Forwards Insp Repts 50-361/93-39 & 50-362/93-39 on 931206-10.No Violations Noted
ML20059K391
Person / Time
Site: San Onofre  
Issue date: 01/10/1994
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20059K397 List:
References
NUDOCS 9402020074
Download: ML20059K391 (3)


See also: IR 05000361/1993039

Text

.. ;

4

'[.

%

UNITED STATES

g

jN

NUCLEAR REGULATORY COMMISSION

,

,i

REGION V

!

E

  • [

1450 MARIA t.ANE

%,

WALNUT CREEK, CALIFORNIA 94596-5368

January 10, 1994

Docket Nos. 50-361 and 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray

'

Senior Vice President, Power Systems

SUBJECT:

NRC INSPECTION REPORT N05. 50-361/93-39 AND 50-362/93-39

This letter refers to the routine announced-inspection conducted by Mr. C. A.

'

Clark of this office, and Mr. M. Modes of NRC Region I, on December 6 through

December 10, 1993, of activities authorized by NRC Operating License Nos.

NPF-10 and NPF-15. The results of this inspection were provided in-

discussions held by the inspector with Mr. R. Krieger and other members of

your staff on December 10, 1993.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No violations or deviations were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

t

'

S. A. Richards, Acting Director

Division of Reactor Safety and Projects

Enclosure:

-

Inspection Report Nos. 50-361/93-39 and 50-362/93-39

9402020074 940110

-

PDR

ADOCK 05000361

O

PDR.

-

_

-

.

. . _

_ _ _ _

.

.

_ - _ _

_ - -

!

.

'

-

^

f

2

,

t

cc w/ enclosure:

'

Mr._Edwin A.LGuiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

'

T. E. Oubre, Esq., Southern California Edison Company

Chairman, Board of Supervisors, County of San Diego

Mr. Sherwin Harris, Resource Project Manager,-Public Utilities Department

Mr. Charles B. Brinkman, Manager, Washington Nuclear Operations,

!

ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Vice President, Southern California Edison Company

'

Mr. Don J. Womeldorf, Chief, Environmental Management Branch

Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation

j

'

Mr. Robert G. Lacy, Manager Nuclear Department

Mr. Steve Hsu, Radiologic Health Branch

Mayor, City of San Clemente

,

-

l

I

l

$

i

.

I

.

.

]

.

.

. _ _ _ _ _ _ _ _ - - _ - - - - _ - ,

_ _ - _ _ - - _ _ - - - - _ _ _ _ - . - - _ _ - - - _ _ _ _ _ _ _ ____ _______ _ ___ __ _ __ .

..

. . .

i

t

i

3

%

bec w/ enclosure:

Docket File

E Mtut_ W DOS

Resident Inspector

p[l,q

Project Inspector

D f uM ArJ

M. Fields, Project Manager

G. Cook

K. Perkins

S. Richards

B. Faulkenberry

e i - ope s

hI

t

bec w/o enclosure:

M. Smith

D. Clevenger

J. Bianchi

REGION V

,I

gg

IMl

f'@ E4 U~ * Aber 5

C.Cl r

W.Ang

S. Richards

M NcM & I

~

01 fos /94

Ol/iD/94

01/h/94

I // c l'/ "

l

f REQUEST COPY 1 IRE 0 VEST GOPY1 IREWEST COPY 1

I (YES) NO 1I

YES

(NO> 1 I 4YES'

NO 1

V

v'

ISEN070 DCS1 ISEND,TO PDR1

I\\ YESJ NO 1 I /YESI NO 1

_

s. C

File Location: G:\\RSB\\ ENGR \\SO93391R.CC2

-

<

010n 0

2

t

1 i

rAo

. _ - - _ - -

_ _ - _ _ _ _ _ -

_ _ _ _ _ _ - - - _ - - - _ _ - - _ _ - _ _ _ _ -