Text
.. ;
4
'[.
%
UNITED STATES
g
jN
NUCLEAR REGULATORY COMMISSION
,
,i
REGION V
!
E
- [
1450 MARIA t.ANE
%,
WALNUT CREEK, CALIFORNIA 94596-5368
January 10, 1994
Docket Nos. 50-361 and 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention: Mr. Harold B. Ray
'
Senior Vice President, Power Systems
SUBJECT:
NRC INSPECTION REPORT N05. 50-361/93-39 AND 50-362/93-39
This letter refers to the routine announced-inspection conducted by Mr. C. A.
'
Clark of this office, and Mr. M. Modes of NRC Region I, on December 6 through
December 10, 1993, of activities authorized by NRC Operating License Nos.
NPF-10 and NPF-15. The results of this inspection were provided in-
discussions held by the inspector with Mr. R. Krieger and other members of
your staff on December 10, 1993.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No violations or deviations were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
t
'
S. A. Richards, Acting Director
Division of Reactor Safety and Projects
Enclosure:
-
Inspection Report Nos. 50-361/93-39 and 50-362/93-39
9402020074 940110
-
ADOCK 05000361
O
PDR.
-
_
-
.
. . _
_ _ _ _
.
.
_ - _ _
_ - -
!
.
'
-
^
f
2
,
t
cc w/ enclosure:
'
Mr._Edwin A.LGuiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
'
T. E. Oubre, Esq., Southern California Edison Company
Chairman, Board of Supervisors, County of San Diego
Mr. Sherwin Harris, Resource Project Manager,-Public Utilities Department
Mr. Charles B. Brinkman, Manager, Washington Nuclear Operations,
!
ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President, Southern California Edison Company
'
Mr. Don J. Womeldorf, Chief, Environmental Management Branch
Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation
j
'
Mr. Robert G. Lacy, Manager Nuclear Department
Mr. Steve Hsu, Radiologic Health Branch
Mayor, City of San Clemente
,
-
l
I
l
$
i
.
I
.
.
]
.
.
. _ _ _ _ _ _ _ _ - - _ - - - - _ - ,
_ _ - _ _ - - _ _ - - - - _ _ _ _ - . - - _ _ - - - _ _ _ _ _ _ _ ____ _______ _ ___ __ _ __ .
..
. . .
i
t
i
3
%
bec w/ enclosure:
Docket File
E Mtut_ W DOS
Resident Inspector
p[l,q
Project Inspector
D f uM ArJ
M. Fields, Project Manager
G. Cook
K. Perkins
S. Richards
B. Faulkenberry
e i - ope s
hI
t
bec w/o enclosure:
M. Smith
D. Clevenger
J. Bianchi
REGION V
,I
gg
IMl
f'@ E4 U~ * Aber 5
C.Cl r
W.Ang
S. Richards
M NcM & I
~
01 fos /94
Ol/iD/94
01/h/94
I // c l'/ "
l
f REQUEST COPY 1 IRE 0 VEST GOPY1 IREWEST COPY 1
I (YES) NO 1I
YES
(NO> 1 I 4YES'
NO 1
V
v'
ISEN070 DCS1 ISEND,TO PDR1
I\\ YESJ NO 1 I /YESI NO 1
_
s. C
File Location: G:\\RSB\\ ENGR \\SO93391R.CC2
-
<
010n 0
2
t
1 i
rAo
. _ - - _ - -
_ _ - _ _ _ _ _ -
_ _ _ _ _ _ - - - _ - - - _ _ - - _ _ - _ _ _ _ -