ML20059G072

From kanterella
Jump to navigation Jump to search

Forwards Amend 66 to License DPR-21 & Safety Evaluation. Amend Increases Max Stroke Time for RWC Sys Isolation Valves CU-2,3,5 & 28 from 18 to 20 in TS 3.7.1
ML20059G072
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/27/1993
From: Andersen J
Office of Nuclear Reactor Regulation
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059G073 List:
References
TAC-M87157, NUDOCS 9311050277
Download: ML20059G072 (3)


Text

.

~

October 27, 1993 n.

Docket No. 50-245

-i Mr. Jchn Opeka Executivt e President, Nuclear Connectir lankee Atomic Power Company 7

Northeast nuclear Energy Company

-Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

[

SUBJECT:

ISSUANCE OF AMENDMENT (TAC N0. M87157)

The Commission has issued the enclosed Amendment No. 66 to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit 1, in response to your application dated July 26, 1993.

l The amendment increases the maximum stroke time for reactor water cleanup system isolation valves CU-2, 3, 5, and 28 from 18 seconds to 20 seconds 'in-6 Technical Specification Table 3.7.1.

A copy of the related Safety Evaluation is also enclosed.

The notice of

[

issuance will be included in the Commission's biweekly Federal Reaister notice.

Sincerely, j

4 Original sioned by Alan Wang

+

for: James W..Andersen, Acting Project Manager Project Directorate I-4

$k kbbck o!00b245 Division of Reactor Projects - I/II p

PDR Office of Nuclear Reactor Regulation-Enclosures 1.

Amendment No. 66 to DPR-21

'i 2.

Safety Evaluation CC W/ enclosures:

See next page DISTRIBUTI0ft.

iDocket FileJ RBarrett OC/LFDCB NRC' & bical' PDRs OGC LDoerflein RGI 4

PDI-4 Plant DHagan SVarga GHill t rr s 0)290052 NRC HLECBIEB OWY 3

JAndersen OPA

  • SEE PREVIOUS CONCURRENCE j

o m CE LA:PDI-4*

PM:PDI-4*

BC:SCSB*

D:PID-4*

OGC*

NAME SNorris JAndersen:bp RBarrett JStolz RBachmann-i DATE'

'9/16/93 9/16/93 10/6/93 10/7/93 10/12/93 OfflCIAL RECORD COPY-

} 'l i'

Document Name: G:\\ANDERSEN\\87157

.{

4

1. ~

. / "*%

[

UNIVED STATES

[ [i 4 [%

j NUCLEAR REGULATORY COMMISSION jy j

WASHINGTON. O C. 70%$ 0001 s

s October 27, 1993 Docket No. 50-245 Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

ISSUANCE OF AMENDMENT (TAC NO. M87157)

A The Commission has issued the enclosed Amendment No. 66 to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit 1, in response to your application dated July 26, 1993.

The amendment increases the maximum stroke time for reactor water cleanup system isolation valves CV-2, 3, 5, and 28 from 18 seconds to 20 seconds in Technical Specification Table 3.7.1.

i A copy of the related Safety. Evaluation is also enclosed. The notice of issuance will be inclejed in the Commission's biweekly Federal Reaister i

notice.

Sincerely, b,ht bQw

.hg JamesW.Andersn,NActing Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 66 to DPR-21 2.

Safety Evaluation cc w/ enclosures:

See next page

i Mr. John F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit 1 cc:

Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President J. P. Stetz, Vice President Nuclear Operations Services Haddam Neck Plant Northeast Utilities Service Company Connecticut Yankee Atomic Power Company Post Office Box 270 362 Injun Hollow Road Hartford, Connecticut 06141-0270 East Hampton, Connecticut 06424-3099 Kevin T. A. McCarthy, Director Regional Administrator i

Monitoring and Radiation Division Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 79 Elm Street 475 Allendale Road Post Office Box 5066 King of Prussia, Pennsylvania 19406 Hartford, Connecticut 06102-5066-Allan Johanson, Assistant Director First Selectmen Office of Policy and Management Town of Waterford Policy Development and Planning Division Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Vice President P. D. Swetland, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U.S. Nuclear Regulatory Commission

'l Post Office Box 128 Post Office Box 513 1

Waterford, Connecticut 06385 Niantic, Connecticut 06357 i

H. F. Haynes, Nuclear Unit Director J. M. Solymossy, Director l

Millstone Unit No. 1 Nuclear Quality and Assessment Services Northeast Nuclear Energy Company Northeast Utilities Service Company j

Post Office Box 128 Post Office Box 270

{

Waterford, Connecticut 06385 Hartford, Connecticut 06141-0270

)

Nicholas S. Reynolds Winston & Strawn 1400 L Street, NW Washington, DC 20005-350E i

l l

I