Text

q October 16,'1990

}>,

Docket No; 50-416' j

Mr. William T. Cottle Vice President. Operations GGNS Entergy Operations, Inc.

Post Office Box 756 Port Gibson, Mississippi 39150

Dear Mr. Cottle:

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - INSERVICE INSPECTION RELIEF REQUEST NO. 1 00010, REVISION 3REGARDINGPIPINGWELDS(TACNO.77071)

By-letter dated June 28, 1990, EntergyOperations,Inc.(thelicensee) requested relief from certain Section XI ASME Code requirements in the Inservice Inspection Program.for the Grand Gulf Nuclear Station, Unit 1.

The NRC staff has evaluated the information provided by the licensee in support of the relief requests.

Enclosed is the staff's related Safety Evaluation.

The staff concludes from its evaluation of the licensee's submittal that the examination requirements identified therein are impractical to perform at the Grand Gulf Nuclear-Station, Unit 1.

We further conclude that for the components for which relief was requested, the proposed alternativeiexaminations identified in this Safety Evaluation give reasonable assurance of the piping and component and component su) port structural integrity. Pursuant to pressure boundary (6)(i), the-staff1as determined that the granting of the relief 10 CFR 50.55a(g) requested is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest. The staff _has given due consideration to the burden upon the licensee that could

result if the requirements were imposed on the facility. Accordingly, rel Hf is granted for Relief Request No. I-00010, Revision 3.

The relief grantee is

conditioned on the proposed alternative examinations.

Sincerely,

)mL

)

t Theodore R. Quay, Acting Director Project Directorate !Y-1 Division of Reactor Projects - III, IV, V and Special Projects a.JJ Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION As stated cDocket:Fj]e T. Quay M. Virgilio 13E4 PD4 1 Reading File NRC PDR L. Berry L. Kintner PD4 1 Plant File cc w/ enclosure: OGC 15B18 J. Partlow 12G18 E. Jordan MNBB3701 See next_page ACRS (10) MSP-315 R. Borchardt 17G21 D. Crutchfield 13E4

  • See previous Concurrence OFC
PD4-1/LA*
PD4 1/PM*
060*
PD4 1/D

...-.:..-------------.:-----.--------:-.------......:...--4)l-----:...-------...:----------..-

NAME

LBerry
LKintner:1h
MYoung
TQuay

.-...--.......--.......:...----..---.:.........--..:b/6/90 DATE

09/21/90
09/26/90
10/04/90 OFFICIAL RFCORD COPY nocument Name:

GG INSPECTION TAC 77071 9010190191 901016 PDR ADOCK 05000416 P

PDC Q

  1. gstiot

/

o,.

UNITED STATES E#

' i-NUCLE AR REGULATORY COMMISSION j

of wAssiNoTow,o c ror.bs y%.....j October 16, 1990 Docket No. 50-416 Mr. W1111am'T. Cottle Vice President, Operations GGNS Entergy W rations, Inc.

Post 0 N Sox 756 Port G W.c Mississippi 39150

Dear Mr. Cottle:

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - INSERVICE INSPECTION REllEF REQUEST NO. 1-00010 REVISION 3 REGARDING PIPING WELDS (TAC NO. 77071)

By letter dated June 28, 1990, EntergyOperations,Inc.(thelicensee) requested relief from certain Section XI ASME Code requirements in the Inservice Inspection Program for the Grand Gulf Nuclear Station, Unit 1.

The NRC staff has evaluated the information provided by the licensee in support' of the relief requests. Enclosed is the staff's related Safety Evaluation.

The staff concludes from its evaluation of the licensee's submittal that the

. examination requirements identified therein are impractical to perform at the Grand Gulf Nuclear Station Unit 1.

We further conclude that for the components for which relief was requested, the proposed alternative examinations identified in this Safety Evaluation give reasonable assurance of the piping and component pressure boundar and component support structural integrity. Pursuant to 10CFR50.55a(g)y(6)(1),thestaffhasdeterminedthatthegrantingoftherelief requested is authorized by law, will not endanger life or property or _the common defense and security, and is otherwise in the public interest. The staff has given due consideration to the burden upon the licensee that could result if the requirements were imposed on-the facility. Accordingly, relief is granted for Relief Request No. I-00010 Revision 3.

The relief granted is conditioned on the proposed alternative examinations.

Sincerely,

})W & by Theodore R. Quay, Acting Director Project Directorate IV-1 Division of Reactor Projects - 111, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page i

[b^

i Mr. W. T. Cottle Entergy Operations, Inc.

Grand Gulf Nuclear Station Cc:

Mr. Ted H. Cloninger Mr. C. R. Hutchinson Vice President, Engineering GGNS General Manager Entergy Operations Inc.

Entergy Operations, Inc.

P. O. Box 31995 P. O. Box 756 Jackson, Micsissippi 39286-1995 Port Gibson, Mississippi 39150 Mr. Robert B. McGehee The Honorable William J. Guste, Jr.

Wise, Carter, Child, & Caraway Attorney General P. O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana P. O. Box 94005 Baton Rouge, Louisiana 70804-9005 Nicholas S. Reynolds, Esquire Bishop Cook, Purcell Alton B. Cobb, M.D.

and Reynolds State Health Officer 1400 L Street, N.W. - 12th Floor State Board of Health Washington, D.C.

20005-3502 P. O. Box 1700 l

Jackson, Mississippi 39205 Mr. Jim T. LeGros i

1 Manager of Quality Assurance Office of the Governor Entergy Operations, Inc.

State of Mississippi P. O. Box 31995 Jackson, Mississippi 39201 i

Jackson, Mississippi 39286-1995 President,

)

L Mr. Jack McMillan, Director Claiborne County Board of Supervisors Division of Solid Waste Management Port Gibson, Mississippi 39150 Mississippi Department of Natural Resources Regional Administrator, Region 11 P. O. Box 10385 U.S. Nuclear Regulatory Commission Jackson, Mississippi 39209 101 Marietta St., Suite 2900 l

Mr. Michael J. Meisner

)

Director, Nuclear Licensing Mike Morre, Attorney General l

Entergy Operations, Inc.

Frank Spencer, Asst. Attorney General P. O. Box 756 State of Mississippi Port Gibson, Mississippi 39150 Post Office Box 22947 l

Jackson, Mississippi 39225 i

Mr. C. B. Hogg, Project Manager l

Bechtel Power Corporation Mr. Gerald W. Muench P. O. Box 2166 Vice President, Operations Support Houston, Texas 77252-2166 Entergy Operations, Inc.

P. O. Box 31995 Mr. H. O. Christensen Jackson, Mississippi 39286-1995 Senior Resident inspector U.S. Nuclear Regulatory Commission Mr. Donald C. Hintz, Executive Vice i

Route 2, Box 399 President & Chief Operating Officer Port Gibson, Mississippi 39150 Entergy Operations, Inc.

P. O. Box 31995 Jackson, Mississippi 39286-1995 j

!