Notice of Violation from Insp on 900212-14,0530,31 & 0601. Violation Noted:Maint Manager Entered Work Location,But Failed to Sign Special Work Procedures Prior to Initial Entry
ML20059D886
Person / Time
Site: 07200001, 07001308
Issue date: 08/29/1990
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20059D884 List:
References
72-0001-90-01, 72-1-90-1, NUDOCS 9009070219
Download: ML20059D886 (1)


Text

'

NOTICE 0F VIOLATION i

General Electric Morris Operation License No. SNM-2500 I

Morris, Illinois As a result of the inspection conducted on' February 12-14, May 30, 31 and June 1, 1990 and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1989), the following violation was identified:

Condition 13 of Special Nuclear Materials _ License No. SNM-2500, Amendment No. 3, incorporates the-technical specifications contained in Appendices A and B, which requires the licensee to operate the installation in accordance.with the Technical Specifications, amendment application and letters dated June 25, 1982, May 10, 1984 and July 21, 1988.

{

Appendix A, Technical Specifications, paragraph 6.3 Plans and Procedures, i

specifies that plans and procedures shall be established and implemented to assure compliance with technical specifications ard applicable government regulations, j

Plant procedures designed for the safe operation of various plant systems are listed under the following categories:

Consolidated Safety Analysis Report (CSAR); Morris Operations Instructions (M01's); Standard Operating Procedures (S0P's) Safety Manual; Special Work Procedures (SWP); and Regulated Work Procedures (RWP).

M0I-909, Revision 5, Section 4.2, requires that all personnel authorized to perform the work must also sign the SWP (No. 90-08-04,' dated 01/08/90) showing acknowledgement of conditions and safety requirements before starting work.

Contrary to the above, between January 8 and 12,1990, the Maintenance Manager L

entered the work location, but failed to sign the SWP prior to his initial entry.

This is a Severity Level IV violation (Supplement VI)'.

Pursuant to the provisions of 10 CFR 2.201, you.are required to submit to this.

office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:

(1) the corrective actions that have been taken and the results achieved; (2) the corrective actions that will be taken to avoid further violations; (3) the date when full compliance-will be achieved.

Consideration may be given to extending your response time for good cause shown.

NhM d(//fC

.hb4' Datef~

Bruce S. Mallett, Ph.D., Chief Nuclear Materials safety Branch 9009070219 90082?