ML20059G170
| ML20059G170 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 11/01/1993 |
| From: | Ring M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Donnelly P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20059G173 | List: |
| References | |
| NUDOCS 9311080025 | |
| Download: ML20059G170 (2) | |
See also: IR 05000155/1993018
Text
r-
e
.
November 1, 1993
Docket No. 50-155
Consumers Power Company
ATTN: Mr. P.M. Donnelly
Plant Manager
Big Rock Point Nuclear Plant
10269 US 31 North
Charlevoix, MI 49720
Dear Mr. Donnelly:
This refers to the inspection conducted by Ms. K. Shembarger and Mr. D. McNeil
of this office during the week of October 18, 1993. The inspection included a
review of authorized activities for your Big Rock Point Nuclear Plant. We
discussed our inspection findings with Mr. G. Withrow and members of your
staff at the exit interview on October 22, 1993.
The purpose of the inspection was to review the content and evaluate the
effectiveness of your licensed operator requalification training program.
The inspection consisted of a review of program implementing procedures and
representative records, interviews with station personnel, review of .the
requalification exam material administered during the current and previous
modules, and observation of the requalification exams administered during the
inspection week.
Certain of your activities appeared to be in violation of NRC requirements, as
specified in the enclosed Notice of Violation (Notice). The violation
involved a failure to provide all requalification training to all licensed
operators for the 1991/1992 requalification training program.
A written response is required and you should follow the instructions
specified in the enclosed notice.
In your response, you should document the
specific actions taken and any additional actions you plan to take to prevent
recurrence. After reviewing your response to this Notice, including your
proposed corrective actions and the results of future inspections, the NRC
will determine whether further NRC enforcement action is necessary to ensure
compliance with NRC regulatory requirements.
'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of-
this letter, the enclosures, and your response will be placed in the NRC
Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
'
required by the Paperwork Reduction Act of 1980, PL 96-511.
1
0500'3
i
93110B0025 931101
ADDCK 05000155
G
/$L/C -/ f 2
.
.
Consumers Power Company
2
November 1. 1993
"
<
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
I
Original signed by Mark A. Ring
Mark A. Ring, Chief
Operations Branch
Enclosures:
I.
2.
Inspection Report
No. 50-155/93018(DRS)
3.
Simulator Facility Report
cc w/ enclosures:
David P. Hoffman, Vice President
Nuclear Operations
OC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Big Rock Point, LPM, NRR
SRI, Palisades
W. Hodges, RI
i
A. Gibson, RII
1
S. Collins, RIV
K. Perkins RV
B. Boger, RCHF, NRR
J. S. Wermiel, HFAB, NRR
R. Gallo, OLB, NRR
bec:
PUBLIC - IE42
,
,
cf
RIII
RI
RJII
RIII
uns
<\\'
. c.
Shembarger
J
$ Th
ips
ig
i
IO/X/93
10/2(/93
10/ /93
-
/93