i l:
- Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 :
402/536 4000 October 8, 1990
'LIC-90-0756 j
1 1
i U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail-Station P1-137.
Washington, DC 20555
-l
)
References:
1.
Docket No.-50-285 j
2.
Letter from NRC (P. D. Milano) to OPPD (K.- J. Morris)-~ dated l
December 22, 1988
-3.
Letter from OPPD (K.'J. Morris).to NRC (Document Control.
1 Desk) dated March 24, 1989 (LIC-89-202) 4.
Letter from NRC-(S. A..Varga) dated-April 3, 1989 (Generic l
Letter 89-04)'
1 5.
Letter from OPPD-(K. J. Morris) to NRC-(Document Control j
Desk) dated July 3,1989 (LIC-89-584) _ _
6.
Letter from NRC-(A. Bournia) to OPPD_(K.'J. Morris)' dated
]
August'17, 1989 4
7.
Letter from.0 PPD (K. J.' Morris)'to NRC (Document Control' Desk) dated 0ctober 2, 1989 (LIC-89-793)-
)
i I
Gentlemen:
i
SUBJECT:
Revision 5 of the Inservice Inspection-(ISI) Program Plan for Fort Calhoun Station (FCS)
Attached please find Omaha Public Power District's (0 PPD's); Revision 5 of the.
)
ISI Program Plan, for FCS (Attachment 2).
Revision 5' incorporates changes as transmitted in Reference 3 and 'ses guidance provided in Reference 4.
Due to
.I u
the large scale changes made, revision bars are not included in the right hand margins.
In a telephone conversation with' Mr. A. Bournia of the.NRC.on September 28, 1990, a one week extension was granted for this submittal.
-j Please note that several changes made in this program plan deviate from methodologies previously stated -in References'3, 5 and 7. 'These deviations are due to the results of further evaluations of specific' testing methodologies.
The changes submitted in this program plan either, meet the requirements of the American Society of Mechanical Engineers '(ASME)' Boiler and Pressure Vessel. Code Section XI and follow the-guldelines established in Reference 4; or, the appropriate Relief Requests have/are being submitted. Those Relief Requests-9010160352 901oosandColdShutdowmJus,tip1 cations previously submitted to and accepte l
A
/
i DR ADOCK 05o00285
'[/(h PDC as si24 frnphurnon n u opportunno -
-m i
U. S. - Nuclear Regulatory Commission
- LIC 90-0756 Page.2)
NRC are identified.in Attachment'1.. The issuance of Revision 5lof the ISI Program Plan completes OPPD's upgrade of the Inservice-Inspection / Inservice.
Testing Program.
If you should have any questions, please con't'act me.
Sincerely, h.
.~
W. G.-Gates-Division Manager Nuclear 0perations WGG/sel' Attachment c:
LeBoeuf, Lamb, Leiby & MacRae A. Bournia, NRC Project Manager.
R. D. Martin, NRC Regional Administrator, Region IV -
R. P.'Mullikin, NRC Senior Resident Inspector' l
?
k q
I i
L 1,'
Attachment _1l n
fart 1: Class'l. Class 2. and Class 3 Pressure Retainino Components No new Relief Requests-are being added to'this part of Revision 5 of the-ISI:
. Program Plan. The ISI Exce)tions of Revision 4 were previously submitted to; evaluated and accepted by t1e NRC.
m Part-2: Class:1. Class 2. and Class 3 Valve Tests l
o
-The following Relief' Requests and Cold Shutdown Justifications for valves-were l
previously submitted to, evaluated'and accepted.by the.NRC.
Code Exception Number:
Exception d
I
- E18
. Relief Request E23 Cold Shutdown Justification 4
E24' Cold Shutdown JustificationL E25 Cold Shutdown Justificationf
- Cold Shutdown Justification E27 E28 Cold Shutdown-Justification t
E29 Cold Shutdown Justification E31
-Cold Shutdown Justification.
1 E32 Reltef: Request'
]
E33 Cold' Shutdown Justification-E34 Cold Shutdown Justification E36 Cold!ShutdownLJustificationz E37-Cold Shutdown Justification E39 Cold Shutdown? Justification-i E41 Cold Shutdown Justification j
Part 3:. Class 1. Cla'ss 2 and Class 3 Pumo Tests l
l The following Relief Requests for pumps were previously. submitted to, evaluated
- {
and accepted-by the NRC:
~
l
[gdp Exception Number System Exception L
I E3 Component Cooling Water Relief Request'
- E3, *E4 Safety Injection
. Relief' Request (LPSI,HPSI,CS)
E3, E5 Chemical & Volume Control
- Relief. Request -
(Charging Pumps)
- E3, *E4 Chemical & Volume Control.
Relief Request (Boric Acid Pumps) 1
j o
e i
_ _