ML20059G205
| ML20059G205 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/30/1993 |
| From: | Gibson A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beard P FLORIDA POWER CORP. |
| Shared Package | |
| ML20059G208 | List: |
| References | |
| EA-93-307, NUDOCS 9401240046 | |
| Download: ML20059G205 (3) | |
See also: IR 05000302/1993016
Text
.
.
..
.
.
%
DEC 3019m
Docket No. 50-302
License No. DPR-72
EA 93-307
Florida Power Corporation
Mr. P. M. Beard, Jr. (NA2I)
Sr. VP, Nuclear Operations
ATTN:
Mgr., Nuclear Licensing
15760 West Power Line Street
Crystal River, FL 34428-6708
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-302/93-16
,
This refers to the inspection conducted by George T. Hopper of this office on
November 15-19 and December 6-10, 1993. The inspection included a review of
activities authorized for your Crystal River 3 facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report. The
inspection focused on your Emergency Operating Procedures. Within these
,
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, six apparent violations were
identified and are being considered for escalated enforcement action in
accordance with the " General Statement of Policy and Procedure for NRC
'
Enforcement Actions (Enforcement Policy)," 10 CFR Part 2, Appendix C.
These
violations indicate a lack of effective oversight in the development,
verification, and validation of your new Emergency Operating Procedures.
Accordingly, no Notice of Violation is presently being issued for these
inspection findings. Please be advised that the nunber and characterization
of apparent violations described in the enclosed inspection report may change
as a result of further NRC review.
An enforcement conference to discuss these apparent violations has been
scheduled for January 11, 1994, per telephone conversation between K. Landis,
. NRC, . Region II and R. McLaughlin, Florida Power Corporation on December 22,
1993. The purposes of this conference are to discuss the apparent violations,
their causes and safety significance; to provide you the opportunity to point
out any errors in our inspection report; to provide an opportunity for you to
present your proposed corrective actions; and to discuss any other information
that will help us determine the appropriate enforcement action in accordance
with the Enforcement Policy.
You will be advised by separate correspondence
of the results of our deliberations on this matter. No response regarding
these apparent violations is required at this time.
9401240046 931230 ~
{DR
ADOCK 05000302
kl
PDR'
- _-
..
.. -
.
.
.
Florida Power Corporation
2'
OEC30 sg3
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
<
this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by Johns P. Jaudon for)
'
Albert F. Gibson, Director
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/ encl:
Gary L. Boldt
Vice President, Nuclear Production
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
B. J. Hickle, Director
Nuclear Plant Operations
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
,
.R.
C. Widell, Director
Nuclear Operations Site Support
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
Gerald A. Williams
Corporate Counsel
Florida Power Corporation
'
MAC - ASA
P. O. Box 14042
St. Petersburg, FL 33733
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee, FL 32304
cc w/ encl cont'd:
(See page 3)
,
f
a
.
.
.
.
. .
.
.
.
-.
_
.
.
'
Florida Power Corporation
3
DEC 3 015g3
'
cc w/ enc 1 cont'd:
,
Bill Passetti
Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee, FL 32399-0700
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee, FL 32399-2100
Chairman
Board of County Commissioners
Citrus County
110 N. Apopka Avenue
Inverness, FL 36250
Robert B. Borsum
B&W Nuclear Technologies
1700 Rockville Pike, Suite 525
i
Rockville, MD 20852-1631
bcc w/ encl:
K. Landis, RII
)
J. Jaudon, DRS
G. Hallstrom, DRS
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
i
6745 N. Tallahassee Road
'
Crystal River, FL 34428
ae
/
RII:DRS
RII:DRS
RII:
RII M
RII:DRP
j
GH
r:gh/fr
LL)wyer
TPedles
KLindis
M
ule
12/37/93
12/_ #3
12/g/93
12//J /93
12/%/93
1
R I DRP
RII: 1
RII:0RA
kl
.
VW
CV' '
_.
'
EM rschoff
G' en ns
CEvans
1Gibgon
1/d93
12/g93
v/cmun{s
12/gl/93
12/p/9
Document name:
g:\\la\\ crystal \\EOP9320.GTH