Cp&L Carolina Power & Light Company SEP 261990 SERIAL: NLS 90-201 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT FJS. l'AND-2 DOCKET NOS. 50 325 & 50 324/ LICENSE WOS. DPR-71 & DPR 62 LICENSED OPERATOR REQUALIFICATION EXAMINATIONS Gentlemen:
During the weeks of April 30 and May 7,1990, the Nuclear. Regulatory Commission administered licensed operator requalification (LOR) examinations.-
at the Brunswick' Steam Electric Plant. These examinations resulted.in a total 1
of fourteen failures by the NRC:and/or CP&L evaluators.. Since'those; initial.
j LOR examinations, subsequent examinations. by the NRC have resulted in four of i
those individuals successfully completing LOR' requirements (see Enclosure).
I i
NUREG-1021,. Revision 6,,ES 605(C) states "the second NRC administered:
j examination will usually be administered within six months of the initial-1 failure notification....".
Five of the. remaining ten licensed individuals are-currently scheduled to be re-examined during the week of October 15, 1990, and one individual has left the Company, thus not requiring-re-examination.
Carolina Power & Light Company has determined that the remaining four licensed personnel that will not have had the second NRC-administered examinsP. ion will i
not be completely remediated to support re-examination by.the.NRC within the nominal six month time frame. As such,_CP&L is deferring re-examination of j
l=
these personnel until the next LOR examinations, currently scheduled for 3
April 1991, 1
1 Please refer any questions regarding this schedule to Mr.'R. M. Poulk, Jr. at l
(919) 457-2314.
1 i
l "ours very truly,
)
r l
l r
J Gerald E. Vaughn 3
i Vice President Nuclear Services Department RMP/WRM/wrm (\\cor\\1orexam)
Enclosure t
1.
cc:
Mr. S. D. Ebneter Mr. N. B. Le Mr. R. L. Prevatte dit Fayettev le Street
- P O Don 1551 e i pie.gn, N C. 27602 h0 253 poop 26 E~'
i' ' ' '
~"
\\
v OCK 05000324 PDC
l-o.
ENCLOSURE
-l
_DQCKET NUMBER STATUS 55-20003 Re-examined - Passed i
55 20503 Re-examined - Passed' l-55 21161-Re examined Passed-55-21022 Re-examined - Passed 55-8809 Scheduled Re-exam 10/90 55-8822 Scheduled Re exam 10/90:
55 20643 Scheduled Re-exam 10/90 55-21019 Scheduled Re-exam 10/90 55-20644 Scheduled Re-exam 10/90
.i 55 20810 Scheduled Re-exam 4/91
)
55-21159 Scheduled Re-exam 4/91 1
55-4767 Scheduled Re-exam 4/91 55-7362 Scheduled Re-exam 4/91-3 I
55 20814 Left the Company: