Proposed Tech Specs Re Surveillances Associated W/Edgs
ML20059H807
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/02/1993
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20059H796 List:
References
NUDOCS 9311100220
Download: ML20059H807 (10)


Text

. _ _ ._.

.. a

,g i

i ATTACHMENT (1) .

i a

UNIT 1 TECHNICAL SPECIFICATION REVISED PAGES- -;

3/48-4  !

3/48-5 f

3/48-8 t

I i

1b r ,

9311100220.931102 I? ' ~l PDR -ADOCK'05000317 ht  :

P PDR g2 1i

v 3/4.8 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) .

2. For the 59 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per a hours thereafter during use by verifying correct breaker alignments and indicated power availability; and
b. Demonstrated OPERABLE at least once per 18 months during shutdown by manually transferring unit power supply from the normal circuit to the alternate circuit.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. At least once per 31 days on a STAGGERED TEST BASIS by:
1. Verifying the fuel level in the day fuel tank.
2. Verifying the fuel level in the fuel storage tank.
3. Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.

a =Sem 9.

4. Verifying the diesel starts and ac::1:r:ts: to :t 1::st 360 ,

7 ith generator voltage and and 5011.2 Hz, respectively., frequency S 341601420 volts

5. Verifying the generator is synchronized, loaded to 11250 kW, and operates for 160 minutes.
6. Verifying the diesel generator is aligned to provide standby power to the associated emergency bussas.
7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load clock within i 10's of its design interval.
5. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM 0975-81 when checked for viscosity, water and sediment.

All engine starts for the purpose of this Surveillance Recuiren;ent may be prececed by an engine prelude period and/or other warnuo procedures recormlended by the manufacturer so that mechanical wear and stress on the diesel engine is minimizec. '

CALVERT CLIFFS - UNIT 1 3/4 8-4 Amencment No. 4&

~

.3/4.8LELECTRICALPOWERSYSTEMS ~

G SURVEILLANCE REQUIREMENTS-(Continued) .;

c. . ' At least once per'184 days' by verifying the diesel . starts Lfrom '

ambient. condition and accelerates to at least 900 rpm in ,

<10 seconds.y

_ l

/uew/s r/ra:ent.

.d . At least once per DJ months by:

t

1. Subjecting the diesel to an inspection in accordance with j procedures prepared in conjunction with its manufacturer's-  !

recommendations- for this class of standby service. -  !

2. Verifying the generator capability to reject a load of-' i 1500 hp without tripping. t i
3. Simulating a loss of offsite power in conjunction with a j safety. injection actuation test signal, and. ,

a) -Verifying de-energization of the emergency ' usses c and  ;

load shedding from the emergency. busses. i b) Verifying the. diesel starts from ambient? condition on the ~  !

auto-start signal, energizes the emergency busses.with  !

pemanently connected loads, energizes the auto-connected.  ?!

emergency loads through the load sequencer and operates .

for 15 minutes while its generator is loaded with the j emergencyloads.p- l q j

c) Verifying that the high Jacket coolant temperature and low Jacket- coolant pressure trips are automatically .

bypassed on a Safety Injection ~ Actuation Signal

4. Verifying the diesel generator operates for l' 60 minutes while loaded' to 12500 kW.
5. Verifying that the auto-connected loads to each diesel l generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 3340-W. j -l T. ca,J }

chose /  ;

gmk

.~z~ dst /T* A .

,s f

j 4

)

.CALVERT CLIFFS - UNIT 1 3/4 8-5 Amendment No. & l

.l J

3/4.8 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be ,

demonstrated OPERABLE by the perfarnance of each of the Surveillance g Requirements of 4.8.1.1.1 and 4.3.1.1.2 except for Requi rements 4.8.1.1.2.a.5, f. g././. z. a. 7 g g,s. A 2. /z -

. and f 8, Asj. / f P

L e

i CALVERT CLIFFS - UNIT I 3/4 8-8 Amendment No. 4 ;

e INSERT A l i

All engine starts for the purpose of this surveillance requirement may be preceded by an engine p,re-lube period recommended by  ;

the manufacturer so that mechameal wear and stress on the diesel  ;

engine is minimized.  ;

i e

i a

4 r

a f

5 1

b P

h 3

?

-i

. _ . ,. . . . . - - . ~ ,, ... . - . .

~ r n e  ! -

(

}

e, 3 s

.+ . ,

g.

< x,.-

.{

'l A_TI'ACHMENT (2) c:

f

,I i

1 UNIT 2 .'

a

- TECHNICAL SPECIFICATION '

REVISED PAGES

)f 3/48-4 j 3/48 il t f

3/48-8-- ,

t r

'b r

4 6

I i

i f

i

. ~ . ,,. . ,, . ~ . - .

~!

l 3/4.8 ELECTRICAL POWER SYSTEMS

, SURVEILLANCE REQUIREMENTS (Continued)

2. For the 69 kV SMECO offsite power- circuit, within' one hour of-  !

substitution ~ for a 500 kV offstte power circuit, and at least ' i once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct- '

breaker alignments and indicated power availability; and .;

, b. Demonstrated OPERABLE at least once per 18 months' during shutdown.

, by manually transferring unit power supply from the nonnal circuit to the alternate circuit. .

1 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE- 1

a. At least once per 31 days on a STAGGERED TEST BASIS by:.  !
1. Verifying the fuel level in the day fuel tank. '[

q

2. Verifying the fuel level in the fuel storage tank. >i
3. Verifying the fuel transfer pump can be started and transfers  !

fuel from the storage system to the day tank. -

-l ac.4)eres a- .

1

4. Verifying the diesel starts and ac ' .. ._. :: :t k..t %3 .

.A ith generator voltage and 4160 1 420 volts and 6011.2 Hz, respectively., frequency atof j

5. Verifying the generator is synchronized, loaded to 31250 kW, and operates for 160 minutes.

i

6. Verifying the diesel generator is aligned to provide standby '

power to the associated emergency busses. i

7. Verifying that the automatic load sequencer timer is OPERABLE-with the interval between each load block within-110% of its i design interval. 1 l
b. At least once per 92 days by verifying' that a sample'of diesel  ;

fuel from the fuel storage tank is within the acceptable limits j specified in Table 1 of ASTM D975-81 when checked for viscosity, l water and sediment.

-l L

.I i

All engine starts for the purpose of this Surveillance Recuirement'  !

may be preceded by an engine trelube period and/or. other wannuo '

procedures Tecommended by the manufacturer so that mecnanical wea--

and stress on'the diesel engine is minimizec. j j

CALVERT CLIFFS - UNIT 2 3/4 8-4 Amencment No. M9-  !

q

- :s i

3/4.8 ELECTRICAL POWER SYSTEMS

~

SURVEILLANCE REQUIREMENTS (Continued) .j

l'
c. At least once per 184 days by verifying the diesel starts from -

ambient condition and accelerates to at least 900 rpm in ,

510 seconds. -)k Noetod6 MidML 1

d. At least once per gmonths by: ]

l

1. Subjecting the diesel to an inspection in accordance with :j procedures prepared in conjunction with its manufacturer's  ;

recomendations for this class of standby service. -!

l

2. Verifying the generator capability to reject a load of- j 3,500 hp without tripping. 1 i
3. Simulating a loss of offsite power in conjunction with a  !

safety injection actuation test signal, and:

]

a) Verifying de-energization of the emergency busses and- j load shedding from the emergency busses. j b) Verifying the diesel starts from ambient condition on the l auto-start signal, energizes the emergency busses with  !

permanently connected loads, energizes the auto-connected -  !

emergency loads through the' load sequencer and operates ,

for > 5 minutes while its generator is loaded with the emergency loads. #-

c) Verifying that the high jacket coolant temperature and  ;

low jacket coolant pressure trips are automatically . .!

bypassed on a Safety Injection Actuation Signal.

4. Verifying the diesel generator operates for t.60. minutes ]

while loaded to 1 2500 kW. j

5. Verifying that the auto-connected loads to each diesel. i generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of GNHHeW. I eac. 4 - ,

dese// 1 y.edeA of j

-ChseAr A i

.i l

CALVERT CLIFFS - UNIT 2 3/4 8-5 Amendment No.i.9 - -

]

3/4.8 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be o demonstrated OPERABLE by the performance of each of the Surveillance , ~,

Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for Requi rements 4.8.1.1.2a.5, y' g. A s.' z. rg. y y g, ,, e,,' g ,g ,y .

4'2.A/.7.d.s.

>0 t

i v

5 i

CALVERT CLIFFS - UNIT 2 3/4 B-8 Amendment No. 45+-

. \

i

'l' INSERT A t

All engine starts for the purpose of this surveillance requirement may be preceded by an engine pre-lube period recommended by the manufacturer so.that mechamcal wear and stress on the diesel engine is minimized.

i i

?