ML20059G784

From kanterella
Jump to navigation Jump to search
Notification of 940127 Meeting W/Util in Rockville,Md to Discuss Util Methodology for Defining Seismic Hazard Curves & Seismic Fragilities as Part of Ipee for Plant,Units 2 & 3
ML20059G784
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/14/1994
From: Fields M
Office of Nuclear Reactor Regulation
To: Quay T
Office of Nuclear Reactor Regulation
References
NUDOCS 9401250286
Download: ML20059G784 (5)


Text

.

January 14, 1994 D'ocket No. 50-361 and 50-362 MEMORANDUM FOR:

Theodore R. Quay, Director l

Project Directorate V Division of Reactor Projects III/IV/V FROM:

Mel B. Fields, Project Manager l

Project Directorate V Division of Reactor Projects III/IV/V

SUBJECT:

FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON TO DISCUSS THE SEISMIC PORTION OF THE IPEEE FOR SAN ON0FRE UNITS 2 AND 3 DATE & TIME:

Thursday, January 27, 1994 9:30 am - 11:30 am LOCATION:

U.S. NRC One White Flint North 11555 Rockville Pike Rockville, MD 20852 Room 10-B-11 l

PURPOSE:

To discuss Southern California Edison's methodology for defining the seismic harzard curves and seismic fragilities as part of the IPEEE for San Onofre, Units 2 and 3.

PARTICIPANTS *:

NRC Southern California Edison l

G. Bagchi S. Medling, et. al.

l N. Chokshi J. Chen M. Drouin R. Rothman R. Hernan Original signed by:

Mel B. Fields, Project Manager Project Directorate V i

Division of Reactor Projects III/IV/V cc: See next page l

l DISTRIBUTION:

See next page

  • Meetings between NRC technical staff and applicants or licensees.are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058,6/28/78.

Contact:

Mel B. Fields (301) 504-3062 1

0FFICE PDV/LA PDV/PM PDV/D NAME EBarnhill90 MField'$

TQuay s

l DATE

/ // S/94

/ // b/94

(//3/94 0FFICIAL RECORD COPY DOCUMENT NAME: SOMTGNOT.127 hh DR

January 14, 1994-I Docket No. 50-361 and 50-362 MEMORANDUM FOR:

Theodore R.-Quay, Director Project Directorate V Division of Reactor Projects III/IV/V FROM:

Mel B. Fields, Project Manager Project Directorate V Division of Reactor Projects III/IV/V l

SUBJECT:

FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON TO DISCUSS THE SEISMIC PORTION OF THE IPEEE FOR SAN ONOFRE l

UNITS 2 AND 3 i

DATE & TIME:

Thursday, January 27, 1994 9:30 am - 11:30 am i

LOCATION:

U.S. NRC One k, Pe Flint North 11555 hockville Pike Rockville, MD 20852 Room 10-B-11 PURPOSE:

To discuss Southern California Edison's methodology'for defining the seismic ~harzard curves and seismic fragilities as part of the IPEEE for San Onofre, Units 2 and 3.

PARTICIPANTS *:

NRC Southern California Edison G. Bagchi S. Medling, et. al.

N. Chokshi J. Chen

'l M. Drouin R. Rothman R. Hernan Original signed by:

Mel B. Fields, Project Manager i

Project Directorate V Division of Reactor Projects III/IV/V cc:

See next page DISTRIBUTION:

See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties i

to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058,6/28/78.

Contact:

Mel B. Fields (301) 504-3062 0FFICE PDV/LA PDV/PM PDV/D

,s NAME EBarnhill '

MFields[I TQuay 7 5

DATE

/

./94

/ // '/94 l//J/94 0FFICIAL RECORD COPY DOCUMENT NAME: SOMTGNOT.127

. g**"%g t

l'

[k UNITED STATES i#

E NUCLEAR REGULATORY COMMISSION

%; %. (/

WASHINGTON. D.C. 20555 4 001 January 13, 1994 Docket No. 50-361 and S0-362

\\

MEMORANDUM FOR:

Theodore R. Quay., Director Project Directorate V Division of Reactor Projects III/IV/V l

FROM:

Mel B. Fields, Project Manager l

l Project Directorate V j

Division of Reactor Projtcts III/IV/V i

SUBJECT:

FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON 4

TO DISCUSS THE SEISMIC PORTION OF THE IPEEE FOR SAN ONOFRE i

UNITS 2 AND 3 l

l DATE & TIME:

Thursday, January 27, 1994 l

9:30 am - 11:M am LOCATIC N:

U.S. NRC One White Flint North 11555 Rockville Pike l

Rockville, MD 20852 Room 10-B-11 l

PURPOSE:

To discuss Southern California Edison's methodology-for defining the seismic harzard curves and seismic' fragilities as part of the IPEEE for San Onofre, Units 2 and 3.

PARTICIPANTS *:

NRC Southern California Edison G. Bagchi S. Medling, et. al.

N. Chokshi J. Chen M. Drouin R. Rothman R. Hernan Q /N y f $o Mel B. Fields, Project Manager Project Directorate V Division of Reactor Projects III/IV/V i

cc: See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058,6/28/78.

Contact:

Mel B. Fields (301) 504-3062

Southern California Edison Company San Onofre Nuclear Generating Station, Unit Nos. 2 and 3 cc:

T. E. Oubre, Esq.

Mr. Thomas E. Bostrom, Project Manager Southern California Edison Company Bechtel Power Corporation Irvine Operations Center 12440 E. Imperial Highway 23 Parker Street Norwalk, California 90650 Irvine, California 92718 i

Mr. Robert G. Lacy Chairman, Board of Supervisors Manager, Nuclear Department County of San Diego San Diego Gas & Electric Company i

I F Pacific Highway, Room 335 P. O. Box 1831

!an D ego, California 92101 San Diego, California 92111 i

Alan R. Watts, Esq.

Mr. Steve Hsu Riurke & Woodruff Radiologic Health Branch 710 S. Parker St. No. 7000 State Department of Health Services Orange, California 92668-4702 Post Office Box 942732 i

Sacremento, California 94234 Mr. Sherwin Harris Resource Project Manager Resident Inspector / San Onofre NPS Public Utilities Department c/o U.S. Nuclear Regulatory Commission City of Riverside Post Office Box 4329 3900 Main Street San Clemente, California 92674 Riverside, California 92522 Mayor 1

Mr. Charles B. Brinkman, Manager City of San Clemente Washington Nuclear Operations 100 Avenida Presidio ABB Combustion Engineering Nuclear Power San Clemente, California 92672 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. R. W. Krieger, Vice President 1450 Maria Lane, Suite 210 Southern California Edison Company Walnut Creek, California 94596 San Onofre Nuclear Generating Station P. O. Box 128 Mr. Harold B. Ray San Clemente, California 92674-0128 Senior Vice President Southern California Edison Company Mr. Don J. Womeldorf Irvine Operations Center Chief, Environmental Management Branch 23 Parker Street California Department of Health Services Irvine, California 92718 714 P Street, Room 616 Sacramento, California 95814 Mr. Edwin A. Guiles Vice President Engineering and Operations San Diego Gas & Electric Company 101 Ash Street San Diego, California 92112

DISTRIBUTION - Routine Meetina Notice

)

~ Docket File ~

.l NRC & Local PDRs PDV Reading File T. Murley/F. Miraglia L. J. Callan, Acting J. Roe E. Adensam T. Quay M. Fields E. Barnhill B. Grimes, 11E4 i

A. Chaffee, EAB, llAl' i.

OGC, 15B18-E. Jordan, 3701 E. Rossi, 9A2 Receptionist, OWFN l

NRC Participants l

ACRS,(10),P315 OPA, 2G5 NRR Mailroom, PMAS, 12G18 C. Grimes, OTSB, llE22 J. Johnson, Acting, PRA J. Mitchell, 17G21 l

K. Perkins, RV G. Cook, RV i

i t

i r

l

[

f ' h b) 5 ' h b

4Fo l-

11.0