ML20059M181

From kanterella
Jump to navigation Jump to search
Advises That Reexamination of Remaining Four Licensed Operators Deferred Until Next Licensed Operator Requalification Exams Scheduled for Apr 1991.Listing of Operator Status Encl
ML20059M181
Person / Time
Site: Brunswick  
Issue date: 09/26/1990
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS-90-201, NUDOCS 9010030253
Download: ML20059M181 (2)


Text

. _ _ _ _ _. - - -...

~

Cp&L Carolina Power & Light Company SEP 261990 SERIAL: NLS 90-201 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT FJS. l'AND-2 DOCKET NOS. 50 325 & 50 324/ LICENSE WOS. DPR-71 & DPR 62 LICENSED OPERATOR REQUALIFICATION EXAMINATIONS Gentlemen:

During the weeks of April 30 and May 7,1990, the Nuclear. Regulatory Commission administered licensed operator requalification (LOR) examinations.-

at the Brunswick' Steam Electric Plant. These examinations resulted.in a total 1

of fourteen failures by the NRC:and/or CP&L evaluators.. Since'those; initial.

j LOR examinations, subsequent examinations. by the NRC have resulted in four of i

those individuals successfully completing LOR' requirements (see Enclosure).

I i

NUREG-1021,. Revision 6,,ES 605(C) states "the second NRC administered:

j examination will usually be administered within six months of the initial-1 failure notification....".

Five of the. remaining ten licensed individuals are-currently scheduled to be re-examined during the week of October 15, 1990, and one individual has left the Company, thus not requiring-re-examination.

Carolina Power & Light Company has determined that the remaining four licensed personnel that will not have had the second NRC-administered examinsP. ion will i

not be completely remediated to support re-examination by.the.NRC within the nominal six month time frame. As such,_CP&L is deferring re-examination of j

l=

these personnel until the next LOR examinations, currently scheduled for 3

April 1991, 1

1 Please refer any questions regarding this schedule to Mr.'R. M. Poulk, Jr. at l

(919) 457-2314.

1 i

l "ours very truly,

)

r l

l r

J Gerald E. Vaughn 3

i Vice President Nuclear Services Department RMP/WRM/wrm (\\cor\\1orexam)

Enclosure t

1.

cc:

Mr. S. D. Ebneter Mr. N. B. Le Mr. R. L. Prevatte dit Fayettev le Street

  • P O Don 1551 e i pie.gn, N C. 27602 h0 253 poop 26 E~'

i' ' ' '

~"

\\

v OCK 05000324 PDC

l-o.

ENCLOSURE

-l

_DQCKET NUMBER STATUS 55-20003 Re-examined - Passed i

55 20503 Re-examined - Passed' l-55 21161-Re examined Passed-55-21022 Re-examined - Passed 55-8809 Scheduled Re-exam 10/90 55-8822 Scheduled Re exam 10/90:

55 20643 Scheduled Re-exam 10/90 55-21019 Scheduled Re-exam 10/90 55-20644 Scheduled Re-exam 10/90

.i 55 20810 Scheduled Re-exam 4/91

)

55-21159 Scheduled Re-exam 4/91 1

55-4767 Scheduled Re-exam 4/91 55-7362 Scheduled Re-exam 4/91-3 I

55 20814 Left the Company: