_

8 = 4 O PSEG Pubile Serv:ce Electnc and Gas Company P.O Box 236 Hancocks Brioge, New Jersey 08038 Hope Creek Generating Station November 12, 1993 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT HOPE CREEK GENERATION STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for October are being forwarded to you. The summary of changes, tests, and experiments that were implemented during October 1993 pursuant to the requirements of 10CFR50.59(b) will be included with the month of November 1993.

Sincerely yours, h, e\

R. J. Hoveyl General Manager -

Hope Creek Operations >

pa d DR: WS Attachments C Distribution 19n020 The Enerav Peonin ..

Af9f '

If -

I 9311190147 931130 .j us an esv, am PDR R ADOCK 05000354PDR l3

i i

INDEX -;

1 NUMBER

  • SECTION OF PAGEg Average Daily Unit Power Level. . . . . . . . . . . 1 Operating Data Report . . . . . . . . . . . . . . . 3 Refueling Information . . . . . . . . . . . . . . . 1 Monthly Operating. Summary . . . . . . . . . . . . . 1 -i Summary of changes, Tests, and Experiments. . . . . 1 i

h 5

h

+

h

i I

i l

OPERATING DATA REPORT H DOCKET NO. 50-354 UNIT Hone Creek  !

DATE 11/08/93 , l COMPLETED BY V. Zabielski , f TELEPHONE (609) 339-3506 OPERATING STATUS

1. Reporting Period Octoher 1993 Gross Hours in Report Period lib
2. Currently *.u*herized Power Level (MWt) 3293 Max. Depend, v3cacity (MWe-Net) 1921 Design Electrical Rating (MWe-Net) 1067
3. Power Level to which restricted (if any) (MWe-Net) None
4. Reasons for restriction (if any)

This Yr To Month Date cumulative

5. No. of hours reactor was critical 745.0 7215.0 51470.6
6. Reactor reserve shutdown hours 0.0 0.0 0.0
7. Hours generator on line 145.0 7195.9 50700.8
8. Unit reserve shutdown hours 0.0 0.0 0.0
9. Gross thermal energy generated 2447330 23405377 161618595 (MWH)
10. Gross electrical energy 811990 7762270 53510324 generated (MWH)
11. Net electrical energy generated 777445 7432337 51134721 (MWH)
12. Reactor service factor 100.0 98.9 85.5
13. Reactor availability factor 100.0 98.9 85.5
14. Unit service factor ,00.0 98.6 84.2-
15. Unit availability factor 100.0 98.6 84.2
16. Unit capacity factor (using MDC) 101.2 98.8 822A
17. Unit capacity factor 97.8 95.5 79.6 (Using Design MWe)

.18. Unit forced outage rate 0.0 124 4.3

19. Shutdowns-scheduled over next 6 months (type, date, & duration):

Sth refueling. outage, starts March 5th 1994, 49 day duration

20. If shutdown at end of report period, estimated date of start-up:

N/A

4 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-354 UNIT Hope Creek DATE 11/08/93-COMPLETED BY TELEPHONE V. Zabielskik)gfi (609) 339-3506 c g MONTH October 1993 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR l F= FORCED DURATION REASON REDUCING- CORRECTIVE '

NO. DATE S= SCHEDULED (HOURS) (1) POWER (2)' ACTION / COMMENTS No reportable rower reductions 1n period.

5

?

i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-354 UNIT Hope Creek DATE 11/08/93 COMPLETED BY yj Zabielski,gr{}p '

TELEPHONE (609) 339-3506 I -

y '

MONTH October 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) -(MWe-Net)

1. 1055 17. 1036
2. 2057 18. 1037
3. 19.11 19, 1047
4. 1048 20. 1050
5. 1048 21. 1.026

.6. 1914

  • 22. 1038
7. 1041
  • 23. 1039 *
8. 1035 2 ': . 1047
9. 1035 25. 1067 .
10. 1000 26. 1046 t
11. 2057 27. ,1048 12 . - 1054 28. 1047-13.- 1047 29. 1057 '!

-14. 1053- 30. 1045

15. 1043 31. 1044
16. 1047 ,

-b Correction applied.-to watthour meter readings.

i

_ , _ . w_ -

HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

October 1993 Hope Creek entered the month of October at approximately 100%

power. The unit operated at full power through the end of the '

month without any major power reductions or plant trips. As of October 30, the plant has been on line for 165 consecutive days.

l

)

)

l REFUELING INFORMATION DOCKET NO. 50-354 UNIT 51one Creek 1 DATE fovember 9, 1993 COMPLETED BY S. Hollinasworth TELEPHONE (609) 339-1051 MONTH October 1993

.i

1. Refueling information has changed from last month:

Yes No X

2. Scheduled date for next refueling: 3/5/94
3. Scheduled date for restart following refueling: 4/23/94
4. A. Will Technical Specification changes or other license amendments be required?

Yes No X B. Has the Safety Evaluation covering the COLR been-reviewed by the Station Operating Review Committee?

Yes No  %

If no, when is it scheduled? 2/18/94

5. Scheduled date(s) for submitting proposed licensing action:

Ent scheduled yet.

6. Important licensing considerations associated with refueling:

None

7. Number of Fuel Assemblies:

A. Incore 251 B. In Spent Fuel Storage (prior to refueling) 1.008 C. In Spent Fuel Storage (after refueling) 12A2 -

8. Present licensed spent fuel storage capacity: 4006 Future spent fuel storage capacity: 4006 ,
9. Date of last refueling that can be discharged 5/3/2006 to spent fuel pool assuming.the present (EOC13) licensed capacity:

(Does allow for full-core offload) F (Assumes 244 bundle reloads every 18 months.until then)

(Does Dpt allow for' smaller reloads due to improved fuel)

SUMMARY

OF CHANGES, TEST'., AND EXPERIMENTS FOR THE HOPE CREEK GENERATING STATION October 1993 The October summary will be reported in combination with the November summary next month.

l s