrate theEr performance according to curre111t emergenci/ preparedness plans and procedlures.
The scenario ms a.rneclnantsm by 1.l'thich selected driH.contro~~ers v~riu inmate and evaluate the activiti:es of11he dri_H participants. The individual :driHs l.lVUI be initiatedl
- as shown below a111d each are expected to last approximate~' tht~e hours.
Participating organizations are shovm in Sectfon IV, GuidleUnes, ofthis manual.
A.
SCHEDULE
- 1.
Thursday Octoiber 17, 2019 08:00 Ochsner Medical Center 44
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Irnprovement Plan Waterford 3 Steam Electric Station Arn evac1J.Je1e ~s h1Jured in a motor velhidle accident and has be,en trans~lorted.lby relatives to ilhe Ataifiio Center. The evacuee has been stuve}'e*d by inembers of tlh e Receptio111 Cent,er staflf a111 d has been found to be contammnated. Sil: Charles Ambulance Servioe was reques1!ed to pmvlide, treatment and transp,ortation o,f a contamfnat,ed patient to tlh e Oclhsnier Medical Center for treatn1en1t.
Tlhe Drill Control Team simulates fl:rst aid.
At approxlmateb, 07:45, ilhe st Charles Ambulance Senrice ns (sEmulated}
- dispatched to the patient location.
At os.:oo. ttle Orm Comror T,earn caHs the Ochsner Medmcal Center to r,eport tile simuf:ated m,ecficalt emergency. The i111itial advlisemem to fflhe ambufance has been tlh at ttlere is an ~111jured indivliduaf ~oca'l:,ed at th,e A:lari*o Center lNl'm is radiolog~caH) corntaminated due to a radiofogEcail refease from VVaterford-3. A tu mover (from th,e controHer} of the radiotogncai status Vf~m be pro\\f ided to the arnb11.1la111ce p,ersonnel. As medfcai* treaillment and patient transport continue, contamrnmicm comrot measures slh ou~d proceed~ The ambu~ance personnel sho1J.Jld communh::ate with *oclhsneir M,edicat* Center upon their departure from tile simul!ated Allario Center which s:ho1J.Jld i111clude medEcai and radfoJogical information as weH as a111 ET A ( estimated 1 time of amvaO.
Tlhe EMTs wm provide radio updates to medicaf center staff dmiing :simulated transportatfon 01f tlhe pmient.
At approxfmatei)f 08:30, ilhe ambufance 1NH~ arriv,e at the medfcal,centeri. lhe patient,.vm be taken irnto ilhe REA= decontammnat,ed an,d treated for the simulated.
injuries. Aler the patient has been r,emoved from the REA and the pmper removal of protectiv1e dotlhing has been d,emonstrated, the me,dmcaJ driil1 wm. be terminated. A critique offfle events v~~u b,e oonduded.
- An~* requir,ed! x-rays or required sampl,es may be snmu~ated by liospitaJ persorme,J after derno111stratfng ~ovi.1edge of requirements arndl processes..
45 I
I I
I I
I I
I I
I I
.1 I
I I
.1*
I I
I
I
,I I
I I
I
- 1 I
I I
- 1 I
I I
I I
I I
I After Action Report/Improvement Plan Unclassified Radiological Emergency Preparedness Program (REP)
- This p'age is intentionally blank.