CC91 #93-14158 PIIILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION R.D.1, Box 208 g
Delta, Itnnsylvania 17314 rex u prnou-nu ews R os 1iritt1Nct (717) 4 % -7014 D. Il Millor, Jr.
Vce Presemt November 10, 1993 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Cbmmission Document Control Desk Washington, DC 20555 SURIDCT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the raonth of October 1993 forwartled pursuant to Technical Specification 6.9.1.d urtler the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, k-('
)0LVh $) /$k v
DfM/A3W/ GIG /TJN/MSH:wjj Enclosure cc:
R.A. Barricelli, Public Service Electric & Gas W.P. Dornsife, Ctramonwealth of Pennsylvania R.I.149Tean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident Inspector H.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Ptuer INPO Records Center C' & ff;' *2
.f,jj2+
9311180264 931031 L'
1l PDR ADOCK 050002 7 j.l R
~
4 f
i IGC Mcrrthly Operaticru Aminry Poadi Bottcza Atmin Power Staticri October 1993 INIT 2 Unit 2 began the renth at naminal 100% pwer. Iate on October 1st the unit was shutdown to perform inspections on Walworth MOV's for yoPa cracPirg. 'Ihe MOV inspections ard r-vry repairs were completed on October 7th but the unit remained shutdown due to reactor vessel shroud generic cracking issues. After resolution of the shroud crackirg issues the unit was restarted on October loth.
On October 13th power ascension was held at approxirately 960 mb due to Pellet Clad Interaction Limitations (PCIOMR).On October 16th power was reduced to perform a rod pattern adjustnent and the unit was returned to 100% nominal power on October 17th. '1he unit operated at 100% power for the remainder of October.
INIT 3 Unit 3 began the renth shutdown in the middle of the ninth refueling outage.
Major work acconplished durirg the month was a conplete inspection of the reactor vessel shroud, control rod drive excharges, control rod blade exchanges ard reactor refueling. At ranth's end the reactor vessel reassembly was in progress ard preparations for prirary system hydro were being rade.
k I
I CC1093.NRC
E 6.
Docket No. 50-277 Attachment to Monthly Operating Report for October 1993 INIT 2 RERH21G INFORMATICN 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refuelirg shutd wn:
L Reload 10 scheduled for September 10, 1994.
t 3.
Scheduled date for restart follwirg refuelirg:
Restart following refuelirg forecast for D-bl 8, 1994.
4.
Will refueling or resumption of operation therefore require a technical specification charge or other license aterrinent?
No.
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for subnitting proposed licensiIn action and s 2pportirg inforration:
N/A 6.
Irportant licensirg considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perforrance analysis methods, significant charges in fuel design, new operatire procedures:
N/A CC1093.!EC i
i Docket No. 50-277 Attachment to Monthly Operatirg Report for October 1993 Page 2 INIT 2 REFUEGING INFGWd'ICN (Continued) 7.
'Ibe number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assablies l
(b)
Fuel Pool - 2164 Ibel Assablies, 58 Fuel Rods 8.
'Ihe present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is
- .lanned, in number of fuel assablies
'Ihe spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies, j
9.
'Ihe projected date of the last refueling that can be discharged to the spent fuel pool as-irs the present capacity:
September 2003 without full core offload capability.
Septaber 1997 with full core offload capability.
CC1093.NRC
Docket No. 50-278 Attactment to Monthly Operatirg Report for October 1993 INIT 3 REFUEGDU INFORKUIOT i
1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdcun:
Reload 9 in progress 3.
Scheduled date for restart following refueling i
Restart following refueliry scheduled for November 12, 1993 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No If answer is yes, what, in general, will these be?
i i
5.
Scheduled date(s) for suhaittirg propced licensing action and supportirg information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant charges in fuel design, new operatirg Procedures-N/A CC1093.NRC P
3 Docket No. 50-278 Attachment to Monthly operatirg Report for October 1993 Page 2 i
INIT 3 REFUFJEC INFUWiTICN (Continued) i t
7.
'Ibe number of fuel asserblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Cbre - 764 Ibel Assemblies i
(b)
Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods
-l 8.
'Ihe present licensed spent fuel pool storage capacity ard the size of any increase in licensed storage capacity that has been regaested or is planned, in number of fuel 1sserblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel asserblies.
t 9.
The projected date of the last refuelirg that can be discharged to the spent fuel pool amming the present capacity:
September 2004 without full core offload capability.
Septenber 1998 with full core offload capability.
6 i
e i
i I
j CC1093.NRC i
l 1
i '
4 8
s 4
AVERAGE DAILY UNIT POWER LEVEL s
DOCKET NO. 50 - 277 F
UNIT PEACM BOTTOM UNIT 2-DATE NOVEMBER 5,1993 COJAY PHILADELPHIA ELECTRIC COMPANY
'e W. J. JEFFREY PERFORMANCE & RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 MONTH SCTOBER 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL (MWE-NET)
(MWE-NET) 1 961 17 1018 2
11 18 1055 3
0 19 1061 4
0 20 1069 5
0 21 1067 6
0 22 1067 7
0 23 1063 8
0 24 1066 9
0 25 1062 10 2
26 1067 11 506 27 1067 12 827 23 1067 1
13 907 29 1067
{
14 932 30 1067 15 923 31 1067 16 826
^
\\
a t
t nVERAGE DAILY UNIT POWER LEVEL l
DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 5,1993 COMPANY PHILADELPHIA ELECTRIC COMPANY l
W. J. JEFFREY PERFORMANCE & RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHO':E (717) 456-7014 EXT. 3321 MONTH OCTOBER 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(%'E-NET )
1 0
17 0
1 2
0 18 0
J 3
0 19 0
4 0
20 0
'i l
5 0
21 0
I r
6 0
22 0
l l
7 0
23 0
8 0
24 0
I 9
0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
l i
13 0
29 0
I 14 0
30 0
15 0
31 0
16 0
1 1
l 1
4
4 f
OPERATING DATA REPORT DOCKET NO. 50 - 277 DATE NOVEMBER 5,1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY 4
W. J. JEFFREY.
PERFORMANCE & RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 l NOTES:
- 2. REPORTING PERIOD:
OCTOBER, 1993 l
- 3. LICENEED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEFENDABLE CAPACITY (NET MWE):
1053
- 8. If CHANGES OCCUR IN CAPACITY RATING' (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET NWE):
- 10. REASONS FOR RESTR!CTIONS, IF ANY:
THIS MONTH YR-TO-DATE-CUMULATIVE
- 11. HOURS.IN REPORTING PERIOD 745 7,296 169,416
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 535.0 6,264.0 1D4,648.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0-
- 14. HOURS GENERATOR OW-LINE 535.0 6,107.0 100,756.2 1$. UNIT RESERVE SHUTDOWN HOURS C.0 0.0 0.0
- 16. GROSS THERMAL ENERGY CENERATED (MWH) 1,635,499 19,333,609 299,703,353
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 542,700 6,382,400 98,554,790
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 523,509 6,155,505-94,442,224 PAGE 1 0F 2-4
-e i
M-t B
OPERATING DATA REPORT (CONTINUED)
- DOCKET Wo. 50 - 277 DATE NOVEMBER 5,1993
- t THIS MONTH YR-TO-DATE CUMULATIVE I
- 19. UNIT SERVICE FACTOR 71.8 83.7 59.5
- 20. UNIT AVAILABILITY FACTOR 71.8 83.7 59.5 j
l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 66.6 80.0 52.8 -.
- 22. UNIT CAPACITY FACTOR (USING DER NET) 66.0 79.2-52.3
- 23. UNIT FORCED OUTAGE RATE 28.2 6.5
.14.0 '
.i
- 24. SHUTDOWh$ SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
j r
- 25. IF SHUTDG AT END OF REPORT PERICO, ESTIMATED DATE OF STARTUP: N/A f
- 1
- 26. UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION):
FORECAST ACHIEVED
,. l INITIAL CR111CALITY 09/16/73
^
INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 i
e 3
?
- [
f i
i a
I r
J-9
.PAGE 2 0F 2 i
?
a i
- i 1
A J
l r
6 6
'r k
6 w
t y
%y
+
y-w~
i
.+-
4 i
OPERATikG DATA REPORT
~
DOCKET NO. 50 - 278 DATE NOVEMBER 5,1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W. J. JEFFREY PERFORMANCE & RELIABILITY SliE ENGINEERING PEACH BOTTOM ATOMIC POVE1 STATION TELEPHONE (717) 456-7014 EXT. 334s OPERATING STATUS
- 1. UNIT HAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIOD:
OCTOBER, 1993
.1
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1D65
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 1098 f.
e
- 7. MAXIMUM DEPENDABLE CAPACITY (WET MWE):
1035 l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS NUMBER 3 THe00GH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, F ANY:
-THIS MONTH YR 70-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7,296 165,312
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0
5,814.0 103,872.4
- 13. REACTOR RESERVE SHUTDOWN HOURS hh
- 14. HOURS CENERATOR ON-LINE 0.0 5,795.0-100,492.2.
~
- 15. UNIT RESERVE SHUTDOWN HOURS bb bb bb i
- 16. GROSS THERMAt ENERGY GENERATED (MWH) 0 17,780,723 296,361,933
- 17. GROSS ELEClRICAL ENERGY GENERATED (MWH) 0 5,784,400
..-97,224,532
)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-3,658 5,569,926 93,233,892 Jj PAGE 1 OF 2
-l
=J l
l a
=
i l
t
-t r
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 278 i
s.
- 1 I
DATE NOVEMBER 5,1993
~*
i i
THIS MONTH YR-TO-DATE
. CUMULATIVE t
- 19. UNIT $ERVICE FACTOR 0.0 79.4 60.8
- 20. UNIT AVAILABILITY FACTOR 0.0 79.4 60.8 t
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 73.8 54.5.
I
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0.
71.7 53.0-l
- 23. UNIT FORCED DUTAGE RATE 0.0 2.6 12.2 l
.i
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 M0hTHS (TYPE, DATE, AND DURATION OF EACH):
[
i i
N
- 25. IF SHUTDOWN AT END OF REPORT PERIDD, ESilMATED DATE OF STARTUP: 11/14/93
-l
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/76 I
INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 S
?
1 f
1 i
t
- i i
PAGE 2 0F 2-f I
. e i
i i
- l i
4
^
8 l
l 1
4 1
l i
l 1
l i
I 1
J i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 277 l
UNIT NAME PEACH BOTTOM UNIT 2 DATE NOVEMBER 5,1993 REPORT MONTH OCTOBER, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W. J. JEFFREY PERFORMANCE & RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 l
j j
j METHOD OF l LICENSEE ' SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPEjDURATIONjREASONj$ HUTTING DOWNj EVENT CODE CODE ACTION TO NO.] DATE (1)j(HOURS)j (2) j REACTOR (3) l REPORT #
(4)
(5)
PREVENT RECURREkCE I
l 1
24 931001 F'
210.0 B
1 N/A SF VALVEX INSPECTION OF WALVORTH MOV'S FOR YOKE CRACKS 25 931016 '
38.0 l N
4 N/A RC CONROD R00 PATTERN ACJUSTMENT. REACTOR NOT SHUTDOWN i
l l
1 l
I I
i i
i l
248.0 l l
l h
1)
(2)
(3)
(4)
-i F - F00CED AEASON METHOD EXHIBIT G
- NSTRUCTION5 S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARAT!t4 T PAT 7, B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C
REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
L REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5) l G - OPEF.ATIONAL ERROR (EXPLAIN) e H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURr'.
s 1
1 1
?
j 1
,,n 7
e
.+.
[
L
?
O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE NOVEMBER 5,1993
.[
1 I
W. J. JEFFREY
)'
PERFORKANCE & RELIABILITY SITE ENGINEERING 1
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 i
l
)
j METHOD OF LICENSEE STSTF*,'3MPONENTl CAUSE AND CORRECTIVE l
TYPE DURATION!kEASON. SHUTTING DOWN EVENT COD E,
CODE j ACTION TO NO.
DATE i(1)
(HOURS)j (2)
, REACTOR (3:
REPORT #
(4) }
(5) l PREVENT RECURRENCE j
' 1 21 931001 S
745.0 C
1 N/A 22 2Z22Z2 UNIT 3 NINTH REFUELING DUTAGE h
l l
l
?
l l
i i
t
.g
?
i
?
l
]
y I
l 745.0 l l
l l
1 1
(1)
(2)
(3)
(4) 1
-F - FORCED REASON METHOD ^
EXf:lBif G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA i
8 MAINTEAANCE OR TEST 2 - KANUAL SCRAM.
ENTRT SHEETS FOR LICENSEE
~
C REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
I D - REGU' Af 0Rf RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161) t E - OPERriUR iRAINING + LICENSE EXAMINATION l
F - ADMINISTRAftVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXF1 BIT 1 - SAME SOURCE I
k f.
I
.