Text
,
7,.
. '. ;. ':. p n o 8
uq'o.
UNITED STATES
'g
-[
m g
NUCLEAR REGULATORY COMMISSION
-l WASHINoToN D. C. 20666.
\\,
,/
t FLORIDA POWER CORPORATION'
_ CITY OF ALACHUA, CITY OF BUSHNELL-CITY OF GAINESVILLE~
CITY OF KISSIMEE i
CITY OF LEESBURG l
CITY OF NEW SMYRNA BEACH'AND UTILITIES COMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA-ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEBRING UTILITIES ComISSION
'SEMIN0LE ELECTRIC COOPERATIVE, INC.
CITY OF TALLAHASSEE DOCKET'NO. 5'0-302 I
CRYSTAL RIVER UNIT 3 NUCLEAR' GENERATING PLANT
~
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 131 License No. DPR-72 t
i 1.
The Nuclear Regulatory Commission.(the Commission) has found that:
A.
The application for amendment by Florida Power Corporation, et a1.
(the licensees) dated May 10, 1990, complies with the' standards and requirement.s of the Atomic Energy Act of 1954, as amended (the-Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application. the provisions of the Act, and the rules and regulations-of the' Commission.
C.
There is reasonable assurance (i) that the activities authorized by.
this amendment can be. conducted without endangering the health and safety of the public, and-(ii)-that such activities will be conducted in compilance with the Commission's regulations; D.
The issuance of this amendment will not be inimical'to the common t
defense and security.or to the health and safety;of the public; and.
1 E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissien's regulations and all applicable requirements have-been satisfied.
9010100189 900924 PDR ADOCK 05000302
[
P PDC
'I y
..., a 1
2.
Accordingly, the license is amended by. changes to the Technical j
Specifications as. indicated in the attachment to this license amendment, 1
and paragraph 2.C.(2) of Facility Operating License No. OPR-72 is hereby j
amended to read as follows.
Technical' Specifications The Technical Specifications contained in Appendices A and B, as revised throuph Amendment-No.131, are hereby incorporated in the license.
Florida Power Corporation shall. operate the facility lin-accordance with the Technical. Specifications..
3.
This license amendment is effective es-of its date of< issuance and shall be implemented within 30 days of. issuance.1 i
FOR THE NUCLEAR LATORY COMMISSION
/
' l
\\
l H bert N Berkow, Director Project 0 ectorate.II
- Division o Reactor Projects'- I/II Office of Nuclear Reactor Regulation
Attachment:
- 1 Changes to-the Technical Specifications Date of Issuance:. September 24, 1990 i
' l 1
1 1
o i
l i
r
.b~
e
.w.-
, ~
ATTACHMENT TO LICENSE AMENDMENT NO.131 FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.
The revised pages are identified by amendment number =and' contain vertical lines indicating the area of change.
The corresponding overleaf pages_are also provided to maintain document completeness.
Remove Insert 1
3/4 8-5 3/4 8-5 3/4 8-6c 3/4 8-6c i
'h 4
+
-1 s;
?
[
k ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2.
Verifying _ the generator rapability to reject a load of_2 515 kw1without tripping.
- 3.
Simulating a loss of offsite power in conjunction with' Reactor Building high pressure 'and Reactor Building high-high pressure tests signals, and; a)
Verifying de-energization of the emergency buses and load shedding t
from the emergency busses, b)
Verifying that the. 4160 v. emergency bus tie breakers open;-
c)
Verifying the: diesel starts from ambient conditionLonithe auto-start signal, energizes the emergency busses with. permanently connected loads, energizesJ the. auto-connected :emergencyEloads through:the. load sequencer, and operates for. 2 5 minutes while its.
. generator _.is loaded with the emergency' loads.
d 4.
Verifying the diesel generator operates for. at11 east. 60 minutes while
~
loaded ~to greater than or equal:to-3100 kw but less.than 3250 kw, 5.
Verifying that the auto-connected loads;to each diesel generator for the worst case diesel generator ~ operating condition do not exceed ~3100 kw, and' 6.
' Verifying that the automatic load ~ sequence timers are OPERABLE with each I
load sequence time interval within.
10%.
t k
This. test shall be performed in MODE 3.
j CRYSTAL RIVER - UNIT 3 3/4 8-5 Amendment No. 6, 94, 79, 404,
+96,-443r 131; '
y
. 9 b
- i t
.... -.... ~.
l ELECTRICAL POWER SYSTEMS-SHUTDOWN LIMITING CONDITION FOR OPERATION-
~
,. 3.1.2 As' a minimum, the foliewing A.C. electrical power sources sna11
.t:t OPERABLE:
F One circuit between the offsite transmission networx and the a.
-ll onsite Class 1E distribution system, and=
b.
One diesel generator with:
L 1.
Day fuel tank containing_a minimum volume of. 400. gallons of fuel,
- p
't 1.
A fuel storage syste.T. certaining.a minimum' vo::;me of y
20,300 gallons ~ of fuel, and l
l 3.
A fuel transfer pumo.
I APDLICASIL*TY:
MODES 5 anc 6.
I i
.A!-*CN:
': With less than the above minimum required' A.C. electrical power-sources j OPERABLE, suspend all operations-involving CORE ALTERATIONS' or positive i reactivity changes until the minimum' required A.C; electrical power sources are restored to OPERABLE status..
d I
i.SURVEILLaN:E RECUIREMEN'S l
~..
a 4.8.1.2 Tne above required A.C, electrical. power sources shall' be
!! comonstrated OPERABLE by perfonnance of each of tne Surveillance Re-
[
quirements of 4.8.1.1.1 and 4.8.1.1.2, except requirement 4.8.1.1.2.a.5.
t
.j l
3 i
i i CRYSTAL RIVER - UNIT 3 3/4 8-6
..., m,.
. ELECTRICAL P0blER SYSTEMS:
- SURVEILLANCE REOUIREMENT (Continued)-
- 3.
Simulating a loss of offsite power in conjunction with Reactor Building.
high pressure and Reactor-Building. high-high pressure tests signals,.
and;'
a)
Verifying de-energization of-the ' mergency buses and load shedding; e
from the emergency buses, b)
Verifyingtkatthe4160.v.emergencybustie' breakers lo' pen, c). Verifying the diesel starts from ' ambient : condition on: the : auto--
start signal, energizes the emergency buses with permanently:
connected loads, -energizes the. auto-connected emergency loads through the load-sequencer, and operates for 15 minutes whilelits generator is loaded with-the' emergency loads.~
4.-
Verifying the diesel generator operatos for at least.60 minutes-while loaded to greater than or equal:to 3100 kw but less than-3250 kw,.and 5.
Verifying that the auto-connected loads to each diesel' generator for the '
worst case diesel generator, operating condition do not. exceed 3100 kw.
l This; test shall be performed in M00E'3.
o k
l n
i
- \\
CRYSTAL RIVER - UNIT 3 3/4-8-6c.
Amendment No. 403,,131
.- A