Forwards Insp Rept 50-333/93-20 on 930905-1009.No Violations Noted
ML20059K461
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/05/1993
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harry Salmon
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20059K463 List:
References
NUDOCS 9311160068
Download: ML20059K461 (3)


See also: IR 05000333/1993020

Text

_

.

. -

'

-

tf~

nov

51993.

)t

i

'

'

,

.+

..:

,

i

i

Docket No. 50-333

Mr. Harry P. Salmon, Jr.

,

'

Resident Manager

New York Power Authority

James A. FitzPatrick Power Plant

a

Post Office Box 41

Lycoming, New York 13093

SUBJECT:

NRC REGION I INSPECTION NO. 50-333/93-20

This refers to the results of the routine resident safety inspection conducted by Messrs.

_

'

W. Cook and J. Tappert from September 5,1993 to October 9,1993 at James A. FitzPatrick

Nuclear Power Plant, Scriba, New York. A summary of the inspection findings was

presented to you and members of your staff at the conclusion of the inspection.

,

This inspection was directed toward areas important to public health and safety. Areas

l

examined during the inspection are described in the NRC Region I inspection report, which

is enclosed with this letter. _Within these areas, the inspection consisted of _ observation of

,

aciivities, interviews with personnel, and document reviews.

,

Performance by the FitzPatrick staff during this inspection period continued to be good.

Management's decision to reduce reactor power and remove the generator from the grid on-

September 24 prior to troubleshooting the ground on the electro-hydraulic control system was

good. However, more thorough technical review and preparation of the troubleshooting

<

activities may have prevented the unit scram from low power. . We are encouraged by your

,

cautious approach to resolving this complex ground isolation problem, but remain concerned

,

with the adequacy of the technical and engineering support of the troubleshooting effort.

.!

'

Your cooperation with us is appreciated.

s

Sincerely,

OniGINAl. SIGNED BY:

/)h k'e 03y((

g.7

Curtis J. Cowgill, Chief

-

/r'

Projects Branch No.1

-

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report Number 50-333/93-20

,

9311160068 931105

>

.

t

PDR

ADDCK 05000333

/g

G

PDR

^ .V

\\

.

_

-

  • -

NOV

5 1993

-

.

.

~

Mr. IIarry P. Salmon, Jr.

2

cc w/ encl:

t

R. Schoenberger, President

R. Beedle, Executive Vice President - Nuclear

G. Goldstein, Assistant General Counsel

J. Gray, Jr., Director, Nuclear Licensing - BWR

,

Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

i

Director, Energy & Water Division, Department of Public Service, State of New York

K. Abraham, PAO (30) SALP Reports and (2) All Inspection Reports

Public Document Room (PDR)

local Public Document Room (LPDR)

!

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

,

5

D

E

't

i

4

Y

5

.

'

I

!

1

r

Nov

5 1993-

-

-

.

.

L

'

Mr. IIarry P. Salmon, Jr.

3

bec w/ enc 1:

Region I Docket Room (with concurrences)

l

C. Cowgill, DRP

P. Eselgroth, DRP

'

R. Urban, DRP

B. Welling, DRP

B. Cook - FitzPatrick

V. McCree, OEDO

R. Capra, NRR

J. Menning, NRR

B. McDermott, DRP

P

4

s

RI:DRP

RI:DR'

RI:DRP

}\\

10/20/93

1p/f/93

l$/6/93

,

t

)

I

OFFICIAL RECORD COPY

]

a:IR9320