ML20059D063

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 6.2.2,paragraph G,Requiring Senior Manager-Operations to Hold SRO License
ML20059D063
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/27/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20059D049 List:
References
NUDOCS 9311020123
Download: ML20059D063 (3)


Text

.

ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 and 3 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 TECHNICAL SPECIFICATIONS CHANGES 93-15 List of Attached Pages t

Unit 2 Unit 3 244 244 I

9311020123 931027 PDR ADDCK 05000277 P

PDR

P Unit 2 PBAPS Continued 6.2.2 Facility Staff The facility organization shall be subject to the following:

a.

Each on-duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2.1, except that the shif t crew composition may be less than the minimum requirements for a period of time not to exceed ! hours-in order to accommodate unexpected absence of on-duty shif t crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

b.

At least one licensed opei ator shall be in the con rol room and assigned to each reactor that contains fuel.

c.

At least two licensed aperators, excluding the _ operator on the second unit, shall be present in the control room during reactor startup, scheduled reactor shutdown and during recovery from reactor trips.

d.

An individual qualified in radiation protection procedures shall be onsite when fuel is in the reactor, e.

All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator i

limited to Fuel Handling who has no other concurrent respon-sibility during this operation.

f.

A Fire Brigade of at least 5 memberF shall be maintained or. site at all times. The Fire Brigade shall not include the minimum shift crew necessary for safe shutdown of the unit (s) (3 members) or any personnel required for other essential functions during a fire emergency.

g.

In addition to the requirements of 6.2.2.a, the Senior Manager-Operations shall hold a Senior Reactor Operator license, i

-244-

~.

Unit 3 PBAPS Continued 6.2. 2 Egil uy ' Off The facility organization shall be subject to the following:

a.

Each on-duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2.1. except that the shift crew composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

b.

At least one licensed operator shall be in the control room and assigned to e4ch reactor that contains fuel, c.

At least two licensed operators,- excluding the operator on the second unit, shall be present in the control room during reactor startup, scheduled reactor shutdown and during recovery from reactor trips.

d.

An individual qualified in radiation protection procedures shall be onsite when fuel is in the reactor, e.

All CORE ALTERATIONS shall be directly supervised - by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent respon-sibility during this operation.

f.

A Fire Brigade of at least 5 members shall be maintained onsite at all times.

The Fire Brigade shall not include the minimum shift crew necessary for safe shutdown of the unit (s) (3 members) or any personnel required for other essential functions during a fire emergency.

g.

In addition to the requirements of 6.2.2.a, the Senior Manager-Operations shall hold a Senior Reactor Operator license.

J

-244-