ML20059J843

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 94-02 W/Util on 940125 Re Enforcement Conference to Discuss NRC Operational Safety Team Insp Findings
ML20059J843
Person / Time
Site: Oyster Creek
Issue date: 01/11/1994
From: Stephen Pindale
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9402010213
Download: ML20059J843 (3)


Text

s

/

JM 11199d No. 94-02 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee: General Public Utilities Nuclear Corporation (GPUN)

Facility: Oyster Creek Nuclear Generating Station Docket No.: 50-219 Time and Date: 10:00 a.m., Tuesday, January 25, 1994 location: DRP Conference Room King of Prussia, PA

Purpose:

ENFORCEMENT CONFERENCE TO DISCUSS THE NRC OPERATIONAL SAFETY TEAM INSPECTION FINDINGS NRC Attendees: R. Cooper, Director, Division of Reactor Projects (DRP)

L. Doerflein, Chief, Reactor Projects Branch No. 4, DRP J. Kennedy, Acting Chief, Reactor Projects Section No. 4B, DRP P. Kaufman, Project Engineer, Reactor Projects Section No. 4B, DRP L. Briggs, Senior Resident Inspector, Oyster Creek S. Pindale, Resident Inspector, Oyster Creek A. Dromerick, Project Manager, PD I-4, NRR Licensee Attendees: J. Barton, Vice President and Director, Oyster Creek G. Busch, Manager, OC Licensing A. Rone, Tech Functions Site Director, OC P. Scallon, Manager, Plant Operations NOTE: This meeting is closed to the public for observation. Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., January 21,1994 via telephone call to Janet Kennedy, Region I, at FTS 8-215-337-5146.

Handicapped persons requiring assistance to attend or participate in this meeting shall make their requests known to Janet Kennedy, USNRC, Region I, 475 Allendale Rd., King of Prussia, PA 19406, (215) 337-5146, no later than two business days prior to the meeting.

Prepared by: 7 A M1 Sitph'e'n hi. Pindale, Acti'ng Chief Reactor Projects Section 4B, PB4, DRP I

310059 I 9402010213 940111 b/s C'.

PDR ADOCK 05000219 '

Q PDR

/

Distribution (Via E-Mail):

J. Taylor, Executive Director for Operations (EDO)

J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. Grimes, Director, Division of Operating Reactor Support, NRR C. Rossi, Director, Reactor Inspection & Licensee Performance, NRR J. Lieberman, Director, Office of Enforcement S. Lewis, Office c,f the General Counsel (OGC)

T. Murley, Director, Office of Nuclear Reactor Regulation W. Russell, Associate Director for Inspection and Technical Assessment, NRR L. Callan, Acting Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR J. Calvo, Assistant Director for Region I Reactors, NRR S. Bajwa, RPEB/NRR W. Dean, Regional Coordinator, OEDO N. Green, Jr., Policy Development and Technical Support Branch J. Stolz, Project Directorate, NRR A. Dromerick, Project Manager, NRR NRC Resident Inspector Oyster Creek Region I Branch Chiefs Region I Section Chiefs K. Abraham, Public Affairs Officer, RI D. Screnci, Field Public Affairs Officer, RI M. Miller, State Liaison Officer, RI C. Gordon, State Agreements Officer, RI  ;

K. Smith, Regional Attorney, RI D. Holody, Enforcement Officer, RI B. Letts, Office of Investigations, Region I Field Office J. l2nning, DRP, RI P. Jefferson, DRMA, RI

s Distribution:

Public Document Room (PDR)

Imal Public Document Room (LPDR)

State of New Jersey Regional Administrator Secretary, RI DRP Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Projects Branch No.1, Secretary, RI Region I Receptionist l

l l

l l

\

l i

RI:DRP Rogge 1/ /94 1

- - - - _ - - - - _ - _ - - - - _ - - _