Espresses Concerns Re Decommissioning Activities Appearing to Take Place at Plant Before Decommissioning Plan Is Approved
ML20059J773
Person / Time
Site: Yankee Rowe
Issue date: 11/16/1993
From: Olver J
HOUSE OF REP.
To: The Chairman
NRC COMMISSION (OCM)
Shared Package
ML20059J760 List:
References
CCS, NUDOCS 9402010165
Download: ML20059J773 (1)


Text

1

,,,JQHN,W. O. LVE.R

,,,s.C waNmYo=~ "ocN*cs SNfoY

,=,273;;>;,,

C0 amis "7.1"2.,"

Congregg of tfje hitch 6tates ZZ ,*a'.

FOREIGN OPERATIONS.

[13)532-70O "t, ore ~t:fr=a Douse of Representatibes

'4'>">>-a " -

TKEASURV POSTAL SERytCE Cours peoenat 8vicomo Wasfp,ngton, BC 20515-2101

,,,',, c;-l'; $';g',,

A~o ci~em covia=uiat t4131442494 0 i

44131443-2792 Fan 881 a ss

,a g, FifCsetuaG. MA 014?C November 16, 1993 d', '34$'Yd"an s'o

.1' a c.

2.

Ivan Selin Chairman i

Nuclear Regulatory Commission Washington, DC 20555

Dear Chairman Selin,

I am writing to express my concern over the fact that decommissioning activities appear to be taking place at Yankee Atomic Electric Company's Rowe plant before a decomissioning plan is approved.

I am well aware of the benefits which could accrue from the component removal project (CRP).

I also understand that the commission has determined that the CRP meets all current regulatory requirements.

However, the CRP certainly represents activitiep, i.e.

removal of steam generators and reactor internals, L'that are only undertaken in the event of decommissioning.

It seems a reason-able position to me that the CRP should have occurred after the i

approval of a decomissioning plan.

Alternatively, given the time constraints, it would have made sense to subject the CRP to a limited public coment period, since the decommissioning plan itself will be subject to public comment.

I am sure the commission is aware of the substantial public concern over the CRP.

I believe it would have been helpful to all -- the crunmisaion, the local residents, and even Yankee Atomic -- to have taken the opportunity to listen to and address local concerns.

I strongly urge the commission to commit to holding public hearings on the decommissioning plan for the Rowe plant after it is filed.

,/Si cer ly, ohn W. Olver 940201o165 931220 PDR COMMS NRCC CORRESPONDENCE PDR PRINTfD ON MECYCL(D PAPER

._:_.. au w. :.-... :

t e

l CONGRESSIONAL CORRESPONDENCE SYSTEM DOCUMINT PREPARATION CEECKLIST i

This checklist is he submitted with each document (or group of Qs/As) seat for.

ing into the CCS.

1.

BRIEF DESCRIPTION OF DOCUMENT (5)

/2 2.

TYPE 0F* -

corres h Isariaggy(GSW m 3.

DOCUMENT coursos sensitive (3 sac Only)

Non-Samait've i

4.

CONGRESSIONAL COMMITTEE and SUBCOMMITTEES (if applicable)'

congressional committee l

1 subcommittee 5.

sUnsECT cones (a)

(b)

(c) l s.

SOURCE OF DOCUMENTS l

(a) 5520 (document name.

(b) sean..

(c)

Atlashments (d)

Rakey (e)

Otheir 7.

SYSTEM S DATES (a)

/.7 Date.ocE seat.doouseat to ces (b)

Data ccs.Esseivonsdoonssat (e)

Data returned to och for additional information (4)

Data resubmitted by-oca to ces

~

I (el cate entered into ces by (f)

Date oCA notified that document is in CCS l

8.

COMMENTS l

l.

.