ML20059L112
| ML20059L112 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 12/21/1990 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20059L081 | List: |
| References | |
| NUDOCS 9311160303 | |
| Download: ML20059L112 (4) | |
Text
i m r4ucw)
NUMW3t
- luy, SOUTil TEXAS PROJECT ELECTRIC GENERKnNG STKrlON NO.
(3wlev 4.0 4
OPERATIONS QUAIIIY ASSURANCE PIAN QUALIFICADON, TRAINING AND pg.i; i op 4 CERTIFICABON OF PERSONNEL I
I l
IJTILDT.
DNIE 12/21/90 l
i 1.0 PURPOSE 1.1 The purpose of this chapter is to establish requirements for qualification, training, and certification of personnel whose activities may affect quality-related structures, systems, components and activities at the South Texas Project Electric j
Generating Station (STPEGS).
2.0 SCOPE 2.1 This chapter provides for the qualification, training, and certification of personnel performing activities related to the structures, systems and components under the jurisdiction of the Operations Quality Assurance Plan (OQAP).
3.0 DEFINITIONS 3.1 None
4.0 REFERENCES
4.1 Regulatory Guide 1.8, Personnel Selection and Training 4.2 Regulatory Guide 1.58, Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel 4.3 Regulatory Guide 1.146, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants 4.4 SNT-TC-1A, Recommended Practice for Nondestructive Personnel Qualification and Certification 4.5 10CFR55 Operator's Licenses 4.6 ASME Section XI, Rules for Inservice Inspection of l
Nuclear Power Plant Components 4.7 OQAP Chapter 14.0, Records Control b
r 4.8 INPO ACAD 92-004, Guidelines for the Conduct of o
Training and Qualification Activities kQ l
9311160303 931109 P~<
L l
PDR ADOCK 05000498 i l
P PDR
[g
s,v 72. (o:,y NUMN3t Illy.
SOUTil TEXAS PROJECT El.ECTRIC GENERATING STATION NO.
(2iapter 4.0 4
OPERATIONS QUAllTY ASSURAN PLAN QUAllFICATION, TRAINING AND PF.E 2 OF 4 CERTlFICATION OF PERSONNFl.
amenvE DATE 12/21/90 i
l l
l 5.0 REOUIREMENTS 5.1 General 5.1.1 Position qualification requirements shall be established for personnel performing activities within the scope of this document in accordance with Reference 4.1, 4.2, 4.3, 4.4, 4.5 and 4.6.
5.1.2 Programs shall be developed for the o
I qualification, training, and certification of o
personnel.
The programs shall provide for:
f G
5.1.2.1 Establishing individual training files.
l 5.1.2.2 Documented certification, when l
required (i.e., NRC licensed personnel, NDE personnel).
5.1.2.3 Continuing training and retraining.
5.2 General Enployee Training 5.2.1 A general employee training program shall be developed and administered to all personnel j
requiring unescorted access within the protected and/or vital areas.
This program shall address but not be limited to the following-5.2.1.1 Job related procedures and l
instructions 5.2.1.2 QA program indoctrination 5.2.1.3 Radiological health and safety 5.2.1.4 Industrial safety and fire protection 5.2.1.5 Emergency Plan l
5.2.1.6 Security program l
1 1
l
. -,.~
. FIT 724 sc.w) uuwwx ni.v.
SOUTil TEXAS PROJECT ELECTRIC GENERATING STNflON NO.
Onaper 4.0 4
OPERATIONS QUAIJTY ASSURANCE PLAN QUAIJFICATION, TRAINING AND p3cg 3 op
_4 CERTlFICA~I1ON OF PERSONNEL im envE DA'E 12/21/90 i
P i
5.2.2 Temporary personnel employed at the STPEGS shall be trained in the above areas to the extent necessary to assure satisfactory performance of their duties.
5.3 Specialized Training Programs 5.3.1 NRC licensed operators shall be qualified, trained and certified in accordance with Reference 4.1 and 4.5.
l l
5.3.2 Inspection, testing and examination personnel shall be qualified, trained, and certified in accordance with Reference 4.2.
5.3.3 Nondestructive examination personnel shall receive training which meets the requirements of Reference 4.4 and 4.6.
f 5.3.4 Audit personnel shall be qualified, trained and certified to the requirements of Reference 4.3.
5.3.5 other personnel shall be qualified, trained and o
i' certified commensurate with the functions they f
j perform (e.g., welding, coating, chemical a
R cleaning, maintenance, etc.).
G 5.4 Experienced personnel may be considered for exemption l
n l
l from prerequisite training.
Training exemptions shall B
i be controlled in accordance with approved station 4
f G.
procedures.
5.5 Procedures shall provide for the evaluation of job performance of employees to determine the capabilities of the individual to meet established qualification l
requirements.
.i i
5.6 Procedures shall provide for the recertification of appropriate personnel in accordance with applicable standards.
5.7 Training and certification of personnel, to the degree necessary for the activity, shall be completed prior to assignment of work on quality-related items or activities.
t
~
. sn w e-,
SOUTII TEXAS l'ROJECT ELECFRIC GENERATING STATION nuunut niv.
NO.
Oupirr 4.0 4
OPERATIONS QUAITIY ASSURAN PIAN QUAIJFICATION, TRAINING AND py;g 4 a 4 RTIFICATION OF PERSONNEL rnirlwE DATE 12/21/90 6.0 DOCUMENTATION 6.1 Procedures which are generated as required by this chapter shall identify the records which are required to implement and document those activities.
The records shall be controlled in accordance with Reference 4.7.
7.O ATTACHMENTS 7.1 None
?
l
?
l t
1 I