ML20059K891
| ML20059K891 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/31/1993 |
| From: | Kofron K, Stanczak P COMMONWEALTH EDISON CO. |
| To: | NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BW-93-0282, BW-93-282, NUDOCS 9311160230 | |
| Download: ML20059K891 (14) | |
Text
1
{
C:mm:nwrith Edis;n
/
m.
Braidwood Nuclear Power Station
~ ti fZ....
Route #1, Box 84
.kV Bracevitte, lilinois 60407 I
N Telephone 815/458-2801 November 8, 1993 BW/93-0282 l
Director, Office of Resource Management l
U. S. Nuclear Regulatory Commission l
Washington, D.C.
20555 Attn:
Document Control Desk
Dear Sir:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period October 1 through October 31 1993.
t jn.
. Kof rb(1 Station Manager Braidwood Station KLK/TP/dla Attachments cc:
J. B. Martin, NRC, Region III R. R. Assa, U.S.N.R.C.
Ill. Dept. of Nuclear Safety NRC Resident Inspector, Braidwood INPO Records Center D. L.
Farrar, Nuc Reg. Serv. Mgr.
D. M.
Saccomando, Nuc Lic Admin.
D. R. Eggett, Nuc Eng Dept S. M. Berg, Site V.P.,
Braidwood Nuc Fuel Services, PWR Plant Support Results Eng Group, Sys Eng., Braidwood Nuc Group, Systems Eng., Braidwood i
i I
v 9311160230 931108 8
DR ADOCK 05000456 i 1
__3
BRAIDWOOD NUCLEAR POWER STATION l
UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT t
Commonwealth Edison Company i
NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 t
1
l
~
i 7
l.
MONTHLY REPORT FOR BRAIDWOOD UNIT 1 i
i r
l A.
Summary of Operating Expertence
(
Braidwood Unit i entered the month of October 1993 at 100% capable.
The Unit operated routinely until October 24,1993, when the Unit was j
shutdown for inspection and repair of the 1C steam generator tube leak.
The Unit remained off-line the remainder of the month.
l 1
[
4 l
l i
f l
i I
t t
I i
l o:depts/zd85g!mproct93 wpf
f L
I B.
OPERATING DATA REPORT I
Docket No:
50-456 Unit:
Braidwood 1 l
Date:
11/03/1993 Completed by:
P. Stanczak Telephone:
(815) 458-2801 OPERATING STATUS 1)
Reporting Period:
October 1993 Gross Hours:
745
}
2)
Currently Authorized Power Level (MWt):
3411 l
Design Electrical Rating (MWe-gross):
1175 l
Design Electrical Rating (MWe-net):
1120 l
l Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120 l
r
{
3)
Power level to which restricted (If Any):
None i
4)
Reasons for restrictions (if Any):
None l
This Month Yr to date Cumulative i
5)
Report Period Hours:
745.0 7296.0 46089.0 6)
Hours Reactor Critical:
563.0 6859.3 36376.5 7)
RX Reserve Shutdown Hours:
0.0 0.0 0.0 i
8)
Hours Generator on Line:
563.0 6831.6 35807.3 9)
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 l
10)
Gross Thermal Energy (MWHt):
18653511.2 22044217.2 108945857.2 11)
Gross Elect. Energy (MWH):
648195.0 7636765.0 37425413.0 12)
Net Elect. Energy (MWH):
619138.0 7350904.0 35800599.0 13)
Reactor Service Factor.
75.6 94.0 78.9 14)
Reactor Availability Factor:
75.6 94.0 78.9 15)
Unit Service Factor:
75.6 93.6 77.7 16)
Unit Availability Factor:
75.6 93.6 77.7 17)
Unit Capacity Factor (MDC NET):
74.2 90.0 69.4 18)
Unit Capacity Factor (DER NET):
74.2 90.0 69.4 19)
Unit Forced Outage Rate:
24.4 5.8 9.3 20)
Unit Forced Outage Hours:
182.0 423.0 3659.3 21)
Shutdown Schedule Over Next 6 Months.
Refuel Outage 3/1/94 i
22)
IF Shutdown at End of Reporting Period, Estimated Date of Startup.
11/15/93 o:depts!rd8Sg/mproct93 wpf l
I
t
'I
~
i f
C.
AVERAGE DAILY UNIT NET POWER LEVEL LOG f
Docket No:
50-456 l
Unit:
Braidwood 1 l
Date:
11/03/1993 -
Completed by:
P. Stanczak l
Telephone:
(815) 458-2801 l
i i
MONTH:
October 1993 Day MWe-net Day MWe-net l
1) 1122
- 16) 1144
- j 2) 1116 17) 1108 i
3) 1092
- 18) '
1078 4) 1112 19) 1142
- 5) 1119 20) 1140 *-
6) 1120 21) 1136 *
(
7) 1120 22) 1131
- l 8) 1118 23) 1085 i
9) 1118 24) 199 10) 1093 25)
- 14 11) 1084 26)
- 14 l
14 l
12) 1106 27) l 13) 1119 28)
- 13 j
j 14) 1143
- 29) 13 l
15)
~ 3_8
- 30)
- 14 13 31) i l
l l
- Due to condenser efficiency.
o depts!zdu5g/mproct93 wpf I
l l
1
D.
UNIT SHUTDOWNSIREDUCTIONS Docket No:
50-456 Unit:
Braidwood 1 Date:
11/03/1993 Completed by:
P. Stanczak Telephone:
(815) 458-2801 REPORT PERIOD:
October 1993 Cause & Corrective Action No.
Date Type Hours Reason Method LER Number System Component to Prevent Recurrence 13 931024 F
182 A
1 SB TBG Steam Generator 1C Tube Failure Unit is down for Steam Generator inspection and Repairs.
TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A - Equipment Failure Maint or Test 1 - Manual Exhibit F &
S-Scheduled B - Maint or Test 2 - Manuel Scram Instructions for Preparation C - Refueling 3 - Auto Scram of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report E - Operator Training & Licensee Examination 5 - Reduced Load (LER) File (NUREG -0161)
F - Administration 9 - Other G - Oper Error H - Other o:depts/zd85g/mproct93.wpf
E.
UNIQUE REPORTING REQUIREMENTS - UNIT 1 1.
SAFETYlRELIEF VALVE OPERATIONS Valves No. & Type Plant Description Date Actuated Actuation Condition of Event None 0:depts/zd85g/mproct93.wpf
,. ~. _.. -.. -. -
F.
LICENSEE EVENT REPORTS - UNIT 1 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, October 1 through October 31,1993. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 93-005 10/08/93 Missed Technical Specification Surveillance l
l l
l l
o deptsfrdB5g/mproct93.wpf I
l II.
MONTHLY REPORT FOR BRAIDWOOD UNIT 2 A.
Summary of Operating Experience Braidwood Unit 2 entered the month of October 1993 at approximately 100% capable. The Unit tripped on October 3,1993, as a result of a failed feedwater regulating valve positioner. The positioner was rebuilt and the Unit retumed to service on October 13,1993, operating routinely through the end of the month. The Station continues to monitor RCS activity levels to monitor status of a small fuelleak present since beginning of this refuel cycle.
l l
i i
I i
)
o:depts.td85g/mproct93.wpf
I
\\
B.
OPERATING DATA REPORT 4
Docket No:
50-457 Unit:
Braidwood 2 Date:
11/03/1993
.I Completed by:
P. Stanczak i
Telephone:
(815) 458-2801 OPERATING STATUS 1)
Reporting Period: October 1993 Gross Hours:
745 2)
Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 j
Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120 3)
Power level to which restricted (If Any):
None 4)
Reasons for restrictions (if Any):
None This Month Yr to date Cumulative 5)
Report Period Hours:
745.0 7296.0 44171.0 6)
Hours Reactor Critical:
486.8 5687.6 36850.1 7)
RX Reserve Shutdown Hours:
0.0 0.0 0.0 1
8)
Hours Generator on Line:
496.3 4634.5 36522.3 9)
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10)
Gross Thermal Energy (MWHt):
1449593.1 17575743.6 109588486.6 11)
Gross Elect. Energy (MWH):
497948.0 5962490.0 37419211.0 12)
Net Elect. Energy (MWH):
475496.0 5710541.0 35824577.0 13)
Reactor Service Factor.
65.3 78.0 83.4 2
14)
Reactor Availability Factor 65.3 78.0 83.4 15)
Unit Service Factor; 66.6 77.2 82.7 16)
Unit Availability Factor:
66.6 77.2 82.7 17)
Unit Capacity Factor (MDC NET):
57.0 69.9 72.4 18)
Unit Capacity Factor (DER NET):
57.0 69.9 72.4 19)
Unit Forced Outage Rate:
33.4 4.2 3.8 20)
Unit Forced Outage Hours:
248.7 248.7 1446.0 21)
Shutdown Schedule Over Next 6 Months.
N/A 22)
If Shutdown at end of Repor1ing Period, Estimated Date of Startup:
N/A l
o:deptsad85g/mproct93 wpf i
C.
AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No:
50-457 Unit:
Braidwood 2 Date:
11/03/1993 Completed by:
P. Stanczak.
Telephone:
(815) 458-2801-MONTH:
October 1993 Day MWe-net Day MWe-net 1) 1123
- 16) 642 2) 1124
- 17) 793 3) 62 18) 911 15 19) 993 4) 5)
- 15 20) 1033 6) 15 21) 1117 7) 15 22) 1128
- 8) 15 23) 1130
- 9)
- 15 24) 1120
- 10) 15 25) 1116 11)
- 15 26) 1125
- 1 12)
- 15 27) 1131
- 13) 7 28) 1132
- 14) 285 29) 1133
- 15) 506 30) 1139
- 31) 1140*
Due to condenser efficiency.
l l
o:cepis/rd85p/mproct93.wpf i
t
D.
UNIT SHUTDOWNS / REDUCTIONS Docket No:
50-456 Unit:
Braidwood 2 Date:
11/03/1993 Compiled by:
P. Stanczak Telephone:
(815) 458-2801 REPORT PERIOD:
October 1993 Cause & Corrective Action No. Date Type Hours Reason Method LER Number System Component to Prevent Recurrence 23 931003 F
248.7 A
3 93-007 JB CPOS Positioner failed on feedwater regulating valve 1FWO40. Positioner was rebuilt and the Unit retumed to service.
TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A - Equipment Failure Maint or Test 1 - Manual Exhibit F &
S-Scheduled B - Maint or Test 2 - Manua Scram instructions for Preparation C - Refueling 3 - Auto Scram of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report E - Operator Training & Licensee Examination 5 - Reduced Load (LER) File (NUREG -0161)
F - Administration 9 - Other G - Oper Error H - Other o:depts/zd85g/mproct93.wpf
E.
UNIQUE REPORTING REQUIREMENTS - UNIT 2 1.
SAFETY / RELIEF VALVE OPERATIONS Valves No. & Type Plant Description Date Actuated Actuation Condition of Event None f
o:depts/rd8Sg/mproct93.wpf
l l
F.
LICENSEE EVENT REPORTS - UNIT 2 l
The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, October 1 through October 31,1993. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 93-007 10/28/93 Reactor Trip on 2D Steam Generator due to LO-2 as a result of Main Feedwater Regulating Valve Positioner.
1 l
i l
l I
l i
o:depts!zd85g/mproct93.wpf
_