OPERATI!!G DATA REPORT DOCKET 'IO. 053-0325

. DATE 10/05/70 COMPLETED BY EULIS ?lILLIS TELEPHONE 919-457-6701 OPERATI!!G ST/.TUS

1. UtlIT NA.lEs BRUNS? LICK UtilT I I NOTES
2. REPORTIllG PERIOD: SEPTEbtBER 78 I
3. LICEilSED THERMAL P0"lER.() INT): 2436 I 4 IIAl.lEPLATE RATIllG (GROSS inlE): 867.0 I
5. UESIGil ELECTRICAL RATI:10 (flET !.l?lE): 821.0 I
6. ItAX DEPEilDABLE CAPACITY (GROSS hiME): 315.0 I
7. !!AX DEPEilDABLE CAPACITY (!!ET !NE): 790.0 - - - - - - - - - - - - - - - - - - -
d. IF CHAi!GES OCCUR Ill CAPACITY RATINGS (ITE'.tS 3 THRU 7) SIllCE LAST REPORT, GIVE REASONS:
9. POMER LEVEL TO YlHICH RESTRICTED IF AtlY (tiET MWE): No!!E
10. REAS0tlS FOR RESTRICTION IF A?!Y:

O THIS YR TO CUMUL MollTH DATc ATIVE

11. HOURS IN REPORTI.'IG PERIOD 720.0 6551.0 13483.0
12. ITUMBER OF HOURS REACTOR PlAS CRITICAL 592.8 5702.3 10154.3
13. REACTOR RESERVE SHUTDONil HOURS 0.0 0.0 1647.I 14 HOURS GENERATL9 ON LIllE 575.8 5520.I 9442.3 IS. Ui!IT RESERVC S"UTDONN HOURS 0.0 0.0 0.0
15. UROSS THERl.iAL E?iERGY GENERATED (taNH) 1249090.9 12309379.3 20220275.4
17. GROSS ELECTRICAL EMERGY GEllERATED (MWH) 412968.0 4075409.0 6697405.0 id. NET ELECTRICIAL ENERGY GENERATED (MtIH) 396073.0 3933022.0 644ddll.0 19 U: LIT SERVICE FACTOR 60.0 d4.3 70.0
20. U.III AVAILABILITY FACTOR a0.0 34.3 70.0 2I. UillT CAPACIiY FACTOR (USING ?.iDC NET) 70.0 76.0 60.5 Q2.UNITCAPACITYFACTOR(USIllGDERSET) 67.3 73.I 58.2
23. Ui!IT FORCED OUTAGE RATE 0.0 11.5 27.1 24 SHUiDOM'Is SCHELULED OVER tiEXT 6 'JorJTHS (TYPE, DATE, AND DU'? ATION OF EACH) l
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTI1tATED DATE OF STADT UP: 10/ 1/78 26..U; LITS I:I TEST STATUS (PRIOR TO CottMERICIAL OPERATION): FORCAST ACHEIVED I?IITIAL CRITICALITY INITIAL ELECTRICITY - - - - - - - - - - - -

CO..tMERICI AL OPER ATIC'r - - - - - - - - - - - -

i.16 - 9 LPbrc 72 tat 30/M PM nm er os a - s>n n rgioio P0fC A0001< OS'o - 3 W g 7sto to

o .- . .- . .

I ,' .

APPEllDIX B AVERAGE DAILY POPfER LEVEL DOCKET NO. 050-0325 UNIT 99U;1SPfICK UtrIT 1 DATE 10/05/78 COMPLETED BY EULIS '1ILLIS TELEPHONE 919-457-6701

. SEPTEMBER 78 DAY AVG. DAILY POPIER LEVEL DAY AVG. DAILY POP!ER LEVEL

( MPIE-NET) (MPIE-i!ET)

I 773. 17 423.

2 762. 18 586.

3 777. 19 604 Q4 779. -

20 770.

5 778. 21 776.

o 779. 22 764.

7 779 23 761.

I o 743. 24 663.

9 408. 25 O. -

10 607. 26 0.

ll 656. 27 0.

775. 28 Q 12 0.

I3 778. 29 0.

14 700. 30 0.

l 15 743.

16 375. .

1.16 - d ,

o o >

DOCKET NO. 050-0325 UNIT SHUTDOWNS ND POWER REDUCTIONS UNIT NAME Brunswick No.-1 DATE October 1978

' SEPTEMBER 1978 COMPLETED BY Fulis A. Willig REPORT MONTH ,

. . TELEPHONE (919) 457-6701 e -

E f

' jE 3 jy5

  • Licensee Eg g4 Cause & CurrectIve l

No. Date f;-

6-E 3:g 4

d

.s s &

ji18 e g Event Report a 3,1J mO u

Q o

Action to -

Prevent Recurrence 1

6 029 780908 F 23.5 A 1 N/A IIC HTEXCH Forced Partial - Power was reduced to remove "B" South waterbox froin service.

'Ihis was 'necessary to clean the con- -

. denser, locate leaks, and make repairs.

Approximately two 55-gallon drums of debris were removed from the waterbox.

, Several tubes were fdund to be protrud-ing through the tube sheet. These tybes were rerolled and the Condenser "B" South returned to service. . There was a continuing leak in the "B" South Condenser; it will be repaired as system load permits. In 1979, we intend to install

  • circulating water

. debris filters to help prevent conden-ser plugging. In addition, a tube cleaning system will be installed to improve condenser performance. 'Nelve I 2 3 . 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A 1:quipment Failure (Explain) 1-Manual .

for Preparation of Data n.Maiutenance or Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event ReporI (LER) File (NUREG-

. D Regulatory Restriellon ..

4 Other (Emplain) -

0161)

E-Operator Training & License Examination 5

F Adminimitative f G-Operational Enor (Explain) ,e Exhibit I-Same Source

___m2714L__ _ ___ __ _ __ _ II Osher GExTlainD

,O.

,Q yyn

\L) U -

DOCKET NO.

050-0325 UNIT SHUTDOWNS kND POWER REDUCTIONS Brunswick No. 1

. UNIT NAME DATE October 1978 COMPLETED BY Eulis A. Willis REPORT MONTil SEPTEMBER 1978

- . . TEL.

. _ __EPilONE (919) 457-6701

,' 3

.! E 3 hE'k ~ Licensee Eg k g Cause & Corrective No. Dale h F

3g fE d 4 .3 s 5 ji ;F, i-g

.e Event Report a g'!

mO Q

o

. u . . .- . . . . . . . . ..

Action to -

Prevent Recurrence 6

029 O&M budget items have been submitted (Cont] nued) ,

for 1979 to improve circulating water system psrformance. -

a

~

I 2 3 .

4 -

F: Forced Reason: Method: Exhibit G . Instructions S: Scheduled A li uipment t Failure (Explain) 1. Manual .

for Preparation of Daia B Maintenance or Test 2-Manual Scram. Enity Shecis for Licensee -

C. Refueling 3 Automatic Scram. Esent Report (LER) File (NUREG.

. D Regulatory Resirieilun .. 4.Other (Explain) -

0161)

E-Operator Training & License Examination ,

F Administrative e 5 G Operational finor (limplain) . ,e Exidbit I-Same Source

_ _1**/_77) _ li-Other (Ex7 tain)

O O e

UNIT SHUTDOWNS 1ND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick No. 1 DATE October 1978 l

  • COMPLETED 8Y Enlis A. Willin REPORTMONTH SEPTEMBER 1978 TELEPHONE (919) 457-6701 .

- E e

' .! E 3 y .E' }

  • Licensee gg *% Cause & Currective No. Date k 6-3?

3=

4 al!

2 s a:

j gfi g Event Report a p

in u } Action to -

Prevent Recurrence d

030 780910 F 12.6 A 1 N/A

  • HC HTEXCH Forced Partial - Power was decreased

. 'to remove "B" South waterbox from service. 'Ihis was necessary to locate' leaks and repair leaking tubes and tube sheet. Five timbes were plugged and the' condenser'was returned to

  • service with a leak remaining. The condenser will be taken out of service i

and repairs will be made as system load will permit. In 10. , we. intend to install circulating wai.er debris filters to help prevent condenser plugging. In add,ition, a tube clean-ing system will be installed to improve condenser performance. Twelve O&M budget items have been submitted for

, 1979 to improve circulating water system performance.

I 2 3 . . 4 -

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A 1:quipment Failure (Explain) 1-Manual .

for Preparallon of Dasa ll4taintenance of Test 2 Manual Scram. Entry Shecis for Licensee C-Refueling 3-Automatic Scram. Event Repost (LER) File (NUREG.

D Regulatory Restriction -. 4 Other(Emplain) -

0161)

E-Operator Training & Ucense Examination F AJministrative i 5 G-Operational Essur (limplain) '

e Exhibit I .Same Source P8/77) Il Osher(Ex7 1ain) , ,

y .

O O DOCKET NO.

050-0325 f UNIT SHUTDOWNS ND POWER REDUCTIONS Brunswick No.-1 UNIT NAME DATE October 1978 f

~ COMPLETED BY Eu1is A. Wi]Ils REPORT MONTH SEPTEMBER 1978 TELEPHONE (919) 457-6701 hIf

.{ E 3

  • Licensee Eg *L Cause & Corrective No. Daic ( 3 j:g 4 2 g oc Event glj EO ^"""'"'

H elf j;gg Report at mO g Prevent Recurrence c5 031 -

780915 S 80.5 A 1 N/A HC HTkXCH Forced Part'ial

- Reduced reactor power to remove "B" South waterbox from service ind perform tube leak checks.-

In 1979 we intend to install circulat-ing water debris filters to help pre-vent condenser plugging. In addition.

. a tube cleaning system will be instal-led to improve condenser performance.

'Nelve O&M budget, items' have been sub-mitted for 1979 to improve circulating water system performance.

t I 2 3 . 4 -

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-ti nipment i Failure (Explain) 1-Manual for Preparation of Data 11 Maintenance of Test 2-Manual Scr.am. Enity Sheets for Licensee C Refueling 3 Automatic Scram. Evens Report (LER) File (NUREG-D. Regulatory Restriction .. 4-Other (Explain) -

0161) li-Operator Training & Ucense Examinathm F-Adminisitailve , 5 G Operational linur (lixplain) ,

~e Exhibit I-Same Source P8/77) li-Other (Explain)

p ,

c 9 9

UNIT SHUTDOWNS ND POWER REDUCTIONS DOCKET NO. 050-0325

- UNIT NAME Brimnwick No. I DATE October 1978

~ COMPLETED BY Eulis A. Willis REPORT MONTH SEPTEMBER 1978 TEl.EPHONE (919) 457-6701

~ -

-._ E .

- jE 3 jI} ~ Licensee gg  % Cause & Corrective No. Date ( 3= 2 5 a: Event Action to '

t-3=

4 ch j;5g 6

Report 8 ign

[} Prevent Recurrence 032 780924 S 146.8 D 1 N/A ZZ SUPORT To inspect snubbers located in the

'drywell as required by Technical Specifiedtions. Inspected and *

. repaired'anubbers as necessary. An improved snubber test machine has been ordered which will reduce the

  • time required for snubber tests. Also, procedural changes are being implement-ed which will put JSEP more in line with NRC requirements. Recirculation pump seals were replaced, safety relief valve setpoints were changed, and the reactor recirculation pump riser safe ends were inspected. ,

i I 2 3 . 4 -

F: Forced Reason: Method: Exhibit G-Instructions '

S: Scheduled A 14 uipment Failure (Explain) 1. Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling .

D Regulatory Restriction ...

4 Other (Explain) -

0161)

II Operator Training & License Exandnation F Administrative / 5 G-Operallonal lieror (limplain) ,,e Exhibit I 5,ame Source rWlililn ifLMtDm{0m!Wnn

DOCKET NO. 050-0325

,e IJNIT Brunswick No.1 DATEOctob&r 6,1978 COMPLETED BY Eulis A. Willis BRUNSWICK NO. 1 ,

Brunswick Unit No. 1 operated at a 70% capacity factor for the month of September with three major power reductions and one outage:

September 8: Power was reduced for 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> and 30 minutes to remove "B" South waterbox fr6m service. This was necessary to clean the condenser, locate leaks and make repairs.

September 10: Power was reduced for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and 35 minutes to clean the condenser, locate leaks and make repairs.

b)

September 15: The same problem as in the two previous power reductions occurred again, with a duration of 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> and 30 minutes.

v

?

September 24: The unit was separated from the grid to inspect snubbers located in the drywell which is a tech. spec. requirement.

I' This outage lasted the duration of the month.

The monthly availability factor was 80%. Estimated date of start up is 10-1-78.

s s

j i

G i

~

3 5 u

. OPERATIrlG DATA REPORT DOCKET fiO. 050-0324 DATE 10/05/73 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-67')1 OPERATING STATUS

1. UNIT NAME: BRUtiSWICK UtlIT 2 I NOTES 1
2. REPORTING PERIOD: SEPTEMBER 78 I 1
3. LICENSED THERMAL POWER (MWT): 2436 I 1
4. flAMEPLATE RATING (GROSS MWE): 867.0 I 1
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I 1
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 - - - - - - - - - - - - - - - - -
d. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (tfET MME): NONE
10. REASONS FOR RESTRICTION IF ANY:

O THIS YR TO CUMUL MONTH DATE ATIVE II. HOURS IN REPORTING PERIOD 720.0 6551.0 25512.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 331.7 5302.I 17269.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON LINE 297.0 5025.5 16132.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) ..i; 488.4 10441215.6 28162925.3
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) .:40151.0 3514202.0 9363212.0 id. IlET ELECTRICIAL ENERGY GEtlERATED (MWH) 201323.0 3388441.0 8982227.0 19 U; LIT SERVICE FACTOR 41.2 76.7 63.2
20. UlIf AVAILABILITY FACTOR 41.2 76.7 63.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 36.4 65.5 44.6

^12. UNIT CAPACITY FACIDR (USING DER NET) 35.1 63.0 42.9 N3.UtlITFORCEDOUTAGERATE .

0.0 3.4 15.7 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

25. IF SHUTOOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ 0/ 0 26.. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED I:lITIAL CRITICALITY - - - - - -----

I!!ITIAL ELECTRICITY - --- - - - -

CO!.!MERICIAL OPERATION - - - - - - - - - - -

!.16 - 9 l

l l

)  : .

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSMICK UrlIT 2 DATE 10/05/7o COMPLETED BY EULIS WILLIS TELEPHONE 919-457-6701 SEPTEMBER 78 UAY AVO. DAILY POWER LEVEL DAf AVG. DAILY POWER LEVEL i

(MME-NET) (MWE-NET)

. 1 725. 17 0.

2 724 la 0.

3 671. 19 0.

Q4 730. 20 0.

5 726. 21 0.

! 6 616 22 0.

7 0, 23 0 6 Q. 24 125.

9 0. 25 634 10 0. 25 707.

11 0. 27 766.

I2 0. '28 783.

13 0. 29 786.

14 0. 30 791.

15 O.

16 0.

i.16 - 8

/ .: .

c -

Go, -

UNIT SHUTDOWNS ND POWER REDUCTIONS DOCKET NO. 050-0324

- UNITNAME Brunswick No. 2 DATE October 1978

  • COMPLETED BY Eulis A. Willis REPORT MON 111 SEPTEMBER 1978 TELEPHONE (919) 457-6701 .
  • ~ -

. . = ~

jE 3 hyk

  • Licensee Eg gart, Cause & Currective W. Daie ( 5g .3 s & Event p a- Action to '

4

[}

H

$:E 2 j;gg Repent at mL* Prevent Recurrence 6

029 - 780906 S 423.0 A 2 N/A '

Hd HTkfCH Separated from grid and manually scrammed the reactor because of high condensate conductivity. The high conductivity in the condensate system was caused by the following: approxi-mately nine extraction line expansion Joints inside the condenser failed.

h is failure caused the 1/4" steel penthouse around t,hese expansion joints to deform and break apart. We metal from the penthouse fell on top of the condenser tube and caused them to start leaking. Approximately 5-6 days- i

~

of this-outage was used to inspect the Reactor Recirculation pump riser safe ends, ne failed expansion joints were replaced and an' investigation initiated to determine the cause of the failures.

l l.

I 2 3 .

. . 4 -

l F: Forced Reason: Method: Exhibit G . Instructions S: Scheduled A-Fquipment Failure (Explain) 1-Manual for Preparation of Data ll Maintenance of Test 2-Manual Scrarn. Entry Shecis for Licensee C Refochng

. D Regulatory Restriellon .. 4-Othcr (Explain) -

0161) l E-Operaint Training & Ucense Examination F-Administrative e 5 -

G-Operational tis sor (limplain) ,e Exhibit I-Same Source

(*8/17) Il-Osher (Explain) ,

(

o o .

DOCKET NO.

050-0324 UNIT SHUTDOWNS ND POWER REDUCTIONS UNITNAME _ Brunswick No. 2 DATE October 1978

  • COMPLETED BY Eul1s A. W111is REPORT MONTH SEPTEMBER 1978 TELEPHONE (919) 457-6701 .

52 3 h .N' k

  • Licensee [v, k g Cause & Curreceive

(

No. Dale f

3g 4 d

2s5 j di g Event Report a g1r m0 Q g

Action to -

Prevent Recurrence 5

029 Site personnel are obtaining vibration' (Conti rtued) . ' data for analysis by Raleigh personnel and NCSU'Hechanical Engineering persorf-

. nel. It'is believed that this will result in recommendhtions for improved bellows' materials or installation

. techniques which wili result in greater reliability.. Samples of the old joints are undergoing laljoratory cualysis.

I 2 3 . . 4 -

F: Forced Reason: Method: Exhible G-Instructions S: Scheduled A Figuipn.ent Failure (Explain) 1. Manual for Prepara lon of Data

~

H. Maintenance of Tes 2. Manual Scram. Entry Sheets for Licensee C-Refueling .

  • 3-Automatic Scram. Event Report (LER) File (NUREG-

. D Regulatory Restriellon ..

4-Other (Explain) -

0161)

II Operator Trainieg a License Examinailun F-Admiulstrative f 5 G-Operatiimal Ersur (limplain) e Exhibit I Same Source Ga8J7DD II OtherGEurplainD ,

l 1

~

DOCKET NO. 050-0324 UNIT Brunswick No. 2  !

' f'~

DATE Octo6er 6,1978 COMP 5ETED BY Eulis A. Willis BRUNSWICK NO. 2 Brunswick Unit No. 2 was available 41.2% of the time for the month of September with one major outage affecting the unit performance. On September 6th, the unit was separated from the grid because of high condensate conductivity. The conductivity was caused by some failed expansion joints inside the condenser which caused some condenser tube leaks. The outage was extended approximately six days to inspect the reactor recirculation pump nozzles.-

Total outage time was 423 hours0.0049 days <br />0.118 hours <br />6.994048e-4 weeks <br />1.609515e-4 months <br />.

O.. '

Monthly capacity factor was 36.4%.' For further explanation of outages and power reductions, see the Unit Shutdown and Power Reductions Log for the month of September.

~