ML20059H107
| ML20059H107 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 01/19/1994 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Tuetken R COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20059H111 | List: |
| References | |
| NUDOCS 9401260261 | |
| Download: ML20059H107 (2) | |
See also: IR 05000295/1993023
Text
,
.
,
..
,
s
i
MN 191994
.
Docket Nos. 50-295; 50-304
Commonwealth Edison Company
ATTN: Mr. R. Tuetken
Site Vice President
Zion Nu-lear Generating Station
101 Shiloh Boulevard
Zion, IL 60099
Dear Mr. Tuetken:
SUBJECT:
ROUTINE RESIDENT INSPECTION REPORT AND NOTICE OF VIOLATION
This refers to the routine safety inspection conducted by J. D. Smith,
M. J. Miller, V. P. Lougheed, and S. G. DuPont of this office from
November 24, 1993, through January 6, 1994. This inspection included a
review of activities authorized for your Zion Nuclear- Generating Station. At
the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observation of activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern because it illust. rates'a
failure to verify the satisfactory performance of safety equipment.
Appropriate criteria.were not rigorously developed and applied, creating'a
potential for unsatisfactory equipment performance to be unrecognized and
i
un;orrected.
In addition, this . demonstrates a need to ensure that the plant
design basis information is documented and disseminated to all plant employees
who a ed it.
In addition,.during this inspection period, certain other of your activities-
appeared to be in violation of NRC requirements. Specifically,-a technical
.i
specification surveillance was missed and offsite review of a safety
evaluation was not performed. However, as described in the enclosed
inspection report (section 8), you identified these violations. Therefore,
the violations will not be subject to enforcement action because your efforts
in ' identifying and correcting the violations met the criteria specified in-
Section VII.B.2 of the " General Statement of Policy and Procedure for NRC
Enforcement Actions" (Enforcement Policy, 10 CFR Part 2, Appendix C).
9401260261 940119
ADOCK 05000295
G
2500U7
,
9
Commonwealth Edison Company
2
JAN 191994
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this Notice, including your proposed
corrective actions and the results of future inspections, the NRC will
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
iE[ d.ccn y ~'c&ta
"
"o
n
Edward G. Greenman, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report
i
No. 50-295/93023(DRP)
No. 50-304/93023(DRP)
cc w/ enclosure:
L.0. DelGeorge, Vice President,
Nuclear Oversight and Regulatory Services
T. Broccolo, Station Manager
S. Kaplan, Regulatory Assurance
Supervisor
D. Farrar, Nuclear Regulatory
Services Manager
0C/LFDCB
Resident Inspectors, Byron,
Braidwood, Zion
Richard Hebbard
J. W. h affrey, Chief, Public
'.".i iities Division
Mayor, City of Zion
Licensing Project Manager, NRR
Robert Newmann, Office of Public
Counsel
,
State Liaison Officer, Wisconsin
!
State Liaison Officer
Chairman, Illinois Commerce
Commission
bec: PUBLIC