Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K5681995-12-22022 December 1995 Proposed Tech Specs Re Increase of Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20094D2381995-10-27027 October 1995 Proposed TS Pages 1-6 & 1-7,revising Definitions 1.33, Reactor Enclosure Secondary Containment Integrity & 1.35, Refueling Floor Secondary Containment Integrity.' ML20093E5711995-10-10010 October 1995 Revised TS Page Re Primary Containment Isolation Valves ML20092J3961995-09-18018 September 1995 Proposed TS Table 4.3.1.1-1, RPS Instrumentation SRs & TS Bases 3/4.3.1,changing Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3281995-09-14014 September 1995 Proposed Tech Specs,Removing Secondary Containment Isolation Valve Tables ML20087F9611995-08-10010 August 1995 Revised TS Pages 6-6 & 6-7 ML20087C9531995-08-0101 August 1995 Proposed Tech Specs in Order to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S6131995-07-28028 July 1995 Proposed Tech Specs Reflecting Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation 1999-09-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20203H2501997-12-31031 December 1997 Rev 19 to Odcm ML20198N8061997-12-31031 December 1997 NPDES Permit PA-0052221 Study Plan for Fecal Coliform Bacteria in Pont Pleasant Water Diversion Sys During May- Sept 1998 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20211P9471997-10-15015 October 1997 Revised MSRV Tailpipe Temp Action Plan ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20141K9461997-05-27027 May 1997 PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5 ML20203H2701997-04-30030 April 1997 Rev 18 to Odcm ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20113E0491996-06-28028 June 1996 Technical Basis & Description of Approach for Review Method Selection ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20112C1691996-05-17017 May 1996 Startup Rept Cycle 7 ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities 1999-09-27
[Table view] |
Text
l i
ATTACHMENT 3 LIMERICK GENERATING STATION UNITS 1 AND 2 Docket Nos. 50-352 50-353 License Nos. NPF-39
TECHNICAL SPECIFICATIONS CHANGE REQUEST No. 93-19-0 i
LIST OF AFFECTED PAGES ,
UNIT 1 UNIT 2 5-8 5-8 1
9402020176 940114 PDR ADOCK 05000352 P_- PDR <
i
DESIGN FEATURES DESIGN PRESSURE AND TEMPERATURE' (Continued).
- b. For.a pressure!of:
' I '. 1250 'psig on ~the suction side.of the' recirculation pump'.
- 2. 1500 psig from the recirculation pump discharge to.the outlet.- ,
side of the discharge shutoff valve.
- 3. 1500 psig from the discharge shutoff valve to the jet pumps'.
- c. For.a temperature of 575 F.
VOLUME' -i 5.4.2 The total water and steam volume of the reactor vessel and recirculation system is approximately 22,400 cubic feet at a nominal steam dome saturation. l
. temperature of 547'F. !
'5.5 FUEL STORAGE i CRITICALITY 5.5.1.1 The spent fuel storage racks are designed and shall be maintained'with:
k.,, equivalent to less than or equal to 0.95 when flooded with
- a. A unborated water, including all calculational' uncertainties and biases as described in Section 9.1.2 of the FSAR.
- b. A nominal center-to-center distance between fuel assemblies -
placed in the storage racks of. greater than or equal to 6.25 inches.
5.5.1.2 The k,j, for new fuel for the first core loading stored dry in the 1 spent fuel storage racks shall not exceed 0.98 when aqueous foam moderation o
is assumed.
DRAINAGE :
5.5.2 The spent fuel storage pool is designed and shall be maintained to prevent.
inadvertent draining of the pool below elevation 346'0".
-CAPACITY ;
5.5.3 The spent fuel storage pool is designed and shall be maintained with.a storage capacity limited to no more than 4117 fuel assemblies. l 5.6 COMPONENT CYCLIC OR TRANSIENT LIMIT ;
.5.6.1 The components identified in _ Table 5.6.1-1 are' designed and shall b'e maintained within the cyclic or transient limits of Table 5.6.1-1. '
l LIMERICK - UNIT 1 5-8
.i y ... ._.-
M' .
DESIGN FEATURES . _ _ _ ,
DESIGN PRESSURE AND TEMPERATUP1 (Continued). j
- b. For a pressure of: l
- 1. 1250 psig on the suction side of'the recirculation pump.
- 2. 1500 psig from the recirculation pump discharge to the outlet-side of the discharge shutoff. valve. i
- 3. -1500 psig from the discharge shutoff valve to the jet pumps.
- c. For a temperature of 575 F.
VOLUME :
5.4.2 The total water and steam volume of the reactor vessel and recirculation system is approximately 22,400 cubic feet at a nominal steam dome saturation :
temperature of 547'F. i 5.5 FUEL STORAGE i
CRITICALITY '
5.5.1.1 The spent fuel storage racks are designed and shall be maintained with:
- a. A k ,, equivalent to less than or equal to 0.95 when flooded with j unborated water, including all calculational uncertainties and ~
biases' as described in Section 9.1. 2 of the FSAR, ,
i
- b. . A nominal center-to-center distance between fuel . assemblies 1 placed in the storage racks of- greater than or. equal. to 6.25 inches. '
1 5.5.1.2 The k,,, for new fuel for the first core loading stored dry in the ;
spent fuel storage racks shall not exceed 0.98 when aqueous foam moderation is assumed. ,
DRAINAGE :
5.5.2 The spent fuel storage pool is designed and shall be maintained to prevent
' inadvertent draining of the pool bel'w elevation 346'0".
CAPACITY l
5.5.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 4117 fuel assemblies. l-5.6 COMPONENT CYCLIC OR TRANSIENT LIMIT -
. 5.6.1.The components identified in Table 5.6.1-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.6.1-1.
LIMERICK - UNIT 2 5-8 l i
1 i
i L
I l i ATTACHMENT 2 l '
i HOLTEC INTERNATIONAL LICENSING REPORT .)
SPENT FUEL STORAGE
- CAPACITY EXPANSION FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 i
e SAFETY ANALYSIS REPORT LICENSING REPORT FOR SPENT FUEL STORAGE CAPACITY EXPANSION ,
LIMERICK GENERATING STATION
- /
UNITS 1 AND 2 ;
I Prepared by HOLTEC INTERNATIONAL !
Report No. Hi-931012 !
4
.