L-93-014, Forwards Security Plan as Identified in .Plan Withheld
| ML20024H850 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/10/1993 |
| From: | Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PBL-93-0144, PBL-93-144, NUDOCS 9308260133 | |
| Download: ML20024H850 (1) | |
Text
n Wisconsin SAFEGUARDS INFORMATION 1
.6CinC POWER COMPANY i
Point Beoch Noceor Plant 6610 Nuclear Ra.Two Rivers. VA 54241 (414) 755-2321 PBL 93-0144 August 10, 1993 U.
S.
Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, D.C.
20555 DOCKETS 50-266 AND 50-301
$JfURITY PIAN EQINT BEACH NUCLEAR PI. ANTS. UNITS 1 AND 2 Gentlemen:
Enclosed please find the requested changes as identified in your letter cf April 7,
1993, and as a result of subsequent follow-up discussions with NRC Region III and headquarter personnel.
The changes are being submitted in accordance with the provisions outlined in Title 10 Code of Federal Regulations, Section 50.54 (P).
Sincerely,
..O Greg Maxfield Manager-PBNP The subiect matter of the enclosgre to this letter is SAFEGUARDS INF0FraTION and is considered to be exempt from disclosure in accordance with 10 CFR Parts 1.
- 50. 70. and 73.
When seoarated. this oace is not SAFEGUARDS INF0FraTION.
ejp Yy SAFEGUARDS INFORMATION
[bO I
I
.(
r 9308260133 930810 L
PDR ADOCK 05000266 F.
PDR j.
. AsubsWmolHiuvnsmExm Corjastam
. = -