ML20059D018

From kanterella
Jump to navigation Jump to search
Notification of Significant Closed Meeting on 931018 in Walnut Creek,Ca to Discuss Enforcement Conference Re Two Examples of Apparent Discrimination Against Contract Personnel
ML20059D018
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/07/1993
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 9311020103
Download: ML20059D018 (3)


Text

' -

UNITED STATES j'-

NUCLEAR REGULATORY COMMISSION n

j, i

REGION V O

t,

/

1450 MARIA LANE WALNUT CnEEK. CALIFORNIA 94596-5368 October 7, 1993 NOTICE OF SIGNIFICANT CLOSED MEETING Name of Licensee:

Southern California Edison Company Name of Facility:

San Onofre Units 1, 2, and 3 Docket Numbers:

50-206, 50-361, 50-362 Date and Time October 18, 1993, 10:45 a.m.

of Meeting:

Location USNRC Region V Office of Meeting:

Walnut Creek, California Purpose of Enforcement conference to discuss two examples of Meeting:

apparent discrimination against contract personnel.

NRC Attendees:

B. Faulkenberry, Regional Administrator K. Perkins, Jr., Director, Division of Reactor Safety and Projects S. Richards, Deputy Director, Division of Reactor Safety and Projects H. Wong, Chief, Reactor Projects Section H R. Huey, Enforcement Officer M. Blume, Regional Counsel Licensee Attendees:

H. Ray, Senior Vice President, Power Systems R. Rosenblum, Vice President, Engineering / Technical

. Services W. Marsh, Manager, Regulatory Affairs B. Katz, Manager, Nuclear Oversight T. Habermas, Vice President, Bechtel Power Corporation E. Hernandez, President,-Inter-Con Security Services i

NOTE: Attendance at this meeting by NRC personnel other than those listed above should be made known by October 15, 1993, 4:00 pm, via telephone call to H.~ Wong, (510) 975-0296.

i Approved by:

tr s.

o K. E. Perkins, Jr., Director,. Division of Reactor Safety and Projects 9311020103 931007 DR ADOCK 05000206 I

PDR l

g-Ie.Vf

]

~

2 October 7, 1993 Distribution:

NRC Attendees Listed Above J. Sniezek, DEDO T. Murley, NRR J. Partlow, NRR W. Russell, NRR J. Lieberman, OE-T. Quay, NRR M. Fields, NRR OEDO (Region V Coordinator)

G. Cook, RV D. Kunihiro, RV cc:

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas.

and Electric Co.

T. E. Oubre, Esq., Southern California Edison Company Chairman, Board of Supervisors, County of San Diego Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power 1

Mr. R. W. Krieger, Vice President, Southern California Edison Company Mr. Don J. Womeldorf, Chief, Environmental Management Branch Mr. Thomas E. Bostrom, Project Manager, Bechtel, Power Corporation Mr. Robert G. Lacy, Manager Nuclear Department Mr. Steve Hsu, Radiologic Health Branch Mayor, City of San Clemente Mr. Tom Habermas Vice President and Manager of Nuclear Projects Bechtel Power Corporation San Francisco, California 94119-3965 Mr. E. Hernandez Jr.

Inter-Con Security Services, Inc.

900 South Garfield Avenue Alhambra, California 91801

a i

3 october 7, 1993 bec:

l Docket File 1

M. Smith J. Bianchi REGION V f.

B01 son @

HWon CVa n rgh to / 7 /q3 Al 7 /o y

\\0lg / q UEST COPY

]

R EST COPY

]

M"ES//NO UEST COPY

]

i

, 1E 1

ES

'a /No N0 1

1 v

6 RHuey SRichards KPerkins

/ol,/<73 pin IC PI ] l0 FKQUEST COPY

] FEQVEST COPY

] gREQUEST COPY

).

BESI/ NO 1 YES/ / N0 ll YES)/ NO 1

v y/

g/

t a

ksIOO

! M / 00 V

l J

)

.i i

.1 i

-