Responds to NRC Requesting Summary of Evaluations & Responses Prepared to Assess Disposition of Error Notices Received from Boeing Computer Services
ML20059J297
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/17/1994
From: Cross J, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To: Norrholm L
Office of Nuclear Reactor Regulation
References
NUDOCS 9401310426
Download: ML20059J297 (2)


Text

m.

i e

F_

s E aemes e.GeneralElectricConpany Pottland Cross Vice President and Chief Nuclear Officer Januasy 17,1994 Trojan Nuclear Plant Docket 50-344 L.icense NPF-1

.i Mr. Leif J. Norrholm Chief, Vendor Inspectbn 1 ranch Division of Reactor inmect >n and Licensee Performance Office of Nuclear Reactoi kegulation U.S. Nuclear Regulatory Commission Washington, DC 20555 c

Dear Mr. Norrholm:

D.ijppfition of Error Notices Received from B_ceing Compsler Serviggs The purpose of this letter is to respond to a request for information from the NRC concerning the disposition of error notices received from Boeing Computer Services. In a letter dated December 16,1993, the NRC requested a summary of evaluations and responses prepared to assess the

+

subject error notices transmitted by Boeing Computer Services.

The Trojan Nuclear Plant was permanently defueled in January 1993 and the facility was issued a possession only license on May 5,1993. The current plant status of Trojan relative to this information request was discussed in a teleconference with Mr. Walter Haass, NRC Vendor inspection Branch. Mr. llaass indicated that the NRC was requesting this information in an efrort to assess the disposition of these error notices. As a result of the termination of power operation at Trojan and the receipt of the possession only license, Mr. Ilaas stated that it would not be necessary for Portland General Electric to compile the requested summary of evaluations and responses.

i 9401310426 940117 I

'h PDR ADOCK 05000344 i

- / fI S

PDR i.

j ysummmw a mcm.nwm w ncusu w

L. J. Norrholm

+

January 17,1994 W

Although a summary of evaluations and responses will not be prepared, Portland General Electric will verify that the error notices do not adversely impact the safe storage ofirradiated fuel at Trojan. This verification is scheduled to be completed by March 31,1994.

Sincerely, S. M. Quennoz for J. E. Cross c:

Mr. Ken E. Perkins Acting Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. II. D. Chaney Region V Project Manager U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Document Control Desk i