ML20059H900
| ML20059H900 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/06/1990 |
| From: | Nandy F SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9009190082 | |
| Download: ML20059H900 (4) | |
Text
.
u c f((
a L
Southern California Edison Company J
{
-t{
23 PARKER STREET IRVINE, CALIFORNIA 92718
'I t
~ F. R. NANDY TELEPHONE'
- MANAGER. NUCLE AR LICENSING '
(714) 597 6400 '
a
. September 6, 1990' 1
q U. S. Nuclear Regulatory Commission Attention:. Document Control-Desk' l
'~
-Washington, D.C. 20555 a
i
Subject:
- Docket No. 50 206
. Report of NPDES Permit Violation, Jul 1990; j
Sm Onofre Nuclear Generating Station, Unit 17 '
Reference:
Letter from H. W. Newton (SCE) to A212 CoeL(Califdrnia' Regional
~
- Water Quality Control
- Board, San Diego Region),L" NPDES:
Monitoring Report" for Unit 1, dated August 29,1990-As required by Technical Specification (TS) 6.16.2.c, Provisional Operating License' DPR-13, enclosed is a copy of the referenced letter forwarding the July 1990 National Pollutant Discharge Elimination' System (NPDES) monitoring report' for Unit 1.-
The July Unit 1 NPDES monitoring report stated that:.'(1) on July 11,.thel Unit 1 -
sewage treatment plant effluent sample' pH of. 5.6 was outside the! NPDES permit -
limit of between 6-9 pH; and, (2) on July 27, the MESA sewage treatment plant
)
effluent sample pH of S.5 was outside the NPDES permit limit of between _6_9 pH.
_ The remaining 8 water sources sampled during these occasions, however, were ~
D L
found to be within NPDES permit limits.
la?
[,
l:
Li
't_
9009190082 900906 I
PDR ADOCK 05000206
'l S
'1 7
Ok 2
~ ?N - - -
N
.m
's at s ;
g-m y.
Document Control Desk L 2
_ September 6, 1990 i,
There were no NPDES violations in Units 2 and 3 in July 1990. If you require any1 additional information, please let me know.
s V$ry truly yours,.
{
f d
'I I
.. j Enclosure j
1 J. B. Martin l(Regional Administrator, NRC Region V) 1 cc:
C. W. Caldwell (NRC Senior Resident Inspector,, Units 1,2 and 3)s j
J.- E. Tatum (NRR SONGS Project: Manager)-
l I
.j il s
i I
a 1
L L
L 1
4
.l t
{
)
'O 1
.l 1
O' 4
q-j
,,m.
',A k ',
')
+4;
.I Southern California Edison Company -
W5
$ AN ONOPRE NUCLE AR GENER ATING ST ATION 4
3 P.O. D D R 13 4 '
S AN C LkVENTE, C A LIPORNI A 93472 p
- ).
August 29, 1990~
-)
i 1
Mr. Arthur L..Coe,~ Acting Executive Officer y
. California Regional Water; Quality _ Control Board j9 San Diego Region 9771'Clairemont Mesa Boulevard,: Suite B 1
. i H
San ~Diego, California' 92124-13311
]
r
Dear ~Mr. Coe:
Subject:
NPDES Monitoring Report H
San Onofre Nuclear Generating Station, UnitJ1L The NPDES monitoring report for:SanLonofre Unit 1Lcovering thei month: of July is submitted in accordance with the 'requirementseof.,
CRWQCB Order 88-001 (NPDES Permit No.'CA0001228)'.. A summa'ryfof l
the generating unit's status andisignificant analytica1Tresults; is provided below.
The unit. continued its shutdown for refueling and:maintenancek All sampled. water' sources were found.to'be within: permit limits,L with the.following exceptions., The Unit 11 sewage treatmentiplant!
had low pH on' July.12, while'the Mesa. sewage treatment plantLhadL lot pH on July -27.
The Unit 1 pH depression-_in theLUnit 1 phut.
seems to be associated with the digester on the' south 1t' rain'.;;The-
. digester has been operating at low pH and.the supernatant l.
depresses the activated sludge'pHEand:the final effluentt A'
. combination of process-_ changes and chemical' treatment of.the-digester are being used.to,bringLthe 141 backLinto an acceptable range.
The Mesa plant ~pH'has!been corrected by using the. smaller process train.
The cause seemszto have been a reductioniin' flow,
'resulting;in long detention times and.pH reduction due'to-i,
}
nitrification.
L Pursuant tol Order No.88-001, Reporting Requirement.12, the..
y" Efollowing representative iscauthorized-to. sign and: certify all
" reports required'by this order:
Arthur.Kneisel,~Environmentali Engineer.
i k
s.
O L
.) [
.. L
->a 4
4,
-r"
.s
~-
? -"
Mr. Arthur L. Coe August 29, 1990 1
.I certify uh3er penalty of. law'that I have personally examined and am familiar with the'information submitted in the attached document, and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate,.and' complete.
I-am:
aware that there are'significant penalties for submitting false information, including the-possibility of fine and imprisonment.
L Sincerely,-
/
i
. W. Newton Manager, Site Support Services l
.l Enclosure cc:
Envitonmental Protection Agency, Region IX
.)
i P
l 1
s 4
_-