ML20059H826

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Rev 9 to Point Beach Nuclear Plant Security Plan.Changes Consistent W/Provisions of 10CFR50.54(p) & Acceptable Except as Noted in Encl of Ltr
ML20059H826
Person / Time
Site: Point Beach  
Issue date: 11/05/1993
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Maxfield G
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9311100235
Download: ML20059H826 (4)


Text

,nsfe 40

> n, NOV - 51993 Docket No. 50-266 Docket No. 50-301 o

Wisconsin Electric Power Company ATTN: Mr. Greg Maxfield Manager, Point-Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 24241 1

i

Dear Mr. Maxfield:

.a

SUBJECT:

REVIEW 0F-POINT BEACH SECURITY ~ PLAN SUBMITTAL

-}

This acknowledges receipt of your letter dated August 10, 1993, which I

transmitted' changes identified as Revision 9 to the Point Beach Nuclear' Plant SE.curity~ Plan submitted under the provisions Lof 10 CFR 50.54(p).-

We have reviewed the submitted changes and have. determined that they are j

consistent with the provisions of 10 CFR 50 54(o) and are therefore 7

acceptable, except as noted in the enclosure of this letter? For those: items 1

identified as unacceptable'under the criteria'.of 10 CFR~ 50.54(p), thel

,y previously approved plan revision must be followed.- The containment acces's issue and. weapons qualification issue have been forwarded to NRC Headqu'arters

l (NRR/RSGB) and you will be notified of the results of their review by separate correspondence.

~

~

j

~

You are requested to provide corrections to your. security plan-to ad' dress Lthe letter.

You may submit the changes either in accordance with 10 CFR:50.54(p).

j issue identified in the enclosure within two months after receipt of. this-

-i z

'or 10 CFR 50.90.

i The enclosure to your letter contained Safeguards Information'of a type a

specified in 10 CFR 73.21 and is being withheld from;public disclosure.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy-of:

. this letter.will be p1 aced in the NRC Public Document-Room.

t 1

q l

i 99o}

l V

s o

100043 1

9311100235 931105 F

I PDR-ADDCK 05000266 Y F.

.PDR

[k?

i Wisconsin Electric Power 2

N OV 5 1933 Company-1 The response requested by this letter is not subject to the clearance procedure of the Office of Budget and Management as required by the' Paperwork 1

Reduction Act of 1980, PL96-511.

Sincerely,

Original :.ignM Ly CeMtia D. Nusca" i

Cynthia D. Pederson, Chief Reactor Support Programs Branch 1

' i

Enclosure:

Review Comments l

i cc w/ enclosure:

See Attached List bec w/ enclosure:

NRR/DRIS/RSGB SG Case File No. W70ll4.30WA; W70ll5 31WA SG Inspector File: Madeda-SG Correspondence File:

G. M. Christoffer NRR Docket File l

i i

RIII '

RIII RIII/

RIII RII

,p s Chrip offer /jp Ma eda d

Tongue Pe erson 11lfl93 nj$jy' aj;jg3 aj@}

r 1

v

1 i

l 6

POINT BEACH NUCLEAR PLANT

~!

SECURITY PLAN REVISION NO. 9 REVIEW COMMENTS t

Section Pace Review Comments l

PBNPSP 6.5 1

Section 2.0.

PBNPSP 2.2., Section-1.4.1 is referenced as providing a1 description of the access control system. 'There is no such section.

State the correct reference section.

j i

e

-l i

i

'f i

i I

i

?

6 r

'I b

_ ;4 - - -*

_y e POINT BEACH Docket No. 50-266 Docket No. 50-301 cc:

Mr. Bruce Churchill, Esq..

6 haw, Pittman, Potts, and Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037 Manager Point Beach Nuclear Plant 4

Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks si Route 3 Two Rivers, Wisconsin 54241 i

Chairman i

Public Service Commission.

of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 U.S. Nuclear Regulatory Commission Resident Inspector Office 6612 Nuclear Road Two Rivers, Wisconsin 54241 f

t l