ML20059F993

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-220/93-22 & 50-410/93-22 on 931004-20.No Violations Noted
ML20059F993
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 01/05/1994
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20059F998 List:
References
GL-89-10, NUDOCS 9401210040
Download: ML20059F993 (3)


See also: IR 05000220/1993022

Text

~'

ggi 5

w

,

r-

_

m\\

.

,-

% /m , .

m

x

%'

,

_

r

.

,

-

"

,.

w,

.yp3c, -

w

,g

,R

' q:;

'

.

"

.

~

LJAN

5 1994

a

.;

-

,

.i

I

. .

._ .

.

.

,

Docket Nos. - 50-220:

50-410-.

,

1

'

- Mr. B. Ralph Sylvia '-

,t

Executive Vice President'- Nuclear

i

!l '

' Niagara Mohawk Power Corporation

.

I

' 301 Plainfield Road

l.

Syracuse, New York 13212

.

s

Dear Mr. Sylvia:

cr

,

"

- SUBJECT: COMBINED INSPECTION NUMBERS 50-220/9' 22 AND 50-410/93-21

This letter refers to the announced safety inspection conducted by 'Mr. P. Drysdale and

-

others of this office from October 4 to 8,1993. The inspectors reviewed the program:

Jng

i

implemented in response to NRC Generic Letter (GL) 89-10, " Safety-Related

F

- Motor-Operated Valve Testing and Surveillance." At the conclusion of the onsite inspection,

y'

the results were discussed with Mr. M. McCormick and other members of your staff at the

b

Nine Mile Point station. ; The inspection concluded with a telephone conference on

p

December 14,1993, between Mr. M. Jones of your staff and Region I personnel to

,

t'

follow up on the results of motor-operated valve m xiifications and dynamic tests conducted -

during the recent refueling outage at Unit 2.

,

3g

.The areas covered in this inspection are important to public health and safety and are -

[

j$

described in the enclosed report. Within those areas, the inspection included reviews of-

_

W

'

-

.

4

. selected documents, interviews of Niagara Mohawk personnel, and direct observations of

plant equipment during motor-operated valve testing in Unit 2.

.

lNo response to this letter is required. - Your cooperation with~ us in this matter is appreciated.

1

,

'

Sincerely, -

L

m ;gua aimed N L

i

}gg

Jacque P. Durr, Chief

Engmeering Brance

.

Division of Reactor Safety

9

'

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-220/93-22 and

l

50-410/93-21

,

.,

'l

m

94o1210040 940105

-(

'

'

yr ^=" *

8MB

(

s

-

w

a

.

-

.

.

.

_ - . _

_ _ _ - - _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ - - -

.

JAN

5 1994

.

Niagara Mohawk Power

2

-:

Corporation

cc w/ encl:

C. Terry, Vice President - Nuclear Engineering

M. McCormick, General Manager, Safety Assessment, Licensing & Training

K. Dahlberg, Unit 1 Plant Manager

J. Mueller, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Energy & Water Division, Department of Public Service, State of New York .

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

HRC Resident Inspector

ftate of New York, SLO Designee

l

l

l

i

1

._

- _ _ _ _ _ _ _ _ _

.._

. . . . -

.

_

.

.

..

.-.-. .. .

I

?JAN

5 1994

-.

Niagara Mohawk Power

3

Corporation

bec w/ encl:

Region I Docket Room (with concurrences)

,

C. Cowgill, DRP

'

L. Nicholson, DRP

D. Weaver, DRP

B. Norris - Nine Mile Point

i

bec w/enci (Via E-Mail):

V. McCree, OEDO

R. Capra, NRR

-

<

J. Menning, NRR

D.' Brinkman, NRR

I

i

i

RI:DRS

I1. RS

RI:DRS

'

Drysdale

n

Durr

'

1/f794

12/22/93

12f)43

OFFICIAL RECORD COPY

A:NM932221.1NS

i

-

~

.

.

.

._

. , . ,