R GPU Nuclear Corporation Nh hf
~
+
arsi pan, N Jersey 07054 201-316-7000 TELEX 136-482 Writers Direct Dial Number.
November 11, 1993 C000-93-2259-C311-93-2154 f
U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit No. 1 (TMI-1)
Docket No. 50-289 Operating License No. OPR-50 Long Range Planning Program (LRPP)
Semi-Annual Update of Integrated Schedule -
"ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN)
Corporation hereby submits the required semi-annual update.of projects listed in each category (A, B, and C) as-defined:by the LRPP integrated schedule. The' attachments to this letter include:.1) the'ABC project listing; and, 2) a summary of changes since the last submittal forwarded by:
GPUN Letter No. C311-93-2053, dated May 7, 1993.
An abstract of the attachments follows:
1.
' Attachment A - A new project listing of Category A, B, and C-projects annotated by an asterisk (*) to identify new projects and by a double-asterisk (**) to ident.ify changes in Budget Authorization (B/A) number assignments.
Completed projects have:
been removed, from the schedule. listing. _ Remaining projects are ongoing or. are ' scheduled consistent with cycle / year commi_tments.
Any changes in schedule.are reflected on Attachmentsf A and B.
.180r163 OL 9311190207 931111
$f d
_PDR ADOCK'05000289 ljd >
l P
PDR g
)
GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation
..e
C000-93-2259 C311-93-2154 Page 2 2.
Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate. The listing also contains Category C project completions. Changes-to.the Category C scope or schedule do not impact the Category A and B schedules, Pursuant to the LRPP for TMI-1, GPU Nuclear will assume that the NRC is in-agreement with the above Category A and B changes, unless we are notified otherwise within 15 days of receipt.
Sincerely,
/
. L. Long Vice President a Director 1
Services & TMI-2 Divisions GMG/plp
-l cc:
Administrator,' Region 1 THI-1 Senior Project Manager
-TMI. Senior Resident Inspector 1
Y M
-1 1v'-
a n'.+14 6
- a Le 3
a.c
>n4 in-g e
2 Y'
ATTACHMENT A TM1-1 PROJECT LISTING INTEGRATED SCHEDULE SEMI-ANNUAL UPDATE (N0VEMBER, 1993) i
- l 1
-l l
^
L o
j_.
4, m
t-r e
TM i - 1 PROJECT L.4 S T I N G' i.
o n
LECEND.
'l
^
NRC i NTEGRATED SCHEDULE NEW PROJECTS
- . BA NUMBER CHANGE 7
CATECORY 'A? PROJECTS t
j,
--SCRT_BY CATEGORY / CYCLE /BA STATUS AS OF OtsNOy93 6
q.
i
'OBS:
BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS t
i 4
l 1 ~126236
' REVISED 10CFR20' IMPLEMENTATION 92/93 NRR i
i IMPLEMENT REVISION TO 10CFR20 STANDARDS
?
FOR PROTECTION AGAINST RADIATION BY MODI i
)
FYlNG SOFTWARE, PROCEDURES & TRAINING l
i I
t.
j
..I t
s I
g i
l t
e 9
i h
1 i
.s.
V l
1 5
f.._.,.._
..,.,_,,,..,.,,,,t,.
,.,,m.,a
.,4..
.,%m
T.M i - 1 PROJECT L.4 S T I NG LEGEND NRC I NTEGRATED SCHEDULE NEW PROJECTS
- '- BA NUMBER CHANGE CATEGORY
'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 085 BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
. r 2' 123321
-REACTOR BLDG TENDON SURVEILLANCE PROG 10 NRR 4
PROVIDES FOR VENDOR SERVICES AND PLANT SUPPOttT FOR NEXT TENDON SURVEILLANCE REF. NUREG 1351; TS 4.4.2.1 3 123328 OTSG TUBE PLUGGING 11R NRR RB.
REF. TS.4.19 4 12694G.
OTSG EDDY CURRENT TESTING 11R NRR
.RB ECT OF SAMPLE INSPECTION GROUP, 3% PER OTSG TECH SPEC INSPECTION REF. TS 4.19 5 12694H TMI INSERVICE INSPECTION 11R NRR ALL ASME SECTION XI INSPECTIONS; AUGMENTED-j ISI TO-COMPLY WITH 10CFR50.55A 6 128 ADS EROSION \\CORROS PROGRAM FOR TMt 11R NRR ALL.
AUGMENTED INSPECTIONS TO DETECT EROS 10N/ CORROSION / DEGRADATION OF SYSTEMS REF GL 89-08 7 123ABC OTSG TUBE.. PLUGGING 12R NRR PLUG OTSG TUBES AS.NECESSARY.. PLAN IN-CLUDES NEW PLUGS AND REPLACEMENT OF EX-ISTING PLUGS. REF. TS 4.19 8 123334 ILRT.
12R NRR INTEGRATED REACTOR BUILDING LEAK RATE TEST.
i
~%..
4
.A-'
c
.<w,*
=.
=
w 4P '.
~
-- r
TM i-1 PROJECT L-I S T-4 N' G LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS.
- BA NUMBER CHANGE CATEGORY
'B' PROJECTS SORT-BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS. BA DESCRIPTION CYCLE /
CLASSIFICATION
. NUMBER YEARS 9 126968 ISI'lNSPECTIONS (12R) 12R NRR ASME SECT XI INSPECTIONS; AUGMENTED ISI TO GCMPLY WITH 10CFR50.55A 10 '126960 OTSG' EDDY CURRENT TESTING 12R.
NRR ECT OF SAMPLE INSPECTION GROUP.
3%
PER OTSG PER T.S 4.19 11~.128 ADS EROSION / CORROSION INSPECTION 12R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /
CORROSION DEGRADATION OF SINGLE AND TWO PHASE' SYSTEMS..REF.. GL 89-08 12 12809T-
-SQUG USERS GROUP' PROGRAM 88-93 NRR SEISMIC QUALIFICATION UTILITY GROUP PARTICIPATION REF. USI-A46 ; GL'87-10 13 128152
-MOV PROGRAM 90-94 NRR DEVELOP & lHPLEMENT MOV PROGRAM TO MEET GL 89-10.
REF. MEMO C311-90-3132,C311-89-2117
[
14 412617 TMI iPE EXTERNAL EVENTS.
92 94 NRR PERFORM THE IPE ANALYSIS FOR EXTERNAL EVENTS - REF: LETTER NO. C311-91-2150 &
. LAI 91-9238, 9239.
15 419255.
S IMULATOR MOD I F I CAT IONS - TM I (1993) 93 NRR
. UPGRADE SIMULATOR CONSISTENT WITH
' CONTROL ROOM MODIFICATIONS.
REF 10.CFR 55.45 4
f
~~
A
~ -
L
T M.1 - 1 PROJECT L l's T ING LEGEND:
NRC 1 NTEGRATED SCHEDULE
- - NEW PROJECTS.
- -BA NUMBER CHANGE a
CATEGORY
'B' PROJ :GTS 1
SORT BY. CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS BA
. DESCRIPTION CYCLE /
CLASSIFICATION-NUMBER
. YEARS e
A
- 16. 41994H SIMULATOR. MODIFICATIONS - TMl (1994) 94 NRR UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOM MODIFICATIO G.
REF. 10 CFR 55.45 17 41995G SIMULATOR MODIFICATIONS - OUTYEARS 95-99 NRR UPGRADE SIMULATOR CONSISTENT WITH CNTRL ROOM MODS
-REF'.
J a.
b a
2- -a
=s..a.2
.a-.wu r-a u,_ _
-1s r
<w E-Y
-+, -
w e
w r,
-e
TM i - 1 PROJECT L
l' S T I NG LEGEND NRC i NTEGRATED SCHEDULE
."NEW PROJECTS
'** BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT-BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 18 225012
- PDMS ELECTRICAL MODS 10 IOE
'SIMPLlFY AND DOWNSIZE THi-2 ELECTRICAL SYSTEM FOR PDMS 19 412552
- MODIFICATIONS FOR SEISMIC QUALIFICATION 10 NRR ALL MODIFICATIONS TO COMPLY WITH SEISMIC QUALIFICATIONS. SCOPE TO BE FINALIZED AFTER USB-A-46 WLKDOWNS (REF BA 128108) 20 412577 ADD'L TURB. BLDB. & INT. BLDG. PLATFORMS 10 ISH DESIGN, PROCURE, AND INSTALL PERMANENT MAINTENANCE PLATFORMS IN THE TURB. BLDG.
AND THE BWST TUNNEL 21 412605 RMS EFFLUENT QUANTIFICATION 10 REL ROUTE CABLES FROM CR READOUT PANELS AND AUXILIARY BUILDING TO THE PLANT PROCESS COMPUTER IN THE CR.
22 412612 PERM'DEMIN SYST IN PRLL W MISC WASTE EVA 10 IOE
.DECON & PREPARE CHEM CLG BLDG FOR PROBABLE INSTALL OF DEMINERALIZER TO BE USED WITH RADWASTE MISC WASTE EVAPORATOR 23 418750
' SERV BLOG ADDITION 10 FAC INSTALL FOUNDATION, SUPERSTRUCTURE, AND PERFORM TIE-INS FOR THE ADDITION TO THE NORTH SIDE OF THE SERVICE BUILDING.
24 418798L
. ROOFING REPLACEMENT'1994 10 MRC REMOVE.lF NECESSARY EXISTING ROOF &
INSTALL NEW ROOFING SYSTEM ON THE LOWER AUXILIARY BLDG.(EL 331-0)
?
l..-
. -.i -
a e
6 e
TM i - 1 PROJECT
.L1 ST I NG
' LEGEND NRC I NTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANF-E CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA.
STATUS AS OF 04NOV93 OBS-
.BA DESCRIPTION CYCLE /
CLASS 1FiCATION NUMBER YEARS 25 418807 PLANT PRESERVATION (BOP) PROGRAM 10 MRC 1994/1995 CAPITAL (NEVER BEFORE COATED)
PORTION OF THE BOP PRESERVATION PROGRAM (APPROX 17% OF_THE TOTAL PROGRAM).
26 419707 OUTAGE FABRICATION FACILITY 10 GWC DESIGN AND CONSTRUCT FACILITY TO SUPPORT FAB ACTIVITIES FOR PLANT MODS AND MAINT.
TO REPLACE EXIST DELAPIDATED SHOPS.
27.419710'
- UNIT 2 ADMIN BLDG 10 FAC COMPLETE ENGINEERING STUDY -
VENTILATION AND HVAC MODIFICATIONS 28 419727
, CONSTRUCT STORAGE FACILITY 10 GWC PROVIDE FACILITIES FOR IS TELEPHONE PERSONNEL, WASTE MANAGEMENT & OTHER DIVISIONS 29.419735 SECURITY EQUIPMENT - TMI 10 MRC REPLACE VARIOUS SECURITY EQUIPMENT 30 419737
- TM1 SECURITY ENHANCEMENTS 10 ISM AS A RESULT OF THE INTRUDER EVENT AT TMt COMPLETE VARIOUS BARRIER UPGRADES 31 419737
. COMPLETE VIDEO ENHANCEMENTS
~rve
-y
=
'm
a-- ---a.a
.i -
-TM i -.1 PROJECT
.L I STI NG LEGEND-N R C' i NTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE-CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS
'BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 32 419738
- ROOF REPLACEMENTS 10 MRC REPLACE ROOFS ON BLDG 36, WAREHOUSE'1, WAREHOUSE 3, AND.DEWEY HOUSE'.
33 419742 TMl ROADS UPGRADE 10 FAC NORTH BRIDGE PAV!NG, LIBERTY LANE UPGRADE,RESTRIPING, UNIT 2 RX HATCH IMPROVEMENT' e
34 995100.
MOBILE XFMR ON SITE STORAGE 10 GWC r
GPU SYSTEM MOBILE' GENERATOR STEP UP(GSU) i TO BE STORED AT TMI SITE. Olt SPILL CON-TAINMENT'AND ELEC WORK REQUIRED.
35' 412648
'RADWASTE' STORAGE CAPABIL PHASE 2 11 NRR PROCURE EQUIP & CONSTRUCT STORAGE i
FACILITY FOR LLRW STORAGE IEN 90-09 GL 81-38 36 418ABJ' CONTROL TOWER'4TH FLOOR REMOD 11 GWC REMODEL CONTROL TOWER FOURTH. FLOOR SCOPE _TO BE DETERMINED 37' 418750 SERVICE BLDG ADDITION 11 FAC
. SCOPE'NOT' DEFINED, $' ALLOCATED FOR 1996.
38 419728
~ RENOVATE BLOG 222 11 GWC RENOVATE BLDG EXTERIOR,REMODEL INTERIOR, REFURBISH ELECTRICAL, INSTALL CENTRAL HVAC & HOOK UP DOMESTIC WATER
~
9
.- s.
=
..=
-- A.
n e-
.~w
'T'M i PROJECT. L i S.T 1 N G LEGEND.
C I NT E'G R A T E D-SCHEDULE fr NEW PROJECTS-
- .BA NUMBER CHANGE' CATEGORY 'C' PROJECTS
' SORT BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93
........._____...........__...__...__...___........___..........__...........-..~
~GS BA DESCRIPTION CYCLE /
CLASS lFICATION
- NUMBER, YEARS
~
11 MRC 39 419735
. SECURITY EQUIPMENT - TMI REPLACE VARIOUS SECURITY EQUIPMENT
- 40. 41994C REPLACE BUILDING 400 11 FAC
- DEMOLISH EXISTING CONNECTED TRAILERS AND COMMON ROOF. CONSTRUCT A NEW BLDG FOR SECURITY, GETi ARWT AND OUTAGE PROCESSNG 41 '123GGG.
OTHER OUTAGE RELATED ACTIVITIES 11R ALL ALL OUTAGE RELATED ACT1VITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES, MINOR MODIFICATIONS, MOD SUPPORT, ETC.
42-123329:
REACTOR REFUELING - 11R 11R MRC RB
- APPROX 68 NEW FUEL ASSEMBLIES FOR 650
'EFPD 43 123330 RX BUILDING PRESERVATION 11R MRC RB PRESERVATION OF THE REACTOR BUILDING 4b-123331.-
CRDH FLANGE GASKET REPLACEMENT 11R MRC REPLACE-17 CRDM FLANGE GASKETS 45 123335 REPLACE MAIN STEAM LINE INSULATION 11R MRC REPLACE DEGRADING INSULATION ON MAIN
~ STEAM LINE:
..... _, ~
q_
- TM i - l' P R.O J E C T Li5T I NG LEGEND NRC l'NTEGRATED SCHEDULE I4EW PROJECTS
?
BA NUMBER. CHANCE _
CATEGORY
'C' PROJECTS SORT BY' CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OSS BA DESCRIPTION CYCLE /
CLASSIFICATION
-NUMBER YEARS
- 46. 412552 MODIFICATIONS FOR SElSMIC QUALIFICATION 11R NRR ALL
-MODIFICATIONS TO COMPLY WITH SEISMIC QUALIFICATIONS. SCOPE TO BE FINALIZED AFTER USt-A-46 WLKDOWNS (REF BA 128108) 47 412609 DIGITAL TURBINE CONTROL-Fv
% (DTCS) 11R REL UPGRADE MAIN TURBINE EP" dONICS WITH DIGlTAL CONTROL SY' O IMPROVE RELI ABILITY OF TURBINE ' s aOLS
~
48 412626 UPGRADE SOURCE RANGE N!! CLEAR INSTR (NI) 11R MRC CS RB REMOVE BF-3 DETECTORS FROM NI-1,2; ADD ADDITIONAL FISSIOP CHAMBERS FOR NI-11A, 12A CHANNELS; ROUTE CABLE. (PHASE 2)_
49 412644 REPLACE INVERTERS 11R MRC
~
REPLACE 3 CF 5 15KVA INVERTERS. MODIFY CABLES Ad NECESSARY..' PHASE 1 IS TO DETERMINE MOST ECONOMIC SOLUTION.
50 412646
- MOV MODS.
11,
NRR REPLACE OR MODIFY ACTUATORS AS REQUIRED.
- DUE TO GL' 89-10 PROGRAM -
EROSION /COR.ROSION PIPE REPLACEMENT 11R MRC
~51 412652 11R SCOPE, IF.ANY, IS DEPENDENT Ur.
iOR INSPECTION RESULTS.
52 '418808' RCP. SEAL lNSPECTION (4. CARTRIDGE KlTS)
- 11R MRC INSPECT / REPLACE SEALS ON RCP -INCLUDING
- I CARTRIDGE SEALS AND #1 SEALS O
a-
...m.4
___.,mem-_.
s.
...i.
- m
.2.
u u m
. - m m m.L
-m
.--a m
c-
'mwe e.
-,,r..c we-e.2e.
.nw c,
w gisy-
---wg
,s,=-e_,
-'w.si ee----
y
, a TMI-1 P R O J E C T.
LiSTI NG
' LEGEND'
' S'C H E D U L E
- .N R C 1 NTEGRATED
- . NEW PROJECTS
- BA NUMBER CHANCE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS.
BA-DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 53 123ABD.
REACTOR REFUELING 12R MRC LOAD FUELLASSEMBLIES FOR 600 EFPD
~54 123ABC RB PRESERVATION 12R MRC PRESERVATION OF THE RB IN VARIOUS AREAS.
55 123LLL OTHER OUTAGE RELATED ACTIVITIES 12R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.
56 418813 INCORE DETECTOR REPLACE (43) 12R MRC REPLACE 40 INCORE DETECTORS THAT ARE PROJECTED TO HAVE REACHED THE END OF
~ USEFUL LIFE.
57 128114-EPRI STEAM. GENERATOR. RELIABILITY PROGRAM 88-96 MRC
'CO-FUNDING FOR EPRI-SGRP TASK 404.
- 58. 123262 RELI ABILITY CENTERED MAINTENANCE PROG '
89-96 MRC RCM EVALUATION OF PLANT. SYSTEMS TO DEFINE MAINT. ACTIVITIES THAT-lMPROVE-REllABILITY.
59 128151 CAVITY DOSIMETRY. ANALYSIS...
91-93 NRR
- SHIP IRRADIATED CAVITY DOSIMETRY REMOVED IN 9R AND ANALYZE e
g.
0 e
._.e.,
.m.,
m
.,*E..
.,,,vb.
- ,,..,.w M..#..
w -y,E,',
+.e
'd, u.o
,.,,n.
s.
we5
..#m',;..
e,y-Eew.#
.'4.
...... [
,.s
]
I TM i - 1 PROJECT L I ST I NG I
LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT.BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS I
l 60 126223 TMI APPENDIX Vill QUALIFICATION 91-99 NRR l
SUBSCRIPTION FEE FOR PROGRAMS DEVEL BY EPRI & OTHERS FOR CONTRACTOR QUAL &
EERT OF UT NDE INSPECTORS PER APP Vill 61 128170 GulDELINES FOR ABNORMAL TRANSIENT PROC 92-93 IOE DEVELOP PLANT SPEC GUIDE (PSG) FOR TMI-1 ATP PROVIDING TECH BASES FOR ATP'S TO BE USED IN TRAINING, EVAL PROC CHANGES,ETC.
62 -128166 COMPONENT DATA BASE EXPANSION 92-94 IOE ENHANCE THE EXISTING ENG DATA BASE WITH SUBCOMPONENTS TO MEET THE NEEDS OF PLANT MAINT & OPERAilONS ORGANIZATIONS.
63 12E163 DRAWING ENHANCEMENTS TMI 92-95 MRC
- 3. REDRAW GEN ARRANG IN CAD FORMAT 64 128174 REPLACEMENT OF OZONE DEPLETING CHEMICALS 92-95 MRC RECHARGE EQUIPMENT THAT IS COMPATIBLE WITH REPLACEMENT CHEMICALS DUE TO PHASE 3
OUT OF OZONE DEPLETING CHEMICALS J
65 412643 FLOOD PANELS 92-95 ISM DEVELOP PLAN TO RESOLVE THE OUTSTANDING PRA ISSUE REGARDING FLOODING. ALSO IM-PLEMENT MODS DEEMED APPROPRIATE.
66 412645 CFC ELIMINATION 92-95 MRC 1
MODIFY / REPLACE EQUIPMENT TO BE COMPATIBLE WITH REPLACEMENT CHEMICALS AS REQUIRED.
_m
---g TM!
1 P R O'J E'C T' L l 'S T ! N'G LEGEND NRC I NTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE" CATEGORY.'C'. PROJECTS SORT'BY CATEGORY / CYCLE /BA STATUS AS OF 04NOV93 OBS
-BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER.
YEARS 67 412592
~1992 CONFIGURATION MANAGEMENT - DBR 92-98 IOE DESIGN BASIS RECONSTITUTION 1992 68' 128160 B&W OWNER'S GROUP PROGRAM - 1992/93 92/93 NRR PARTICIPATION IN B&W OWNERS GROUP PROGRAM 69 ~419232 SIMULATOR ENHANCEMENTS - TMI (1992) 92/93 REL UPGRADE THE PLANT-REFERENCED SIMULATOR IN ORDER TO IMPROVE ITS RELIABILITY AND SCOPE OF SIMULATION CAPABILITIES.
70 412618 ACCIDENT _ MANAGEMENT GUIDELINES (AMG) 93-95 NRR
- USING IPE OUTPUT,'OEVEL AMG FOR USE BY EMERG RESPONSE PERSONNEL TO COPE WITH CORE. DAMAGE EVENTS' 71 126109 BWOG GLRA PROGRAM 93-97 MRC PARTICIPATE IN AND PROVIDE SUPPORT FOR-THE BWOG GENERIC LICENSE RENE.2k APPLICATION (GLRA) PROGRAM ET2 126238 EVAL OF THI ALERT & NOTIFICATION SYSTEM 93/94 NRR EVALUATE SYSTEM SIRENS USING LATEST DEMOGRAPHIC & TOPOGRAPHIC. INFO:TO INSURE
- STILL MEETING FEMA REQMNTS-
- 73. 128173 CAVITY DCSIMETRY ANALYSIS' 93/94 NRR
~
REPLACE A & B CAPSULE HOLDERS WITH NEW DOSIMETRY DURING 10R, TRANSPORT, ANALYSIS'
- AND REPORT OF RESULTS OF TESTING
,y y,-w.,.m.
-.y
+w==a*-se, v
was-,
e.
e e
e<+,-
wiw..-
w y
nv w
w wet n-i.
v iw ew,n,-*
iw m-.,.-a
--a
--u-=-n---. - - - - - - -
^
4 TM I-1 PROJECT L i S-T I NG LECEND
'NRC l NTEGRAT-ED SCHEDULE NEW PROJECTS.
- . BA NUMBER CHANGE CATEGORY
'C' PROJECTS
' SORT.BY. CATEGORY / CYCLE /BA STATUS.AS OF 04NOV93
....................____..____....___...........--,-__=-.... ___........... __..___...___............___..............__........__.
OBS-BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
- 74 ' 122031-DEMOBILIZATION SOUTH OF THE DIKE 94 GWC i
DEMOLITION, DISCONNECT ELECTRICAL, DISPOS OF MATERIALS FOR FACILITIES JOUTH OF THE DIKE (SEE BA FOR DETAILS OF FACILITIES).
75 12694C.
MAINTENANCE TRAINING ANALYSIS 94 NRR DEVELOP TASK ANALYSIS JOR I&C, ELECTRICAL AND MECHANICAL INPO ACCREDITED PROG I
l
- 76. 128181
- SIMULATOR ENHANCEMENTS 94 REL
REACT UPCRAPE, FW F LOW, CURIE TRANS.,ETC.
77 412619 CPU /IPU UPGPADE FOR PLANT PROCESS COMPUT
'94-97 IOE UPGRADE PLANT. PROCESS COMPUTERS CPU AND
. lPU BOARD $ (18) WITH A SINGLE BOARD.
'78 128183
' PARTICIPATION IN B&W OWNERS GROUP.
s PROGRAM
-79 128175
. ASSMNT & UPGRD OF UNDRGRND TANKS / PIPING 94-99 ERR
- l-ASSESS APPLIC TANK / PIPE SYS.
Il-INIT TEST & MONITORING.
Ill-UPGRADE AS REQD.
(REF 40 CFR.112)
-80 412624' CORE. MONITORING SYSTEM UPGRADE 95 ISM INSTALL NEW F IXED MARGIN TS SFTWARE THAT WHEN UCED WITH EXISTING NAS WILL' PROVIDE ADDED OPERATING SAFETY MARGIN mam m.
s
- . m... -m. m.
m
, _ _,. _ __,,_m.m 3.._,,
,,_.,,h,_
,f.,
m
,,.,.v, v
m.p p
p
_,,,q, f
y, m.
,p_p, y
~,
+
T M 'l -1 P
LI $ TING
..........___-R O J E C T LEGEND NRC 1 N T E G R'A T E.D SCHEDULE NEW PROJECTS'
- BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCL E/BA STATUS AS OF 04NOV93 OBS.
BA DESCRIPTION CYCLE /
CLASSIFICATION
~ NUMBER YEARS 3
?
81.128ADW REACTOR CAVITY DOSIMRTRY - 11R' 95-99 NRR
-i i
SHIP IRRADIATED CAVITY DOSIMETRY REMOVED iN 11R AND ANALYZE 82--128AEC-
'
'3. REDRAW GEN ARRANG IN CAD FORMAT 83 1261011 PLANT LIFE ASSURANCE / EXTENSION 96/97 hEL SUPPORT OF STUDIES BY GPUN &'BWOG
--k
- FOR FEASIBILITY OF EXTENDING OPERATING LIFE.
84 412631 PRESSURIZER HEATER BUNDLE REPLACEMENT 96/9T MRC DEVELOP A PROCUREMENT SPEC TO DESCRIBE THE ELEC AND MECH REQUIREMENTS FOR A-
-lNEW BUNDLE, PURCHASE IN '94/'95.
85 412634 TMI-1 RCP MOTOR STANDBY STATOR AND ROTOR 96/97 MRC SPECIFY AND PROCURE A SPARE STATOR AND ROTOR SUITABLE FOR ANY RCP MOTOR. NO PROCUREMENT FUNDING-ENGINEERING ONLY.
86 128ADV-'
1996'CONFIG MGMT.SSFl
-96/98 ISM PERFORM ONE SAFETY. SYSTEM FUNCTIONAL'
' INSPECTION. PREPARE DRAFT DESIGN BASIS
' DOCUMENT IF REQUIRED.
i e
e,-
er
.w, r4 -.
=w.
-e--
ee-rw
- ~
.a e
v m -
r d
e w
= me r.~-
o e, -r ye.,m-e-
.u.-
<W
=, e
ABC Classifications a)
Meet NRC Reouirements (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.
b)
Meet Environmental Reouirements (ERR) - Activities that a) are specifically raeuired by environmental regulatory agencies (State and Federal) or b) nave been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency, c)
Meet Other Reouirements (0RR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, a rt order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.
d)
Increase Safety Marains (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compidance nor required by safety regulations, codes or guidance, e)
Decrease Environmental Effect1 (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental-regulations, codes or guidance.
f)
Jmprove Radioloaical Conditions (RAD) - Activities that, if '
implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance, g)
Maintain
,iability/ Capability (MRC) - Activities that, if
.implementea, will maintain power production at existing levels by preventing deterioration of plant systems or equipment.
Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without'which the plant could not operate prudently, h)
Improve Reliability / Capability (REL) - Activities that, if-implemented, will increase power generation by improving availability or capacity factor to maximize energy. output.
7-4 i
ABC Classifications (continued) i)
Improve Operational Effectiveness (10E) - Activities that, i f implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.
j)
Imotove Personnel Facilities (FAC) - Activities that, if ir.iplemented, will improve working conditions and the usefulness of personnel facilities.
k)
Provide Continaency/Blankel (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work. requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.
1)
Imoroves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.
I a
f
,r
- 4. --. :: -
ATTACHMENT B-CHANGES TO THI-1 NUCLEAR GENERATING STATION-INTEGRATED SCHEDULE SEMIANNUAL UPDATE (N0VEMBER 4, 1993)
CATEGORY A PROJECIS Additions:
None Completions:
None Deletions:
None Schedule Changes:
None
l 9
ATTACHMENT B (continued)
CATEGORY B PROJECTS Additions:
As denoted by
- next to the project title in Attachment A.
Completions:
128108 TF Seismic Qualification of Equipment (SQUG) 123289 ILRT 123290 OTSG Tube Plugging 126231 OTSG Eddy Current Testing 126234 TMI Inservice Inspection 128148 Erosion / Corrosion Program and Inspection 128155 Solenoid Valve / Limit Switch Upgrade 128176 IST Check Valve Non-Intrusive Testing 412596 TMI-? i.ndividual Plant Evaluation 412611 Replace EIM Motor Actuators Deletions:
41996D Simulator Modifications and 41997G Simulator Modifications Combined with BA 41995G Simulator Modifications - Out years Schedule Changes:
41995G Simulator Modifications - Out years The budgeted years changed _ to 1995 through 1999.
This change was due to budget change only. No schedule change occurred.
Other Changes:
None e
4
ATTACHMENT B (continued)
CATEGORY C PROJECTS Additions:
As denoted by
- next to the project title in Attachment A.
Completions:
123DDD Other Outage Related Activities 123294 Reactor Refueling 123315 Replace CRDM Flange Gaskets / Boron Removal 123316' Main Condenser Preservation Program 123319 RB Preservation Program 225012 THI-2 PDMS Electrical Mods - Cycle 9 work only.
412552 Mods for Seismic Qualification 412570 Replace Gaseous Chlorine System 412577 Additional Turbine Building and Intermediate Building Platforms - Cycle 9 work only.
412604 Control Rod Replace 412612 Permanent Demin System in Parallel with Misc. Waste Evaporator 412622 OTSG Sleeving 412623 Foxboro Transmitter Replacement 412625 Foxboro Recorder Replacement 412626 Upgrade Source Range Nuclear Instrumentation 412627 HSPS Upgrades 412628 Reactor Building Cooling Sys Tie-In 412629 Main Fuel Bridge Variable Frequency Drive System 412633 HPI Piping Upgrades 412638 Heater Drain _ Piping Replacement 412642 ICCW Flow Improvement i
418766 TMI-1 Lighting Enhancement 418794 Plant Preservation - BOP (Capital) - Cycle 9 work only.
418800 RCP Cartridge Seal Conversion Kit 418801 Improve Plant Page. System 418803 THI-2 Lighting Enhancement 418807 Plant Preservation (B0P) Program 419710 U-2 Admin Building -' Engineering Study Complete, remainder added to Cycle 10.
419724 Remodel'and Construct Addition _- Bldg 43 419735 Security Equipment - Cycle 9 work'only.
419737 TMI Security Enhancements Cycle 9 work only, to be completed in Cycle 10.
419737 TMI Security Video Enhancements - Cycle 9 work only, to be completed in Cycle 10
ex w.
ATTACHMENT B (continued)
~ Deletions:
412536 Digital Inst and Control Mod'- Cycles 10R, 11R, 12R, 13R.
412608 Options to Reduce Iron Transport.to-0TSG 412615 Turbine / Intermediate Bldg Platforms 412960 Simulator Enhancements ~
412AEG Fuel Equipment for Reactor Building 412AHE Cavity Seal Plate Installation 412AHJ RCS Resistance Temperature Detectors 418750' Service Building Addition Fence Relocation 418812 Roof Repairs - 1996 BA Number Changes:
QHS Previous BA Number New BA 32 419689 Roof Replacement s 419738 51 412AGW Erosion / Corrosion Pipe 412652 Replacement 76 41994G Simulator Enhancements 128181 78 128ADX B&W Owners Group 128183 t
')