ML20059D805

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-352/93-29 & 50-353/93-29 on 931102-1213.Enforcement Discretion Exercised on Three Instances
ML20059D805
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/28/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20059D809 List:
References
NUDOCS 9401100089
Download: ML20059D805 (4)


See also: IR 05000352/1993029

Text

,

'

-

g}

. DEC ? 8 nwa

!

Docket Nos. 50-352

!

50-353

l

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company l

l

Nucicar Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-352/93-29 AND 50-353/93-29

This letter transmits the results of the resident safety inspection by Messrs. N. Perry, and

T. Eastick, from November 2, through December 13, 1993, at the Limerick Generating

Station, Limerick, Pennsylvania. The inspection focused on issues important to ensuring the

public health and safety and consisted of observations of activities, reviews of documents and

interviews with plant personnel. The results are documented in the enclosed report and were

discussed with Mr. R. Boyce of your staff at the conclusion of the inspection.

In general, activities ufac found to be conducted safely. In three instances, enforcement

discretion was exercised because of low safety significance and your good efforts in

identifying, evaluating, and taking comprehensive corrective actions. Two instances

concerned the failure to drain portions of the spray pond network piping after use and a

related failure to report this incident in an LER within 30 days. The third instance

concerned a failure to adequately perform a detailed review of a surveillance test and identify -

data not logged as required.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and -

its enclosures will be placed in the NRC Public Document Room.

Your cooperation is appreciated.

Sincerely,  !

l  !

l 0.EICit.7L SIGNED BY 1

i EDWARD C. WENDNGER

0700J5 Edward C. wenzinger, Chief

Projects Branch No. 2

l Division of Reactor Projects

l

Enclosure:

NRC Region I Inspection Report 50-352/93-29 & 50-353/93-29

q;

l 9401100089 931228

PDR I

l

G ADOCK 05000352

l PDR

.

}

-- - . - _ . - - - ._- .-. -- -. . -. .- -

. ..- . ,

-- -

-. ..

l

. .

, ,

I

, DEC 2 8 Igen

Philadelphia Electric Company 2

,

cc w/encis:  !

l

J. Doering, Chairman, Nuclear Review Board

D. R. Helwig, Vice President - Limerick Generating Station -

G. A. Hunger, Jr., Manager - Licensing Section

J. L. Kantner, Regulatory Engineer - Limerick Generating Station i

Secretary, Nuclear Committee of the Board l

Public Document Room (PDR)  ;

Local Public Document Room (LPDR)  !

!

Nuclear Safety Information Cenler (NSIC)

!

K. Abraham, PAO (2)

NRC Resident Inspector, Limerick j

Commonwealth of Pennsylvama i

i

l

l

1

l

!

a

p

.

,

I

a

!

i

,

a

,

- , - , - - .r- - , - ,, y-~ v-.e vy - , * -- g , - w * ,,,g*,y-

'.o ,

, DFC 9 A irm

Philadelphia Electric Company 3

bec w/ encl: y j - ,g [ [ ,

Region I Docket Room (with concurrences) (- -

bec w/ encl: (Via E-Mail)

W. Dean, OEDO  !

F. Rinaldi, NRR

C. Miller, PDI-2, NRR

(fG

RI:DRP

'

[fl

RI:DRP RI:DRP

NPerry CAnderson EWenzinger

12A493 12/H93 12/ /93

OFFICIAL RECORD COPY

g:93299329. lgs

.- _. .--. - - . ...

, EEC ? 8 icm

.

a

Philadelphia Electric Company 3

bec w/ encl:

Chief ICSB/NRR

Region I Docket Room (with concurrences)

bec w/ encl: (Via E-Mail)

W. Dean, OEDO

F. Rinaldi, NRR

C. Miller, PDI-2, NRR

Chief, ICSB, NRR (See Section 2.4) -

/)

  • RI:DRP *RI:DRP *RI:DR3

'{h

Nperry Cander!.on Ewertzinger

12/ /93 12/ /93 12/ff/93

OFFICIAL RECORD COPY

  • See Previous Concurrence Page