Forwards Insp Rept 50-155/93-18 on 931018-25 & Notice of Violation.Violation Involved Failure to Provide Requalification Training to All Licensed Operators for 1991/ 1992 Requalification Training Program
ML20059G170
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/01/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20059G173 List:
References
NUDOCS 9311080025
Download: ML20059G170 (2)


See also: IR 05000155/1993018

Text

r-

e

.

November 1, 1993

Docket No. 50-155

Consumers Power Company

ATTN: Mr. P.M. Donnelly

Plant Manager

Big Rock Point Nuclear Plant

10269 US 31 North

Charlevoix, MI 49720

Dear Mr. Donnelly:

This refers to the inspection conducted by Ms. K. Shembarger and Mr. D. McNeil

of this office during the week of October 18, 1993. The inspection included a

review of authorized activities for your Big Rock Point Nuclear Plant. We

discussed our inspection findings with Mr. G. Withrow and members of your

staff at the exit interview on October 22, 1993.

The purpose of the inspection was to review the content and evaluate the

effectiveness of your licensed operator requalification training program.

The inspection consisted of a review of program implementing procedures and

representative records, interviews with station personnel, review of .the

requalification exam material administered during the current and previous

modules, and observation of the requalification exams administered during the

inspection week.

Certain of your activities appeared to be in violation of NRC requirements, as

specified in the enclosed Notice of Violation (Notice). The violation

involved a failure to provide all requalification training to all licensed

operators for the 1991/1992 requalification training program.

A written response is required and you should follow the instructions

specified in the enclosed notice.

In your response, you should document the

specific actions taken and any additional actions you plan to take to prevent

recurrence. After reviewing your response to this Notice, including your

proposed corrective actions and the results of future inspections, the NRC

will determine whether further NRC enforcement action is necessary to ensure

compliance with NRC regulatory requirements.

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of-

this letter, the enclosures, and your response will be placed in the NRC

Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

'

required by the Paperwork Reduction Act of 1980, PL 96-511.

1

0500'3

i

93110B0025 931101

PDR

ADDCK 05000155

G

PDR

/$L/C -/ f 2

.

.

Consumers Power Company

2

November 1. 1993

"

<

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

I

Original signed by Mark A. Ring

Mark A. Ring, Chief

Operations Branch

Enclosures:

I.

Notice of Violation

2.

Inspection Report

No. 50-155/93018(DRS)

3.

Simulator Facility Report

cc w/ enclosures:

David P. Hoffman, Vice President

Nuclear Operations

OC/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Big Rock Point, LPM, NRR

SRI, Palisades

W. Hodges, RI

i

A. Gibson, RII

1

S. Collins, RIV

K. Perkins RV

B. Boger, RCHF, NRR

J. S. Wermiel, HFAB, NRR

R. Gallo, OLB, NRR

bec:

PUBLIC - IE42

,

,

cf

RIII

RI

RJII

RIII

uns

<\\'

. c.

Shembarger

J

$ Th

ips

ig

i

IO/X/93

10/2(/93

10/ /93

-

/93