Notice of Violation from Insp on 900612-0723.Violation Noted:Failure to Revise Procedure Governing Plant Response to Severe Weather
ML20059D739
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/23/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20059D737 List:
References
50-423-90-10, NUDOCS 9009070163
Download: ML20059D739 (1)


Text

-

6 e

APPENDIX A f'

NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No. 50-423 i

Millstone Nuclear Power Station Unit 3 License No. NPF-49 i

As a result of the inspection conducted on June 12 through July 23, 1990, and in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2 Appendix C (Enforcement Policy,1990), the following violation was identified:

i 10 CFR 50.73(b)(1) states, in part, that a Licensee Event Report (LER) shall contain significant corrective action taken to prevent recurrence of the event.

g i

10 CFR 50.9(a) states, in part, that information'provided to the Commission by a licensee shall be complete and accurate in all

.l I

material respects.

Contrary to the above, on June 12, l989, Licensee Event Report 90-013, dated May 16, 1990, was not accurate in that the procedure which governs i

plant response to severe weather had not-been revised as described. A similar inaccuracy had occurred in LER 89-009, dated June 12, 1989, and corrective action was not effective in preventing recurrence.

This is a Severity Level V violation (Supplement I and VII).

I Pursuant to the provisions of 10 CFR-2.201, No,'heast Nuclear Energy Company is hereby required to submit to this office, v ;nin W cy days of the date of the letter which transmits this Notice, a writte statement or explanation in reply, including:

(1) the corrective steps which nave been taken and the results.

achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending this response time..