ML20059E399

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Changes 93-10 to Table 6.2.1,Unit 2 & 3, Combining SRO Position W/Sta Position
ML20059E399
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/27/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20059E365 List:
References
NUDOCS 9311030187
Download: ML20059E399 (5)


Text

. - -

i l

l

.1 s

l  !

i ATTACHMENT 2 .l PEACH BOTTOM ATOMIC' POWER STATION l

' UNITS 2 and 3 j Docket Nos. 50-277- t 50-278 License Nos. DPR-44 -

DPR-56  ;

i TECHNICAL SPECIFICATIONS CHANGES 93-10 ,

l I

list of Attached Pages l Unit 2. Unit 3 l '

245 245 '

246 246 l i j

)

9311030187 931027 PDR ADOCK 05000277 i i

P PDR

.-. . _ _ - . . . - - - , . - . . _ - - , ~. ~ . _ . - , _ . . .

l Unit 2 PBAPS  !

Table 6.2.1 Shift Crew Composition - Minimum Requirements I

l One or Both Units Operating *: 1 Shift Manager (SRO) 1 Shift Supervisor (SRO)  !

3 Reactor Operators (RO) j 5 Operators  :

1 Shift Technical Advisor ** l )

Both Units not Operating

  • 1 Shift Manager or Shift Supervisor (SRO) l 2 Reactor Operators (RO)-  ;

5 Operators  ;

SR0 - NRC licensed senior reactor operator ,

R0 - NRC licensed reactor operator

  • For the purpose of this table, a unit is considered not to be operating when it is in a Cold Condition with the reactor mode switch in shutdown or refuel.
    • The STA position may be filled by the on-shift Shift Manager, Shift j Supervisor or other SR0 provided the individual meets the 1985 NRC Policy i Statement on Engineering Expertise on Shift.

i l

1 j

I l

l t

i 1 -245-1

Unit 2 e PBAPS 6.3 Eag_ility a Staff Oualifications 6.3.1 Each member of the facility staff shall meet or exceed the minimum I qualifications of ANSI N18.1-1971 for comparable positicns, except-for (1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 l and (2) the Shift Technical Advisor who shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on i Shift. l l'

6.4 Trainina 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and 10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit l

l 6.5.1 Plant Operations Review Committee (PORC) 6.5.1.1 Function The Plant Operations Review Committee shall function to advise the Plant Manager on all matters related to nuclear safety.

6.5.1.2 Composition The Plant Operations Review Committee shall be composed of the:

Superintendent - 0,9erations (Chairman)

Superintendent - Technical  ;

Superintendent - Maintenance / Instrumentation and Controls  ;

Superintendent - Plant Services  !

, Assistant Superintendent - Operations l Maintenance Engineer l Engineer-Systems l

Reg , siv4 Engineer Shif P mger 6.5.1.3 Alte w Tte, Altern.ie members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

-246-l

Unit 2 i

PBAPS Table 6.2.1 Shift Crew Composition - Minimum Requirements One or Both Units Operating *: 1 Shift Manager (SRO) 1 Shift Supervisor (SRO) 3 Reactor Operators (RO) 5 Operators 1 Shift Technical Advisor **

Both Units not Operating

  • 1 Shift Manager or Shift Supervisor (SRO) l ,

2 Reactor Operators (RO) 5 Operators ,

SR0 - NRC licensed senior reactor operator RO - NRC licensed reactor operator

  • For the purpose of this table, a unit is considered not to be operating when it is in a Cold Condition with the reactor mode switch in shutdown or refuel.
    • The STA position may be filled by the on-shift Shift Manager, Shift Supervisor or other SR0 provided the individual meets the 1985 NRC Policy Statement on Engineering Expertise on Shift.

l 1

i

-24S-  !

J

- m -

Unit 3 PBAPS 6.3 Facility Staff Qualifications

, 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for.

(1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift.

6.4 Trainina 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and  ;

10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant Operations Review Committee (PORC) 6.5.1.1 Function The Plant Operations Review Committee shall function to advise the Plant Manager on all matters related to nuclear safety.

6.5.1.2 Composition

  • The Plant Operations Review Committee shall be composed of the:

Superintendent - Operations (Chairman)

Superintendent - Technical Superintendent - Maintenance / Instrumentation and Controls Superintendent - Plant Services Assistant Superintendent - Operations Maintenance Engineer Engineer-Systems Regulatory Engineer Shift Manager 6.5.1.3 Alternates Alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

-246-i