See also: IR 05000440/1993022
Text
.o.
Dc.b\\be6
UMi 0 71994
Docket No. 50-440
Centerior Service Company
ATTN: Mr. R. A. Stratman
Vice President
Nuclear
Perry
c/o The Cleveland Electric Illuminating
Company
10 Center Road
Perry, OH 44081
Dear Mr. Stratman:
(
This refers to the inspection conducted by Messrs. R. Langstaff, J. Gavula,
A. Vegel, and D. Kosloff of this office, on October 29 through December 18,
1993. The inspection included a review of activities authorized for your
Perry Nuclear Power Plant, Unit 1, facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in'the enclosed report.
Areas examined during the inspection are identified in the report. 'Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in_ the enclosed Notice of
Violation (Notice).
This violation is of concern because safety-related
equipment was allowed to remain inoperable in violation of Technical
Specifications due to multiple errors by licensed personnel in the control
room. Although 10 CFR 2.201 requires you to submit to this office, within 20
days of your receipt of this Notice, a written statement of explanation, we
_
note that this violation had been corrected and those actions were reviewed
during this inspection.
Therefore no response with respect to this matter is
required,
jb
'
l
9401140158 940107
{DR
ADOCK 05000440
a
.,
t
.
.
'
i
,
Centerior Service Company
2
JAN 0 71994
f
During this inspection, certain other of your activities appeared to be in
violation of NRC requirements. However, as described in the enclosed
inspection report, you identified this violation. Therefore, the violation
'
will not be subject to enforcement action because your efforts in identifying.
and correcting the violation met the criteria specified in Section VII.B of
the " General Statement of Policy and Procedure for NRC Enforcement Actions"
(Enforcement Policy), 10 CFR Part 2, Appendix C.
The non-cited violation-
involved personnel errors, which are a continuing NRC concern at Perry.
~
!
An additional personnel error during a surveillance activity is being
evaluated as an unresolved item. This item is of concern because it involved
a temporary loss of containment integrity.
Several other personnel errors
<
were identified in the plant support area.
This indicates that management and
.!
individual workers need to intensify their efforts to minimize personal
i
errors. Material found in the drywell by the inspectors and poor housekeeping
conditions observed in the steam tunnel at the end of the fall maintenance
,
outage also indicate a need for increased individual attention to plant
housekeeping.
i
In accordance with 10 CFR 2.790 of the Commission'.s regulations, a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
L. R. Greger, Chief
Reactor Projects Branch 3
Enclosures:
1.
2.
Inspection Report
No. 50-440/93022(DRP)
<
See Attached Distribution
)
fiD
hl
t
Ril
Rlli
RIIIb
RIII,i
R1 I
RIII
,
Sc weibinz L
ury
J.
c d ma
rger
a d er
0
an
G
-
&
(Pa a
),
t{1 9
\\
4
- /
hc
(Paraga/
lI*%w am
/r
o-
d
Burgess
,
[/
(Para. 9.c)
(Para. 9.c)
(Para. 2)
I-2-1Y
,
. _ .
.
-
-
_.
_
_
_
. _ . . _ .
^
. -
.
!
!
+
Centerior Service Company
3
i
g o, , . , _ . . ,
< in,
i
Distribution
,
cc w/ enclosures:
R. W. Schrauder, Director, Perry
i
Nuclear Services Department
'
D. P. Igyarto, General Manager,
Perry Nuclear Power Plant
K. R. Pech, Director, Nuclear
Assurance' Department
,
H. L. Hegrat, Manager,
-
Licensing and Compliance Section
'
N. L. Bonner, Director, Perry
.i
Nuclear Engineering Department
H. Ray Caldwell, Director,
Nuclear Activities
i
H. J. Miller, Deputy Regional
Administrator
a
Licensing Fee & Debt Collection
'
Branch
Resident Inspector, RIII
Terry J. Lodge, Esq.
James R. Williams, State of Ohio
Robert E. Owen, Ohio
Department of Health
A. Grandjean, State of Ohio
Public Utilities Commission
bec:
PUBLIC
J. A. Gavula
-
j
^
s
,
_
. . ,