f "%y
[
UNITED STATES f.I Mi j NUCLEAR REGULATORY COMMISSION
'gg s
wasmNcToN. o c. 20sssum November 1, 1993 Docket No. 50-245 l
Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company 1
Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT 1 - ISSUANCE OF AMENDMENT AND REVOCATION OF EXEMPTION FROM 10 CFR 50, APPENDIX J (TAC NO. M87156)
The Commission has issued the enclosed (Enclosure 1) Amendment No. C7 - to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit 1, in response to your application dated July 27, 1993.
Included in the July 27, 1993, letter, Northeast Nuclear Energy Company (NNECO) requested that an exemption, granted on May 10, 1985, for containment air lock testing, be !
eliminated.
4 By letter dated May 10, 1985, the NRC granted, pursuant to 10 CFR 50, Appendix J, three exemptions.
Specifically, the NRC granted exemptions concerning Type A testing of penetrations with expansion bellows, main steam isolation valve testing, and containment air lock testing.
The third exemption, air lock testing at 10 psig, is an exemption to paragraph III.D.2(b)(ii) of 10 CFR 50, Appe ' dix J, which requires testing at P, (maximum accident pressure or 43 psig) prior to entering a mode in which primary containment integrity is reop red.
NNECO requested this exemption to allow the deferral of the full prcuure test until after the last containment entry is made during startup.
8 In the July 27, 1993, letter, NNECO proposed to eliminate the exemption concerning containment air lock testing and reword the description of the May 10, 1985, Appendix J exemption, which is described in Millstone Unit 1 Operating License Section 2.D(2), to delete the reference to low pressure tests of the containment access air locks. The NRC granted exemptions concerning Type A testing of penetrations with expansion bellows and main steam isolation valve testing will remain unchanged.
In addition, NNECO proposed to:
(1) replace Technical Specification Section 4.7.A.3.d(2) with wurding consistent with paragraph III.D.2(b) of 10 CFR 50, Appendix J, and (2) revise the Technical Specification Bases Section 4.7. A to state that personnel air lock door seal testing is performed in accordance with 10 CFR 50, Appendix J requirements.
Accordingly, based upon the approved Technical Specification change and the future compliance with 10 CFR 50, Appendix J, paragraph III.D.2(b) requirements, the exemption for containment air lock testing is herein revoked (Enclosure 2). The enclosed safety evaluation (Enclosure 3) documents the NRC j,j staff's review of the issue.
.c 04ooss me at W n
9311100196 9312o2 (3
~
DR ADOCK 05000245 I'
PDR v
Mr. John F. Opeka November 1,1993 The Revocation of Exemption is being forwarded to the Office of.the Federal' Register for publication. The notice of issuance of amendment will be included in the Commission's biweekly Federal Reaister notice.
Sincerely, Original signed by:
John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.67 to DPR-21 2.
Revocation of Exemption 3.
Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION:
Docket File NRC & Local PDRs PDI-4 Plant TMurley FMiraglia JPartlow ERossi JLieberman SVarga JCalvo JStolz SNorris JAndersen RBarrett OGC DHagan
'EJordan VMcCree GHill (2)
CGrimes ACRS (10)
OPA i
i OC/LFDCB LDoerflein
- See previous concurrence i
orncE LA:PDI-4 PM:PDI-4*
SCSB*
D:PDI-4*F OGC*
Sho JAndersen RBarrett JStolz CPW NAME DATE f f / / /93 9/14/93 10/5/93 LT//R/93 10/14/93 orncE AD:DRPE*
NME JCalvo DATE
]O/28/93
/ /
/ /
/-/
OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\ANDERSEN\\87156 s
~
Mr. John F. Opeka Novenber 1, 1993 r
The Revocation of Exemption is being forwarded to the Office of the Federal Register for p9blication. The notice of issuance of amendment will be 7
included in the Commission's biweekly Federal Reaister notice.
t Sincerely, i
Jo n F. Stolz, Directo P ject Directorate I 4 i
ivision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No. 67 to DPR-21 2.
Revocation of Exemption t
3.
Safety Evaluation cc w/ enclosures:
See next page i
l 1
4 4
e
~
Mr. John F. 0peka Millstone Nuclear Power Station-Northeast Nuclear Energy Company Unit I cc:
Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post ~0ffice. Box 270 i
Hartford, Connecticut 06103-3499 Hartford,-Connecticut 06141-0270 W. D. Romberg, Vice President J. P. Stetz, Vice President Nuclear Operations Services Haddam Neck Plant Northeast Utilities Service Company Connecticut Yankee Atomic Pmeer Conpany Post Office Box 270 362 Injun Hollow Road Hartford, Connecticut 06141-0270 East Hampton, Connecticut 06424-3099 Kevin T. A. McCarthy, Director Regional Administrator Monitoring and Radiation Division Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 79 Elm Street 475 Allendale Road Post Office Box 5066 King of Prussia, Pennsylvania 19406-Hartford, Connecticut 06102-5066 Allan Johanson, Assistant Director First Selectmen Office of Policy and Management Town of Waterford Policy Development and Planning Division Hall of Records 80 Washington Street 200 Boston Post Road..
Hartford, Connecticut 06106 Waterford,. Connecticut 06385-j S. E. Scace, Vice President P. D. Swetland, Resident 1 Inspector-Millstone Nuclear Power. Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U.S. Nuclear Regulatory Commission i
. Post Office Box 128 Post Office Box 513' Waterford, Connecticut 06385 Niantic, Connecticut 06357 i
H. F. Haynes, Nuclear Unit Director
.J. M. Solymossy, Director I
Millstone Unit No. I Nuclear Quality and Assessment Services l
Northeast Nuclear Energy Company Northeast Utilities Service Company Post Office Box 128 Post Office Box 270 Waterford, Connecticut 06385 Hartford, Connecticut 06141-0270 Nicholas S. Reynolds Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502
~
'J
-