TABLE 3.3-3 (Continued)
TABLE NOTATION Trip function may be blocked in this MODE below the P-ll (Pressurizer Pressure Interlock) Setpoint.
- 7 Trip function automatically blocked above P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.
The provisions of Specification 3.0.4 are not applicable.
One in Separation Group 1 and one in Separation Group 4.
- The de-energization of one train of B0P ESFAS actuation logic and actuation relays renders two of the four channels inoperable. Action Statement 21 applies to both Functional Units 6.c and 6.g in this case.
l
- The provisions of Specification 3.0.4 are not applicable in Modes 5 and 6.
Only the shutdown portion of one sequencer is required to be OPERABLE in Modes
+
5 and 6 which corresponds to the OPERABLE Emergency Diesel Generator.
Operability is only required for associated OPERABLE bus in Modes 5 and 6.
++
l ACTION STATEMENTS ACTION 14 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.
ACTION 15 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required ANANLOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
ACTION 16 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the byo*.ss condition and the Minimum Channels OPERABLE requirement is met.
One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1 ACTION 17 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge supply and exhaust valves are maintained closed.
CALLAWAY - UNIT 1 3/4 3-20 Amendment No. 24,64,69,85 Correction letter of 1/6/94 9401130290 940106 PDR ADDCK 05000483 P
i TABLE 3.3-3 (continued)
ACTION STATEMENTS (continuedl l
ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
ACTION 19 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
a.
The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and b.
The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.
ACTION 20 - With less than the Minimum Channels OPERABLE, within I hour determine by observation of the associated permissive annunciator window (s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 I
hours and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.
ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least H0T SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 23 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoperable and take the ACTION required by Specification 3.7.1.5.
ACTION 24 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, declare the affected auxiliary feedwater pump inoperable and take the ACTION required by Specification 3.7.1.2.
CALLAWAY - UNIT 1 3/4 3-20a Amendment No. 44, 85 Correction letter of1/6/94 i
- _ ~ -.
TABLE 3.3-4 (CONTINUED) n ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS s
TOTAL SENSOR TRIP ALLOWABLE i
g FUNCTIONAL UNIT ALLOWANCE (TA)
Z ERROR (S)
SETPOINT VALUE
[
8.
Loss of Power (Continued) b.
- Grid Degraded 0.78 0.53 0
107.47V 107.47 i 0.38V Voltage (120V Bus)
(120V Bus) w/119s delay w/119111.6s delay 9.
Control Room Isolation a.
Manual Initiation N.A.
N.A.
N.A.
N.A.
N.A.
b.
Automatic Actuation N.A.
N.A.
N.A.
N.A.
N.A.
Y logic and Actuation O
Relays (SSPS) c.
Automatic Actuation N.A.
N.A.
N.A.
N.A.
N.A.
Logic and Actuation i
Relays (80P ESFAS) d.
Phase "A" Isolation See Item 3.a. above for all Phase "A" Isolation Trip Setpoints and Allowable Values.
- 10. Load Shedder Emergency N.A.
N.A.
N.A.
- !. A.
N.A.
Load Sequencer l
3 0'E
- 11. Engineered Safety RS Features Actuation C.E System Interlocks 0"
$E a.
Pressurizer Pressure, N.A.
N.A.
N.A.
S 1970 psig
$ 1981 psig P-ll' m.
b.
Reactor Trip, P-4 N.A.
N.A.
N.A.
N.A.
N.A.
i R
4 E
- - -